8c. Presentation
Seating Replacement and Electrical Infrastructure Projec
Item No. 8c_supp Meeting Date: February 8, 2022 Seating Replacement and Electrical Infrastructure Project CIP# C800959 Project Locations 2 Project Scope Improve electrical infrastructure throughout Concourse A Deliver electrical power to seating units to improve passenger experience This includes new electrical panels, new conduit, new wiring and new recessed floor receptacles Provide new seating at: o Concourse A hold rooms o Security checkpoint recomposure bench locations o The Club at SEA passenger lounge in the South Satellite o The west end relaxation area of the South Satellite 3 Purpose Before After Power at <5% of seating Power at 95% of seating No powered ADA hold room seating All ADA hold room seating powered 4 ADA seats per hold room 8-12 ADA seats per hold room Limited seating 400 additional seats # 4 Gate Hold Room Seating Before After 5 New Accent Seating Increased passenger comfort Provides additional locations with power for customer convenience Work Dine Relax 6 Accessibility Project will provide additional accessible seating equipped with electrical power to better meet the needs of passengers with mobility challenges. 7 Security Checkpoint Recomposure Area Before After 8 Club at SEA South Satellite Lounge Before After 9 West End Relaxation Area at South Satellite Before After 10 Project Budget & Schedule Project Key Schedule Milestones Advertisement 2022 Quarter 1 Construction start 2022 Quarter 3 Construction finish 2023 Quarter 2 Project Amount of this request Previous authorizations Total estimated project cost CIP #C800959 $8,550,000 $1,750,000 $10,300,000 Total $8,550,000 $1,750,000 $10,300,000 11 Project Risks and Mitigation RISK DESCRIPTION MITIGATION PLAN Existing Floor Outlets Stakeholders are requesting integration Survey and evaluate existing of existing outlets where possible. outlets. Utilize existing where practical, continue with the installation of new floor outlets where needed. Seating Layouts Seating Layouts may need to change Port crews will make adjustments after installation to address operational after installation. concerns 12 Thank You! Operated by the Port of Seattle FlySEA.org
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.