8d. Presentation

STS Standpipe Upgrades

Item No.
8d_supp
Date of Meeting
April 8, 2025
STS - Dry Fire Suppression System Upgrades
C801429
Regulatory Funding Request
Project Purpose and Scope
Purpose:
To bring the STS dry fire standpipe systems up to operational pressure standards per NFPA
25 code in all three STS train tunnels; South, North, and Shuttle.
Project Scope:
• Inspect pipe and fittings for excessive corrosion
and pinholes
• Replace any identified deficiencies including:
- existing couplings
- hose valves
- check valves
2
24th Ave S
Project Location
N
Satellite Transit System (STS)
• South Loop
• North Loop
• Shuttle
3
Project Budget
Previous Executive Authorized Budget
Current Request for Authorization
Total Project Cost
$1,971,000
$2,029,000
$4,000,000
4
Project Schedule
5
Cost Certainty
NEPL Phase 3
6
Questions?
7

Limitations of Translatable Documents

PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.