8c. Memo
2024 Aviation Fleet Purchases
COMMISSION AGENDA MEMORANDUM Item No. ACTION ITEM Date of Meeting DATE: August 20, 2024 TO: Stephen P. Metruck, Executive Director 8c September 10, 2024 FROM: Mike Tasker, Director, Aviation Maintenance Eric Schaefer, Senior Manager, Aviation Maintenance Dan Alter, Fleet Manager, Aviation Maintenance Louis Ekler, Fleet Assistant Manager SUBJECT: Procurement Authorization for 2024 Aviation Fleet Purchases Amount of this request: Total estimated project cost: $3.979 M $3.979 M ACTION REQUESTED The Aviation Maintenance Fleet Team is requesting Commission authorization for the Executive Director to execute contract(s) for acquisition of approximately sixty-two (62) fleet vehicles, fleet equipment, or fleet tools for approx. $3.979M. This authorization would allow for procurement of fleet that have been approved in the capital budget. This equipment would support operational needs, changing technological standards, improved safety systems, and aligns with the strategy set forth in the Sustainable Fleet Plan, and the Century Goal Agenda EXECUTIVE SUMMARY Aviation and Corporate Division Fleet Replacement Program(s) included the acquisition of approximately sixty-two (62) fleet assets to replace sixty-three (63) aging assets in support of Aviation Division (C801341) and Corporate Division's (C801414) operational needs. All assets were planned for in the 2023 and 2024 Fleet Replacement Plan. The Aviation Maintenance Fleet Team is requesting Commission authorization for the Executive Director to execute contract (s) for the acquisition of approximately sixty-two (62) fleet assets, streamlining the acquisition process, while utilizing strategic sourcing and fleet management "best practices." JUSTIFICATION The Port of Seattle maintains a Fleet of about 919 assets on the Aviation side. This authorization will allow the Port to replace ageing assets that are beyond useful life, procure added assets to support added FTEs and procure small capital tools to support changing job demands. Template revised January 10, 2019. COMMISSION AGENDA - Action Item No. 8c Meeting Date: September 10, 2024 Page 2 of 4 This request covers a variety of equipment from Forklifts, AVM equipment and vehicles, to Police cars. The approval will allow for more fuel-efficient vehicles to be procured including the start of adoption of EVs for Police and the OPS AOS team which are some of the highest gasoline fuel users at the Port. Diversity in Contracting After speaking with the diversity in contracting team, we found that setting a WMBE subcontracting goal for these contracts is not feasible at this time. However, if opportunities to purchase directly to WMBE vendors or suppliers come up, we are committed to seeking their pricing. DETAILS Fleet equipment being replaced is aged and obsolete and often have more effective options available. This request authorizes procurement of equipment and vehicle that have already been approved in budget request. This request is for small capital funded items and does not include large capital or expense funded Fleet items. Schedule Commission construction authorization In-use date Q4 2024 Q4 2024 through Q4 2025 ALTERNATIVES AND IMPLICATIONS CONSIDERED Alternative 1 - Procure equipment that will have charging infrastructure in place. Cost Implications: Reduces initial capital cost by $1.2M, with increased spend on repair, maintenance, and equipment downtime. Pros: (1) (2) Cons: (1) (2) (3) Equipment would be procured that would align with Port Century Goals. Reduce the need to accelerate replacement of equipment that won't meet 2040 Port Century goals. EV infrastructure has taken four plus years for simple installations, deferral would put replaced assets extremely far beyond typical life cycle. Equipment being replaced is beyond useful life which puts additional operational constraints on users of equipment. Deferral of old equipment and vehicles not will still be used and have an increased emission footprint as comparted to new alternatives, even if new alternatives don't meet long term goal. This is not the recommended alternative. Template revised June 27, 2019 (Diversity in Contracting). COMMISSION AGENDA - Action Item No. 8c Meeting Date: September 10, 2024 Page 3 of 4 Alternative 2 - Procure equipment that will have charging infrastructure in place. Rent and or lease fleet equipment for items that don't meet 2040 Century Agenda goals. Cost Implications: Reduction of capital funding by $1.2M, increase to expense funds. Pros: (1) Only would buy equipment and vehicles that fit long term vision. Cons: (1) (2) (3) (4) Port does not have labor bandwidth to implement. Expect short term rental cost to increase overall cost. Budgeting not setup for short term lease or rentals. Not all equipment being replaced can be rented or leased. This is not the recommended alternative. Alternative 3 - Procure equipment that align with Century Agenda goal when possible. Cost Implications: $3.979 M spent on capital equipment. Pros: (1) (2) (3) (4) Cons: (1) (2) (3) Ability to exchange older, less fuel-efficient vehicles with alternative fuel source vehicles that can accommodate the operational needs of staff, when possible Vehicles and equipment come with advanced technology, such as increased safety and environmentally sustainable features that will enhance the stakeholders' experience, while protecting the environment and community. Increased up time of equipment and reduced maintenance and repair cost. Having equipment suited for the task. Initial acquisition costs of fleet assets. Lack of electrical infrastructure and electrical capacity will require added charging options to be added along with more operational flexibility. Some of the Fleet equipment and vehicles being approved now will need to be replaced ahead of traditional schedule to meet 2040 goals. This is the recommended alternative. Template revised June 27, 2019 (Diversity in Contracting). COMMISSION AGENDA - Action Item No. 8c Meeting Date: September 10, 2024 Page 4 of 4 FINANCIAL IMPLICATIONS C801341 - Cost Estimate/Authorization Summary Capital Expense Total Original estimate AUTHORIZATION Previous authorizations $10,000,000 $0 $10,000,000 $4,566,602 0 Current request for authorization $3,059,000 0 $4,566,6 02 $3,059,000 Total authorizations, including this request $7,615,602 0 $7,615,602 COST ESTIMATE Annual Budget Status and Source of Funds CIP C801341 - AV Small Capital Purchases was included in the 2024-2028 capital budget and plan of finance with a budget of $10,000,000. C801341 will be funded by the Airport Development Fund. Financial Analysis and Summary Project cost for analysis Business Unit (BU) Effect on business performance (NOI after depreciation) IRR/NPV (if relevant) CPE Impact $10,000,000 ADMIN NOI after depreciation will increase due to inclusion of capital (and operating) costs in airline rate base. N/A $0.05 in 2026 ATTACHMENTS TO THIS REQUEST (1) Presentation PREVIOUS COMMISSION ACTIONS OR BRIEFINGS None Template revised June 27, 2019 (Diversity in Contracting).
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.