8c. Presentation

Seating Replacement and Electrical Infrastructure Projec

Item No. 8c_supp
Meeting Date: February 8, 2022
Seating Replacement and
Electrical Infrastructure Project
CIP# C800959

Project Locations



2

Project Scope
Improve electrical infrastructure throughout Concourse A
Deliver electrical power to seating units to improve passenger experience
This includes new electrical panels, new conduit, new wiring and new recessed floor receptacles
Provide new seating at:
o Concourse A hold rooms
o Security checkpoint recomposure bench locations
o The Club at SEA passenger lounge in the South Satellite
o The west end relaxation area of the South Satellite


3

Purpose
Before                       After
Power at <5% of seating                           Power at 95% of seating
No powered ADA hold room seating             All ADA hold room seating powered
4 ADA seats per hold room                        8-12 ADA seats per hold room
Limited seating                                     400 additional seats

#

4

Gate Hold Room Seating



Before                        After
5

New Accent Seating
Increased passenger comfort
Provides additional locations with
power for customer convenience
Work
Dine
Relax


6

Accessibility
Project will provide
additional accessible
seating equipped with
electrical power to
better meet the needs
of passengers with
mobility challenges.


7

Security Checkpoint Recomposure Area



Before                         After

8

Club at SEA South Satellite Lounge



Before                           After

9

West End Relaxation Area at South Satellite



Before                             After

10

Project Budget & Schedule
Project                                       Key Schedule Milestones
Advertisement                             2022 Quarter 1
Construction start                              2022 Quarter 3
Construction finish                             2023 Quarter 2

Project                 Amount of this request   Previous authorizations   Total estimated project cost
CIP #C800959          $8,550,000              $1,750,000              $10,300,000
Total                     $8,550,000                 $1,750,000                 $10,300,000


11

Project Risks and Mitigation
RISK                         DESCRIPTION                                 MITIGATION PLAN
Existing Floor Outlets     Stakeholders are requesting integration  Survey and evaluate existing
of existing outlets where possible.        outlets.
Utilize existing where practical,
continue with the installation of
new floor outlets where needed.
Seating Layouts          Seating Layouts may need to change     Port crews will make adjustments
after installation to address operational   after installation.
concerns


12

Thank
You!

Operated by the
Port of Seattle

FlySEA.org

Limitations of Translatable Documents

PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.