6a memo

PORT OF SEATTLE 
MEMORANDUM 
COMMISSION AGENDA               Item No.      6a 
ACTION ITEM 
Date of Meeting     April 22, 2014 
DATE:    April 14, 2014 
TO:      Tay Yoshitani, Chief Executive Officer 
FROM:   Patricia Spangler, Real Estate Manager 
Melinda Miller, Director, Portfolio and Asset Management 
SUBJECT:  Pier 69/Vine Street Permit Leases- Clipper Navigation, Inc.: Terminate Two
Existing Term Leases; Enter into Two New Leases. 
ACTION REQUESTED 
Request Commission authorization for the Chief Executive Officer to terminate two existing 
leases and enter into two new leases, with Clipper Navigation, Inc. (Clipper) that include Pier 69
for a term of fifteen years ending April 30, 2029 with one five year option to extend and a
separate lease for the Vine Street Submerged Land for a term of seven years, eight months and
fifteen days with a first option to extend until April 30, 2029 and a second five year option 
substantially as drafted in Attachment 1 and according to the terms laid out in this memorandum
at a fair market rate. 
SYNOPSIS 
To provide for an improved customer experience, Clipper Navigation, Inc., a long term tenant at
Pier 69, is proposing modifications to their offices, restrooms, and the terminal facilities that will
include upgrades to the lighting, ceiling, flooring, walls and sprinkler system. The estimated cost
of the proposed improvements is approximately $700,000.  The Port will provide a tenant
improvement allowance of $200,000 to be utilized toward the proposed improvements.
Port staff proposes two new leasesone for Pier 69 leased premises and one for the Vine Street
Submerged Land leased premises at the terms discussed later in this memo. Based on the Port
staff's determination of initial market rates for use of the Premises, the total projected rent to be
received over the terms of these two new leases is approximately $ 3,208,219. . 
BACKGROUND 
Founded in 1986, Clipper Navigation, Inc. is a privately held company in Seattle, Washington
that provides multiple transportation and vacation packages (many of which are offered under
the name Clipper Vacations) that i nclude hotel and tour packages in Victoria, Seattle,
Vancouver, Friday Harbor, Portland, Whistler, British Columbia the Canadian Rockies and
Kelowna. Clipper also offers gray and orca whale watching. The Clipper fleet consists of three 
catamarans; all of which are high speed ferriesClipper IV being one of the fastest passenger
vessels in the western hemisphere. Clipper employs 104 full time staff year round and 139 full

Template revised May 30, 2013.

COMMISSION AGENDA 
Tay Yoshitani, Chief Executive Officer 
April 14, 2014 Page 2 of 7 
time staff during peak season May through September with a total gross payroll of approximately
$5.3 million dollars for 2013. Clipper boosts the local economy through year-round vacation
packages that include hotel accommodations, shopping, dining and attending sports events, as
well as sightseeing tours. 
Clipper Navigation has been a tenant at Pier 69 since 1987. The Port entered into the Pier 69
Lease with Clipper in July 1989. The lease  was subsequently amended in September 1991 to
include additional office space and the Vine Street submerged land. A second amendment was
completed in January 2003 which extended the term from twenty to thirty years, expiring April
30, 2019 and included Special Improvement rent that provided Clipper with funding in the
amount of $350,000 to repair and improve the berthing and docking area. The Port recently
entered into a separate lease with Clipper for approximately ninety-one square feet of storage on
the fingerling dock on the south side of Pier 69. 
Clipper's existing lease agreement includes a provision for a market rate adjustment effective
May 1, 2014. During the recent rent renegotiation, Clipper notified the Port of their desire to
refurbish the public areas of their Premises (terminal, restrooms and corridor), the cost of which
are estimated at $700,000.  In order to achieve a viable financial return on the investment,
Clipper requires a longer term and requested an amendment to their current lease, which expires
on May 30, 2014 to extend the term an additional ten years, expiring on May 30, 2029, and
includes an option to extend for an additional five years. Clipper also asked that the Port
consider paying $200,000 toward the cost of these improvements which include modifications
that will bring the restrooms up to current code compliance and will provide upgrades to the
electrical and fire sprinkler systems. 
Port staff has determined that it is in the Port's best interest to enter into two new leases which
will: 
a)     Eliminate the twenty-five year old lease document and update the agreements between
the Clipper   and the Port to reflect the Port's current standard language; in particular as it
relates to insurance  and indemnity;
b)     Provide a separate lease for the Pier 69 leased premises and one for the Vine Street
Permit area   which will align that lease expiration with the expiration of the permit; 
c)     Include the extended terms and renewal options as proposed; 
d)     Include the currently negotiated/market rents; 
e)     Include the proposed improvements estimated at $700,000, and the Port's investment of
$200,000    toward those improvements, thereby increasing the value of the Port asset. 
MARKETING CONDITIONS 
Clipper's current agreement has a provision for a market rate adjustment to commence May 1,
2014. To determine the market rate for Clipper's specific use, the Port staff engaged the services
of an architect to field verify the size and use of the premises and engaged the services of a real
estate appraisal firm through an existing IDIQ contract.

