8d. Memo
STS Standpipe Upgrades
COMMISSION AGENDA MEMORANDUM Item No. ACTION ITEM Date of Meeting DATE : March 20, 2025 TO: Stephen P. Metruck, Executive Director FROM: Keri Stephens, Director, AV Facilities and Capital Programs Chelsey Johannsen, AV F&I Mechanical Engineer 8d April 8, 2025 SUBJECT: STS Standpipe Upgrades (CIP #C801429) Amount of this request: $2,029,000 Total estimated project cost: $4,000,000 ACTION REQUESTED Request Commission authorization for $2,029,000 to increase funding for previous Executive Authorization approved contract to perform regulatory dry fire suppression standpipe system upgrades in the Satellite Transit System (STS) tunnels. EXECUTIVE SUMMARY This project work is regulatory and is required to ensure our Satellite Transit System (STS) Standpipe systems have capacity to undergo working pressures required by National Fire Protection Association (NFPA) and the Port Fire Department. The originally funding approved $1,971,000 by Executive Director Authorization on June 21, 2024. This project has executed four of the seven work orders required through a Job Order Contract (JOC). Current cost estimates have surpassed contractor's initial project cost assumptions due to quantity increases and limited access during regular shutdown work windows in the STS tunnels to maintain operational uptime of the STS system for the traveling public. JUSTIFICATION The STS fire suppression dry standpipe system was hydrostatically tested per NFPA 25 code requirements in April 2024. The results identified pressure deficiencies in the system. This STS Standpipe Upgrade project is returning the existing dry standpipe system back to operational capacity to comply with NFPA 25 code. Template revised January 10, 2019. COMMISSION AGENDA - Action Item No. 8d Meeting Date: April 8, 2025 Page 2 of 3 Diversity in Contracting This project work is utilizing a previously awarded JOC contract that worked with the Diversity in Contracting Department and was awarded the contract with a 6% Disadvantaged Business Enterprise (DBE) goal. Scope of Work Inspect all pipe and pipe fittings, replace all mechanical pipe couplings, hose valves, and pipe or pipe fittings identified to be deficient. Install (2) check valves per (7) system legs. Hydrostatically test STS fire standpipe systems for the North, South and Shuttle to verify operational pressure capacity complies with NFPA 25 code standards. Schedule Project work for STS South loop and Shuttle are to be completed mid-April 2024 Previous DORA authorization Previous Construction start Commission construction authorization Construction start In-use date 2024 Quarter 3 2024 Quarter 3 2025 Quarter 2 2025 Quarter 2 2025 Quarter 4 Cost Breakdown This Request Total Project Construction Total $2,029,000 $2,029,000 $4,000,000 $4,000,000 ALTERNATIVES AND IMPLICATIONS CONSIDERED Alternative 1 - Comprehensive system upgrade. Replace all couplings, hose valves, and add control valves. Inspect pipe and pipe fittings and replace where deficiencies are identified. Cost Implications: $4M Pros: (1) Increases service life of standpipe fire suppression systems. (2) Improves reliability of life safety in case of an event. Cons: (1) Capital expenditures. This is the recommended alternative. Template revised June 27, 2019 (Diversity in Contracting). COMMISSION AGENDA - Action Item No. 8d Meeting Date: April 8, 2025 FINANCIAL IMPLICATIONS Page 3 of 3 Capital Expense Total COST ESTIMATE Original estimate $1,971,000 $0 $1,971,000 Current change Revised estimate $2,029,000 $4,000,000 0 0 $2,029,000 $4,000,000 AUTHORIZATION Previous authorizations Current request for authorization Total authorizations, including this request Remaining amount to be authorized $1,971,000 $2,029,000 $4,000,000 $0 $0 0 0 $0 $1,971,000 $2,029,000 $4,000,000 $0 Cost Estimate/Authorization Summary Annual Budget Status and Source of Funds This project (C801429) was included in the 2025-2029 capital budget and plan of finance with a budget of $1,971,000. A budget increase of $2,029,000 was transferred from the Aeronautical Allowance1 CIP C800753 resulting in zero net change to the Aviation capital budget. The funding sources will be the Airport Development Fund (ADF) and revenue bonds. Financial Analysis and Summary Project cost for analysis Business Unit (BU) Effect on business performance (NOI after depreciation) IRR/NPV (if relevant) CPE Impact $4,000,000 Terminal Building NOI after depreciation will increase due to inclusion of capital (and operating) costs in airline rate base. N/A $0.01 in 2026 Future Revenues and Expenses (Total cost of ownership) There are no significant changes to maintenance requirements to dry standpipe fire suppression system. ATTACHMENTS TO THIS REQUEST (1) Presentation slides PREVIOUS COMMISSION ACTIONS OR BRIEFINGS None. 1 The Aeronautical Allowance is included in the Capital Improvement Plan to ensure funding capacity for unspecified projects, cost increases for existing projects, new initiatives, and unforeseen needs. This ensures funding capacity for unanticipated spending within the dollar amount of the Allowance CIP. Template revised June 27, 2019 (Diversity in Contracting).
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.