Item 6b Supp
ITEM NO: 6b.Supp DATE OF MEETING: January 13, 2009 Briefing Update on the Terminal 30 Container Reactivation and Terminal 91 Cruise Terminal Relocation Project New Cruise Terminal Building (Front/North and West Faade) 2 New Cruise Terminal Building (South and East Faade) 3 Main Entry Lobby 4 Second Level (Looking South) 5 Second Level (Looking North) 6 Ground Floor (Looking North) 7 Customs and Border Protection - Secondary Inspection 8 Terminal 30 Unit Fender Installation 9 Reefer Racks Installation 10 Longshore Lunchroom Remodel 11 Terminal 30 Dredging Operation 12 Upland Disposal Transfer Facility 13 Upland Disposal Transfer Facility 14 Snow Storm at Terminal 30 15
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.