8g. Presentation
Baggage Optimization Phase 3
Item No. 8g_supp Meeting Date: July 26, 2022 Baggage Optimization – Phase 3 Commission Date July 26, 2022 Commission Request • Phase 2 – Agreement with TSA for screening equipment access • Phase 3 – Additional Pre-Construction authorization request $34,215,000 – General Contractor/Construction Management (GC/CM) • Project Delivery Method • GC/CM Contract – Project Specific Contracts • Construction Management Contract • Airline Technical Representative (ATR) Contract – Design Contract Increase – Port Crews utilization 2 Program Purpose and Scope Purpose: • Airport wide public safety and security program that improves customer service for both airlines and passengers by providing flexibility, reliability, and efficiency. Scope: • The Baggage Optimization project replaces six individual baggage screening systems with a centralized system that optimizes the operation and functionality of the checked baggage system. 3 Phase 1 Phase 2 4 Phase 3 5 General Contractor/Construction Manager (GC/CM) • Allows for Contractor to be an integral part of the team during construction • Allows scored selection that weighs qualification and cost during contractor selection • Shared risk between Port, Designer, and Contractor • Early understanding of construction costs • Phase 2 project delivery method audit recommendation and Airlines preference 6 Risks Risk Probability Impact Mitigation GC/CM will allow us to more accurately identify Unknown and unpredictable market conditions those costs and price drivers as the remainder of for Design Bid Build the design and phasing is completed with the contractor input GC/CM project delivery method is new for Hiring a CM firm to guide and assist the Port Baggage projects – High learning curve Hiring ATR specifically for the project to assist in Operational impacts to Airlines decisions and communication COVID-19 recovery is unpredictable, the team will Unpredictable material and supply chain recovery continue to monitor the risk Estimators are continuously monitoring inflation Unpredictable inflation rates and adjusting Baggage design is at 70% - traditionally GC/CM is Utilize Contractor to assist in the construction done on projects at 30% sequencing of the project Current budget assuming a $20M savings in Ph 2 Continue to monitor Ph 2 budget High Medium Low Schedule 8 Authorizations 9
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.