Agenda

COMMISSION REGULAR MEETING AGENDA
Port of Seattle
Commission           Date:    July 12, 2016 
Tom Albro              Location:  Port of Seattle Headquarters  Pier 69 
Stephanie Bowman               2711 Alaskan Way, Seattle, Washington 
John Creighton 
Fred Felleman            ORDER OF BUSINESS 
Courtney Gregoire         12:00 noon 
1.  CALL TO ORDER 
Chief Executive Officer 
2.  Recess to EXECUTIVE SESSION*  Pursuant to RCW 42.30.110, if necessary. 
Ted Fick 
1:00 p.m.: Reconvene or Call to Order and Pledge of Allegiance 
Web site:               OPEN PUBLIC SESSION** 
www.portseattle.org 
3.  SPECIAL ORDERS OF BUSINESS 
E-mail: 
3a.  CEO Report for July 12, 2016. (no enclosures) 
Commission-publicrecords
4.  UNANIMOUS CONSENT CALENDAR*** 
@portseattle.org 
4a.  Approval of the minutes of the regular meeting of May 24, 2016. (no enclosures) 
Port Commission:              4b.  Authorization, in accordance with Section 4.2.3.4 of the General Delegation of Authority, for the
(206) 787-3034                  Chief Executive Officer to execute a major public works construction contract with the sole
responsive and responsible bidder to perform the C60 Interim TSA Search Room
Meeting and Agenda              Expansion/Enhancement Project at Seattle-Tacoma International Airport previously authorized on
Information:                        January 12, 2016 (CIP #C800825). (memo enclosed) 
(206) 787-3210 
4c.  Authorization for the Chief Executive Officer to (1) proceed with the Passenger Flow Information
Our Mission:                    System project; (2) procure required hardware, software, vendor services, and maintenance; and
The Port of Seattle is a                 (3) use Port staff for implementation, for a total project cost not to exceed $1,331,000. (memo 
public agency that                   enclosed) 
creates jobs by                  4d.  Authorization for the Chief Executive Officer to execute a contract for the operation and
advancing trade and
management of the Seattle Ramp Tower for an estimated cost of $12,941,000 for up to 8 years (5-
commerce, promoting
industrial growth, and                  year initial with 3 1-year options). (memo and presentation enclosed) 
stimulating economic             4e.  Authorization for the Chief Executive Officer to execute the Sixth Amendment to Lease No.
development 
000042, substantially as drafted and attached, with Gate Gourmet, Inc. at Seattle-Tacoma
International Airport. (memo, lease amendment, and site plan enclosed) 
Strategic Objectives: 
Position the Puget Sound        4f.  Authorization for the Chief Executive Officer to (1) increase the authorized funds for the Security
region as a premier               Exit Lane Breach Control Project  Phase 2 (CIP #C800605) by the amount of $1,300,000 and (2)
international logistics hub             advertise and execute a public works contract to construct this project at Seattle-Tacoma
Advance this region as a           International Airport. The total estimated project cost is $7,707,000.  (memo  and diagram 
leading tourism                  enclosed) 
destination and business
4g.  Authorization for the Chief Executive Officer to advertise and execute a contract to construct the
gateway 
Concourse B Ramp Level Holdroom project, and increase authorized funds for the project by
Use our influence as an
$672,000. The amount of this request is $3,799,000 of a total estimated project cost of
institution to promote
$4,858,000. (memo and presentation enclosed) 
small business growth
and workforce
development 
Be the greenest, and
most energy efficient port
in North America           * An Executive Session may be held at any time after the convening time, if necessary. 
** Please silence all personal electronic devices during the Public Session. 
*** Consent Calendar items are considered routine and are adopted by one motion without discussion. 
If requested, items may be removed from Consent and considered individually following public testimony.














AGENDA  Port Commission Regular Meeting, July 12, 2016, Port Headquarters  Pier 69                                Page 2 
4.  UNANIMOUS CONSENT CALENDAR, Continued 
4h.   Authorization for the Chief Executive Officer to advertise for bids and execute a major construction contract for the Central Terminal
Stairs project at Seattle-Tacoma International Airport for $2,049,000 of a total estimated project cost of $2,560,000 (CIP #C800716). 
(memo and floor plan enclosed) 
4i.    Authorization to add a portion of the IAF Phase II scope to the current Phase I project. This scope will extend the sterile, pre-customs
corridor on Concourse A in order to provide two additional international-capable wide-body gates (Gates A3 and A4). The total
estimated cost of this added scope is $41,000,000, which will increase the total budget for IAF Phase I from $608,365,000 to
$649,365,000. Also request Commission authorization to increase the authorized budget from $300,000,000 to $341,000,000 and for
the Chief Executive Officer to execute needed contract amendments and change orders as required to execute this scope (CIP
#C800583). (memo and presentation enclosed) 
4j.    Authorization for the Chief Executive Officer to (1) advertise and execute a contract for the first phase of construction for the Baggage
Optimization Project at Seattle-Tacoma International Airport at an estimated cost of $115,000,000; (2) amend Service Agreement P-
00317641 in the amount of $3.5 million for a total contract value of $21,500,000 to include construction support; (3) execute contracts
for the purchase of equipment and TSA baggage inspection tables; and (4) utilize Port crews and small works contracts to perform
construction work (CIP #C800612). (memo and presentation enclosed) 
5.  PUBLIC TESTIMONY  Public testimony procedures may be found online at www.portseattle.org/About/Commission/Procedures. 
6.  DIVISION, CORPORATE, AND COMMISSION ACTION ITEMS 
6a.   Authorization to approve a competition waiver in accordance with RCW 53.19.020(5) and authorize the CEO to execute a contract for
up to two years with the Manufacturing Industrial Council for services to increase the pipeline of qualified workers needed to meet the
future workforce needs of maritime, construction, manufacturing and other port-related industries for a total not to exceed $400,000. 
(memo enclosed) 
6b.   Authorization for the Chief Executive Officer to execute Change Order 38 to Contract MC-0318131, Runway 16C/34C
Reconstruction, at Seattle-Tacoma International Airport in the amount of $900,000 (CIP #C800406). (memo enclosed) 
6c.   Authorization for the Chief Executive Officer to execute a design contract and prepare design and construction bid documents for the
Restroom Upgrades at Concourses B, C, and D project at Seattle-Tacoma International Airport for an estimated $5,032,000 of a total
project cost of $33,047,000 (CIP #C800697). (memo and presentation enclosed) 
7.  STAFF BRIEFINGS 
7a.   Sustainable Airport Master Plan Briefing. (memo, presentation, and report enclosed) 
8.  ADDITIONAL NEW BUSINESS 
9.  ADJOURNMENT

Limitations of Translatable Documents

PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.