8c. Presentation
Former United Continental Tank Site Closure
Item No. 8c supp Meeting Date: October 25, 2022 Former United/Continental Tank Farm Site Funding and Agreement Amendment for Site Closure Former United Continental Fuel Farm Site Location 2 History • Tank Farm closed in 1990’s • Contamination discovered during closure • Investigation & remediation initiated in 1995 under a Participation Agreement between United, Continental, Olympic Pipeline & Port • Remediation successful, ceased in 2017 3 Current Request • Commission authorization for the Executive Director to execute Amendment #6 to the Participation Agreement • Deposit of $78,505 to the project escrow account – This Port share is 21% of total cost – Included in ERL forecast • Scope of work to be funded by Amendment #6 – Removal of all remediation system and supporting infrastructure • Buildings, tanks, piping, lighting, fences, etc. – Decommissioning of all monitoring wells – Removal of remnant sheetpile and concrete wall segments from United/Continental Tank Farms 4
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.