8g. Presentation
Smith Cove Blue Carbon Project ILA
Agenda Item: 8g_supp Meeting Date: September 10, 2024 Interlocal Agreement with Washington State Department of Natural Resources: Smith Cove Blue Carbon Monitoring Study- Phase 2 September 10, 2024 Kathleen Hurley, Sr. Environmental Program Manager Maritime Environment & Sustainability Request Request Commission authorization to execute a 5-year Interlocal Agreement with the Washington State Department of Natural Resources (DNR) to support the second phase of monitoring of the Smith Cove Blue Carbon Project. Total estimated project cost is $227, 000. 2 Smith Cove Project Goals Carbon storage - Generate carbon-rich biomass - Increase retention time Water quality - Remove contaminants - Lower temperature - Offset ocean acidification (raise pH) Fish & wildlife habitat - Create feeding/shelter areas - Increase overall productivity 3 Phase 1: 2018-2023 Accomplishments Between 2018-2021, bull kelp enhancement, eelgrass restoration, and outplant of Olympia oysters were implemented at Smith Cove, followed by monitoring through 2023. • Olympia oysters: Out-planted in two areas in 2018 and 2021 (delayed due to the COVID-19 pandemic). As of 2023, Olympia oyster populations are of moderate density. • Algae: Rock reefs were established in January 2019, while the rock reefs were initially intended as bull kelp substrate, they subsequently became populated by diverse macroalgal species, which increased the carbon cycling capabilities of Smith Cove. • Eelgrass: average percent coverage of plants within the 2,200 ft2 eelgrass study area increased from 29% to 57% between 2018-2022. • Partnerships: Puget Sound Restoration Fund (kelp index station, kelp bulb counts); WA Dept. of Natural Resources (on-going monitoring, octo-pot pilot study); Seattle Aquarium (kelp surveys) 4 Rationale for Phase 2 • Continues progress on the Port of Seattle's Long Range Plan Objective 15, Priority Action 4, "Optimize PORTfolio park and habitat restoration sites to sequester greenhouse gases (GHG's)"; and, Objective 17, "Restore, create, and enhance 40 additional acres of habitat in the Green/Duwamish Watershed and Elliott Bay." • Expands understanding of the benefits of these critical habitats in Central Puget Sound related to carbon sequestration, water quality (specifically seawater acidification) benefits, and habitat productivity. • Long-term data collection will enable the Port to contribute knowledge and expertise applicable to kelp and eelgrass restoration, water quality, and evaluate the carbon sequestration potential in urban environments. 5 Phase 2: 5-year Joint Project 2024-29 Port Responsibilities: • Provide $227,000 in funding to DNR. • Port of Seattle will provide access to the Monitoring Project site and will coordinate with designated DNR personnel for temporary use of Port equipment for purposes of carrying out the Monitoring Project. • Coordinate activities between DNR, Puget Sound Restoration Fund, consultants, port, and interested community groups. 6 DNR Responsibilities: o Staff time of a Natural Resource Scientist I, III, and IV for the duration of this project. o Collection and analysis of sediment samples to assess sediment carbon sequestration. o Monitor sediment accretion and surface sediment properties. o Conduct vegetation surveys in the intertidal area within Smith Cove o Include site in the State's Acidification Nearshore Monitoring Network (ANEMONE) o Maintain/repair water quality sensors and other equipment at the site o Generate a final report summarizing findings 7 Project Schedule Phase 2 includes evaluation of the characteristics of submerged aquatic vegetation (macroalgae and eelgrass), carbon accretion, and carbon sediment sources at the Smith Cove site. - Project Planning and Permits (2024) - Surface Sediment collection (2025-2028) - Sediment accretion monitoring (2025-2028) - Submerged aquatic vegetation monitoring (2025-2028) - Reporting (2025-2028) - Sediment core collection and analysist (2026) - Final Report (2029) 8 Thank you Kathleen Hurley Sr. Environmental Program Manager, Maritime Environment & Sustainability ([email protected]) 9
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.