Item 6b Supp
ITEM NO: 6b_Supp DATE OF MEETING: Aug 11, 2009 North Harbor Island Mooring Dolphins (Project 104179) Project Location Previously completed South Wall Reconstruction Proposed South Wall Reconstruction North Harbor Island Mooring Dolphins 2 Project Location North Harbor Island Mooring Dolphins 3 Existing Conditions North Harbor Island Mooring Dolphins 4 Site Plan 5 Proposed Dolphin Design North Harbor Island Mooring Dolphins 6 Proposed North Harbor Island Mooring Dolphins Project Key Points Replacement of existing industrial mooring dolphins Identified as Phase II site for Industrial Moorage Initiative Completed design to be purchased from Crowley Maritime and modified to Port bidding standards All required permits obtained Construction funding approval will be requested in Fall 2009 (with final Engineer's Estimate) Construction to begin Winter 2009 Construction scheduled to be completed by Spring 2010 North Harbor Island Mooring Dolphins 7 North Harbor Island Mooring Dolphins 8
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.