8o. Presentation
2024 Marine Stormwater Utility Rate Increase
Item No. 8o – supp Meeting Date: November 14, 2023 Marine Stormwater Utility 2024 Rate Adoption November 14, 2023 Sarah Ogier, Director, Maritime Environment & Sustainability Jane Dewell, Senior Manager, Marine Stormwater Utility Action Requested • Request Commission authorization of 8.0% rate increase in 2024 to fund Marine Stormwater Utility • Rate criteria includes: – Maintain adequate budget to meet Port’s Longrange Plan and Utility Charter responsibilities – Continue investment to maintain and improve a high functioning stormwater system to protect water quality – Support a 6-month fund reserve consistent with Port policy and best practices – Maintain consistent rate over a 5-year projection 2 Stormwater Utility Operating Budget 2024 2023 Approved $ in 000’s 2022 Actual 2023 Forecast Estimated Budget Budget Revenue 6,840 7,081 7,081 7,648 Expenses SWU Admin 1,524 1,607 1,607 1,593 Maintenance 2,995 3,592 3,592 4,700 Other 1,139 1,067 1,067 1,318 Total Expense 5,658 6,266 6,266 7,611 Capital Program 1,130 1,218 1,218 1,060 3 Key Accomplishments • 2021-2025 Strategic Plan – Define and track equity goals – Implement digital record-keeping for inspections – Refine plans for green stormwater infrastructure improvements Pipes ready for installation at • Asset Management & Stewardship Terminal 46 – Progress on system rehabilitation – Trenchless construction repairs – New capital projects and project design initiation • Stormwater Innovations – Oyster shell barrels and Splash Boxx – Pilot testing for Hula Bug, Flogard and Retain Drain – Decant facility feasibility analysis Bioretention at Shilshole Bay Marina 4 2024 Proposed Annual Rates City rate % higher Stormwater Rate Category City 2024* Port 2024* than Port Undeveloped (0 – 15% Impervious) Regular Impact $59.05 $46.58 27% Low Impact $34.21 $27.27 25% Light ( 16 – 35% Impervious) Regular Impact $87.62 $72.03 22% Low Impact $68.11 $56.65 20% Medium (36 – 65% Impervious) Regular Impact $124.14 $104.61 19% Low Impact $100.31 $84.15 19% Heavy ( 66 – 85% Impervious) $164.01 $140.37 17% Very Heavy (86 – 100% Impervious) $195.58 $166.03 18% *R ates are shown as $ per 1,000 sq ft 5 Request Adoption of 2024 Rate Questions? 6
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.