4c supp
Item No. 4c_ supp_______ Meeting Date: October 25, 2016 Cargo 2 - 400 Hz In-ground Power Station Retrofit Cargo 6 - 400 Hz In-ground Power Station Retrofit 2017 Airfield Pavement Project Seattle-Tacoma International Airport (STIA) 1 Construction Overview Cargo 6 Cargo 2 Two Construction Locations: Cargo Area 2 and 6 2 Existing 400 Hz In-ground Power Station Safety concerns were raised after the existing 400 Hz power stations were installed. 3 400 Hz Pop-up Power Station 400 Hz pop-up power station is the recommended retrofit alternative. 4 2017 Airfield Pavement Project An aircraft parking at Cargo Area 2 with the right main gear on asphalt pavement not designed for such a load. 5
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.