6c attach 2
Exhibit B: City-Port of Seattle Drainage System Connection Table Item No. : 6c_attach 222222 7/8/2016 Date of Meeting: September 27, 2016 COS discharge to Port of Seattle POS pipe with a Other COS to Further work or Connection discharge limit or Port Port discharge investigation Point ID City of Seattle Connection Point ID Port Mapbook Page Port Facility requirement discharge to COS needed? May 2016 Next steps Lead on next steps May 2016 Notes 3 SBM-3 5 SBM yes No See ILA Exhibit C. Port to field verify configuration, clean and 8 FT-01 7 FT yes Yes CCTV. Discuss in 2017 Port SPU has offered to help contribute towards wetland 10 T91-01 8 T91 yes No revegetation if needed See ILA Exhibit C. Port to field verify connection location needed for future SPU 12 T91-02 8 T91 yes Yes Easement. Discuss in 2017. Port See ILA Exhibit C. Port to field verify connection location needed for future SPU 13 T91-03 9 T91 yes Yes Easement. Discuss in 2017. Port Yes - Industrial 15 T91-07 10 MMNO Permit No Yes - Industrial 16 T91-05 10 MMNO Permit No Maybe - Industrial Port to field verify connection. Discuss in 17 T91-04 10 MMNO Permit Yes 2017. Port 18 T91-08 12 Tsubota yes No SPU will confirm disconnection status when Yes - Industrial construction is complete and provide as built Area under construction. Likely 23 NA 13 T46 Permit TBD? Yes or other record. Discuss in 2017. SPU disconnected. 27 T25-01 14 T25 yes No 31 MMS-02 15 MMShop yes No Connection is Port Drainage to 32 MMS-03 15 MMShop yes No SPU Combined Connection is Port Drainage to 33 MMS-04 15 MMShop yes No SPU Combined Connection is Port Drainage to 34 MMS-05 16 MMShop yes No SPU Combined Connection is Port Drainage to 35 MMS-01 15 MMShop yes No SPU Combined 39 T18-05 16 P16 yes No Port to field verify that SPU CB and pipe are 40 NA 16 P16 NA Yes disconnected. Discuss in 2017. Port 41 T18-06 16 P16 yes No 42 T18-08 16 P16 yes No 44 T18-09 16 HIC yes No 45 T18-10 16 HIC yes No 46 T18-26 16 HIC yes No 58 T18-15 17 HIC yes No 59 T18-14 17 T18 yes No 61 T18-13 17 T18 yes No 62 T18-12 17 T18 yes No 63 T18-11 17 T18 yes No 64 T18-16 18 T18 yes No 65 T18-17 18 T18 yes No Page 1 of 5 Exhibit B: City-Port of Seattle Drainage System Connection Table 7/8/2016 COS discharge to Port of Seattle POS pipe with a Other COS to Further work or Connection discharge limit or Port Port discharge investigation Point ID City of Seattle Connection Point ID Port Mapbook Page Port Facility requirement discharge to COS needed? May 2016 Next steps Lead on next steps May 2016 Notes 66 T18-18 18 T18 yes No 67 T18-19 18 T18 yes No 68 T18-21 19 T18 yes No 69 T18-20 19 T18 yes No Yes - Industrial Permit. Location is controlled by Port via Street Use Permit 71 T18-23 19 T18 #99920. No 72 T18-25 19 T18 yes No To be addressed as part of T-5 Street Vacation documentation process. Check in on status in Difference of opinion on 76 NA 20 T-5 Yes 2017. Port ownership of mainline To be addressed as part of T-5 Street Vacation documentation process. Check in on status in Difference of opinion on 77 NA 20 T-5 Yes 2017. Port ownership of mainline To be addressed as part of T-5 Street Vacation documentation process. Check in on status in Difference of opinion on 78 NA 20 T-5 Yes 2017. Port ownership of mainline 80 T5-02 21 T5 yes No 81 T5-03 21 T5 yes No 82 T5-04 21 T5 yes No 83 T5-01 21 T5 yes No 84 T5-05 21 T5 yes No 94 T106-24 23 T106 yes No ConGlobal Property has an 95 T106-25 23 T106 yes No Industrial Permit. 