Item 7a Supp
ITEM NO: 7a Supp DATE OF MEETING: April 21, 2009 Briefing Update on the Terminal 30 Container Reactivation and Terminal 91 Cruise Terminal Relocation Project Smith Cove Cruise Terminal Entry and Second Floor Lobby 2 Ground Transportation and North End Parking Lot 3 Passenger Boarding Systems Delivery 4 Passenger Boarding System Testing 5 Waterside Crane Beam work April 2009 Waterside Crane Beam work March 2009 Waterside Crane Beam 6 Preparation for Crane Loading 7 Yard Area Looking South 8
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.