Item 7b Declaration of Emergency
Item No.: 7b Declaration of Emergency m Port m Date of Meeting:M of Seattle MEMORANDUM Date: October 16, 2009 TO: Tay Yoshitani, Chief Executive Ofcer FROM: Ralph Graves, MDCDD WG' SUBJECT: DECLARATION OF EMERGENCY The US. Army Corps of Engineers has discovered leaks at the federal Howard Hansen Darn facility and, until repaired, those leaks reduce the amount ofwater that may safely be detained and thus create the likelihood of ooding during winter storms. Dam operations and winter storms are anticipated to cause severe ooding along the Green and Duwamish rivers this year and potentially in the following 3 to 5 years. The Army Corps of Engineers has predicted that the risk of signicant ooding over this period is l in 4. The potential ooding may extend throughout the Green River Valley, and Puget Sound Energy has indicated that the ooding, ifof sufcient magnitude, may affect key Puget Sound Energy electrical distribution substations that provide power to Seattle-Tacoma International Airport (STIA). Puget Sound Energy has made a public presentation to the Washington Utilities and Transportation Commission related to its ood preparedness, has met with members of the Port's senior management team about these issues, and has provided a tour to members of the Port's senior management team of the potentially affected electrical distribution substations. The Airport is dened as critical infrastructure for the Puget Sound Region. As a result, the Port has determined that there is an unacceptable risk of interruption of power to the 'Airport as a result of ooding. With receipt of this information, staffhas begun to evaluate the options for providing 100 percent back-up power for the airport and its operations which impact the region, the United States and the international airspace travel network. To mitigate the potential disruption ofPSE power to the airport, the Port intends to expedite securing design and construction services; leasing and/or purchasing emergency backup generators; purchasing fuel and other necessities; and installing the generators and associated construction work at the North and South Main Airport Substations. It is therefore requested that the Chief Executive Ofcer make a nding that an emergency exists at the Port of Seattle, Seattle-Tacoma International Airport and authorize purchases, the use of Port crews, design and construction services, and the award of public works contracts to effect the emergency back-up power generator capabilities, per RCW 39.04.020 and RCW 39.04.280. J EMERGENCY D CLARED: x \ ' . [QM/4; : ; ; DATED: (2/ g E; {02 1/
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.