96 T106-26 24 T106 yes No 97 T106-27 24 T106 yes No 98 T106-28 24 T108 yes No 100 T115-02 25 T115 yes No 101 T115-04 25 T115 yes No 102 T115-05 25 T115 yes No 103 T115-06 25 T115 yes No 104 T115-07 25 T115 yes No 105 T115-17 26 T115 yes No 106 T115-14 26 T115 yes No 107 T115-18 26 T115 yes No 108 T115-13 26 T115 yes No Port to share Foley Enterprises As-built 1996 Port 109 NA 26 T115 yes No Port to share Foley Enterprises As-built 1996 Port 110 T115-11 26 T115 yes No 111 T115-08 26 T115 yes No 114 T18-01 16 T18 yes No 115 T18-02 16 T18 yes No 116 T18-03 16 T18 yes No 117 T18-22 19 T18 yes No 118 T106-02 23 T106 yes No 119 T106-03 23 T106 yes No 120 T106-05 23 T106 yes No 121 T106-06 23 T106 yes No Page 2 of 5 Exhibit B: City-Port of Seattle Drainage System Connection Table 7/8/2016 COS discharge to Port of Seattle POS pipe with a Other COS to Further work or Connection discharge limit or Port Port discharge investigation Point ID City of Seattle Connection Point ID Port Mapbook Page Port Facility requirement discharge to COS needed? May 2016 Next steps Lead on next steps May 2016 Notes 122 T106-08 23 T106 yes No 123 T106-29 23 T106 yes No 124 T106-10 23 T106 yes No 125 T106-11 23 T106 yes No 126 T106-13 23 T106 yes No 127 T106-14 23 T106 yes No 128 T106-15 23 T106 yes No 129 T106-17 23 T106 yes No 130 T106-19 23 T106 yes No 131 T106-21 23 T106 yes No 132 T106-22 23 T106 yes No 133 T106-18 23 T106 yes No TBD. SPU thinks 138 T91-06 10 MMNO yes Yes Port to field verify. Discuss in 2017. Port Port to field verify if tree is growing over CB 139 NA 24 T-108 TBD? Yes and if CB exists. Discuss in 2017. Port Discharge from bridge is to a 140 NA 6 FT N/A No concrete pad by the permit area 142 T115-10 26 T115 yes No 143 T18-24 19 T18 yes No 144 T18-04 16 T18 yes No 146 T18-07 16 T18 yes No 147 NA 12 Tsubota Yes 148 SBM-1 3 SBM yes See ILA Exhibit C yes, unless ownership 201 NA 4 SBM transfer No See ILA Exhibit C yes, unless ownership 202 NA 4 SBM transfer No See ILA Exhibit C yes, unless ownership 204 NA 5 SBM transfer No See ILA Exhibit C yes, unless ownership 205 NA 5 SBM transfer No See ILA Exhibit C yes, unless ownership 206 NA 5 SBM transfer No See ILA Exhibit C No as-builts, but Port has verified 207 T115-01 25 T115 yes No map is correct To be addressed as part of T-5 Street Vacation documentation process. Check in on status in Difference of opinion on 211 NA 21 T5 Yes 2017. Port ownership 212 T5-06 21 T5 yes No Port Drainage to SPU Combined 213 T115-16 26 T115 yes No 214 T115-15 26 T115 yes No See ILA Exhibit C. Next step is a base map of 216 NA 28 T104 Yes infrastructure with property SPU Page 3 of 5 Exhibit B: City-Port of Seattle Drainage System Connection Table 7/8/2016 COS discharge to Port of Seattle POS pipe with a Other COS to Further work or Connection discharge limit or Port Port discharge investigation Point ID City of Seattle Connection Point ID Port Mapbook Page Port Facility requirement discharge to COS needed? May 2016 Next steps