6e supp

Item No.: 6e_Supp 
Date:   September 13, 2016 
Net Sheds 3, 4, 5 and 6 Roof
Replacements

Net Sheds 3, 4, 5 and 6 Roof Replacements 
Net Shed 4 

Net Shed 6     Net Shed 5                    Net Shed 3 

Substation #7 



Fishermen's Terminal Net Shed Project Area 
2

Existing Net Sheds 3 & 4 

NS3 
NS4 



Existing Roof  Looking North 
3

Existing Net Sheds 5 & 6 

NS5          NS6 
NS3 
NS4 



Existing Roof  Looking South 
4

Existing Roof and Gutter System 
(Net Sheds 3 & 4) 



Existing Deteriorated Gutter Elements 
5

Existing Roof Penetration 
(Net Sheds 5 & 6) 



Existing Deteriorated Rooftop Penetrations 
6

Incorporate Sustainable Elements 
Increase Insulation Value 
Reduced Heat Island effect by Utilizing Reflective Cap sheets 
Recycling of Demolished Materials 
Durable Roof System that can last 30 years as specified 
The project team will also evaluate: 
Bio filtration units at the downspouts
Installation of Solar Panels as a demonstration project 
( Photovoltaic (PV) power production). 
Sustainable Elements included in Design Effort 
7

Timeline 
2017 Planning 
2016 Planning 
CEM (Research) 
Pier 69 (Feasibility Q4 2016) 
P66 (Planning) 
Maritime Site Feasibility Study 
UW Solar/POS Engineers 
CEM (Preliminary Engineering Analysis TBD) 
Evaluation with Roofing    Specific Facility Eval. (2017) 
C-173-Terminal 91           New Buildings 
Century Agenda          Net Sheds-Fishermen's Terminal        SBM restrooms (Planning) 
"Meet all increased energy
Dukes Restaurant (Planning) 
needs through conservation
and renewable sources." 

Meet all increased energy needs through conservation and renewable sources 
8

Projects 
Pier 69                                  FT Net Shed #5                          CEM 
kWh Output : 320,000                   kWh Output: 11,000/Yr.                kWh Output: 3-5 MW 
Savings: $23,000                        Savings $840 /Yr.                      Savings $ TBD 
CO2 deferred: 11,000 lbs.                   CO2 deferred: 279lbs.                   CO2 deferred: 138,000 Ibs. 






The PV output estimations (conservative) on Net Sheds #5. 
9

Net Shed 5 or 6 PV Demonstration Project 

Net Shed 5 

Substation #7 


Net Shed Solar Demonstration project location 
10

Next Steps 
Complete Design              4th Quarter 2016 
Request Construction Authorization    1st Quarter 2017 
Construction Starts              2nd Quarter 2017 
Construction Complete           4th Quarter 2017 


Net Shed Roof Project Schedule 
11

Action Requested 
Description 
Request  Commission  authorization  for  the  Chief  Executive  Officer  to  complete  design 
documents for the Fishermen's Terminal Net Sheds 3, 4, 5, and 6 Roof Replacement Project 
including a solar panel demonstration study on one net shed for an estimated cost of $195,000, 
bringing the current authorization to $270,000 for an estimated total project cost of $3,186,000. 



Action requested 
12

Any Questions? 


Any Questions 
13

Limitations of Translatable Documents

PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.