Lead on next steps May 2016 Notes See ILA Exhibit C. Next step is a base map of 217 NA 28 T104 Yes infrastructure with property SPU See ILA Exhibit C. Next step is a base map of 218 NA 28 T104 Yes infrastructure with property SPU See ILA Exhibit C. Next step is a base map of 219 NA 28 T104 Yes infrastructure with property SPU 221 T106-23 23 T106 yes No 223 T115-09 26 T115 yes No Port Drainage to SPU Combined 224 T106-01 23 T106 yes No Port Drainage to SPU Combined 226 T106-16 23 T106 No Port to field verify. Discuss in 2017. Port Removed by SPU. 227 T106-20 23 T106 No Port to field verify. Discuss in 2017. Port Removed by SPU. Port to research this connection as well as new connection T115-19 added to the table. Plan 877-53-1 shows both 232 T115-12 26 T115 yes? Yes Discuss in 2017. Port connections. 233 SBM-2 3 SBM yes See ILA Exhibit C. 404 Central 1 4 SBM No See ILA Exhibit C 405 Central 2 4 SBM Yes See ILA Exhibit C 407 South 2 5 SBM Yes See ILA Exhibit C 408 South 2 5 SBM Yes See ILA Exhibit C 409 South 3 5 SBM Yes See ILA Exhibit C 410 South 3 5 SBM Yes See ILA Exhibit C 411 South 4 5 SBM Yes See ILA Exhibit C 413 23rd W & W Crockett St 8 T91 Yes See ILA Exhibit C 415 Dead end of W Plymouth St 9 T91 Yes See ILA Exhibit C 416 11 T91 No SPU Easement #7706301185 SPU Easement #s: 8406050823, 417 T46 13 T46 No 8208270495, 7111090334 418 14 T25 No SPU Easement# 7108180366 Easement in development in Port- 419 16 T18 No SPU T-18 Street Vacation process SPU Easement # 5674818; New easement in development in the Port-SPU T-18 Street Vacation 420 17 T18 No process To be addressed as part of T-5 Street Vacation documentation process. Check in on status in Ownership difference of opinion 421 20 T5 Yes 2017. Port (see # 76, 77, 78) To be addressed as part of the T-5 Street Vacation documentation process. Check in on 422 21 T5 No status in 2017. Port SPU Easement need 423 22 T105 No SPU Easement #20110922001010 424 23 T106 No SPU Easement #6626023 425 25 T115 No SPU Easement #6412219 426 26 T115 No SPU Easement #6679400 427 Line around building 26 T115 Yes See ILA Exhibit C City reserved right under 428 27 T30 No Ordinance 89141 (3-18-1960) Page 4 of 5 Exhibit B: City-Port of Seattle Drainage System Connection Table 7/8/2016 COS discharge to Port of Seattle POS pipe with a Other COS to Further work or Connection discharge limit or Port Port discharge investigation Point ID City of Seattle Connection Point ID Port Mapbook Page Port Facility requirement discharge to COS needed? May 2016 Next steps Lead on next steps May 2016 Notes 429 28 T104 Yes See ILA Exhibit C 430 28 T104 Yes See ILA Exhibit C 431 29 T-117 No SPU Easement #20150320000610 432 28 T104 Yes See ILA Exhibit C SPU to share title search documentation, Port # Needed T104-01 28 T104 yes Yes to field investigate. Discuss in 2017. SPU, then Port Port to research this connection as well as new connection T115-19 added to the table. Plan 877-53-1 shows both # Needed T115-19 26 T115 yes? Yes Discuss in 2017. Port connections. Under Ordinance 124477, the Port is dedicating ROW and easements to the City. Storm lines owned by Page 28 28 near T104 No See ILA Exhibit C SPU Page 5 of 5
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.