COMMISSION AGENDA 
Tay Yoshitani, Chief Executive Officer 
April 14, 2014 Page 3 of 7 
The appraisal evaluated recent lease transactions of other similar use properties in the Seattle
area and concluded market rates that would generate $304,107 per year vs. the current annual
rent of $274,065 with CPI rent increases every 30 months. Taking into consideration the market
rates supported by the appraisal, the Port negotiated a new annual rent of $294,650. Port staff
also negotiated accelerating  the CPI rent adjustment from every 30 months to annual
adjustments, with market rate adjustments every five years. Also, under the current lease the
Port reimburses Clipper for the annual cost of the Vine Street Permit, which is approximately
$13,500 for 2014 and subject to annual escalations. In the new lease, the Port will no longer
reimburse Clipper for the cost of the Vine Street Permit. Under the new lease agreement Clipper
will reimburse the Port for the annual Vine Street Permit fee. Together, under the new lease
agreements, the effective result is that the Port increases the total net revenue from Clipper 13%
over their current revenue and reduces its risk as the Port will not be responsible for the cost of
the Vine Street Permit and annual escalations. 
Although the initial term for the new Vine Street Submerged Land Lease is actually seven years,
eight months and fifteen days; the analyses of the two lease agreements assume fifteen year
terms for both the Pier 69 Lease and the Vine Street Submerged Land Lease. It is assumed that 
SDOT will extend the Vine Street Permit at the end of its term in order for Clipper to continue to
operate their business. The savings resulting from the Clipper payment of the Vine Street Permit
was included in the analysis of this transaction.
TERMS OF PROPOSED LEASES 
The major elements of the proposed term leases are outlined below: 
A)    PIER 69 LEASE 
Term:          Fifteen years, Commencing May 1, 2014 
Expiring April 30, 2029 
Option To Extend:   One five year option 
Use:            Waterborne passenger transportation services in the State of Washington, 
and between the State of Washington and the Coast of British Columbia,
as well as harbor tours, dinner cruises and sales of travel, sightseeing and
hotel accommodation packages in connection with Clipper marine
transportation services. 
Premises:         Premises consist of approximately 47,672 square feet comprised of
general administration office, working area, inside storage, outside
storage, some portions of the north and south apron, submerged land for
berthing and a kiosk. 
Base Rent:        5,818 sf of Office @ $16.00/sf/yr. = $93,088.00/yr.  12 = $7,757.33/mo. 
6,174 sf of Working Area @ $14.00/sf/yr. = $86,436.00/yr.  12

COMMISSION AGENDA 
Tay Yoshitani, Chief Executive Officer 
April 14, 2014 Page 4 of 7 
= $7,203.00/mo. 
5,765 sf of Storage @ $7.10/sf/yr. = $40,931.50/yr.  12 = $3,410.96/mo. 
91 sf of Outside Storage @ $6.05/sf/yr. = $550.55/yr.  12 = $45.88/mo. 
8,909 sf of South Apron @ $2.10/sf/yr. = $18,708.90/yr.  12 
= $1,559.08/mo. 
952 sf of North Apron @ $2.10/sf/yr. = $1,999.20/yr.  12 = $166.60/mo. 
10,643 sf of Submerged Land (Berth A) @ $2.60/sf/yr. = $27,671.80/yr.  
12 = $2,305.98/mo. 
9,240 sf of Submerged Land (Berth B) @ $.50/sf/yr. = $4,620.00/yr.  12
= $385.00/mo. 
80 sf of Kiosk @ $40.80/sf/yr. = $3,264.00/yr.  12 = $272.00/mo. 
Rent Increase:      Annual rent increases by CPI and every sixth year a market rate
adjustment is negotiated. 
Operating Expenses:  Tenant is responsible for all the utilities and repairs and maintenance
within the Premises. 
Port Improvements:  The Port will provide $200,000 toward the cost of renovating the terminal
reception area, corridor and restrooms.
Security Deposit:    The Security Deposit is one hundred twenty six thousand seven hundred
thirty two and 80/100 dollars, equal to approximately four and one-half
month's rent. 

(B)   VINE STREET SUBMERGED LAND LEASE 
The major elements of the proposed term lease are outlined below: 
Term:          Seven years, eight months and fifteen days commencing May 1, 2014 and
expiring               January 15, 2022. 
Options to Extend:   First Option: Additional seven years, three months and fifteen days to
expire concurrent with Pier 69 Premises Lease #002533. 
Second Option: Additional five years concurrent with the Pier 69 Premises
Lease #002533.

COMMISSION AGENDA 
Tay Yoshitani, Chief Executive Officer 
April 14, 2014 Page 5 of 7 
Use:            Maintenance and operations of a pedestrian boat moorage and passenger
loading facility consistent with the permission granted in Ordinance
124012 and consistent with the provision of waterborne passenger
transportation services 
Premises:         Premises Consists of approximately 34,760 square feet of Vine Street
Right of Way 
Base Rent:        34,760 sf of Vine Street Right of Way @ $.50/sf/yr. = $176,380/yr.  12 =
$1,448.33/mo. 
Rent Increase:      Annually rent increases by CPI and every sixth year a market rate
adjustment is negotiated. 
Operating Expenses:  Tenant is responsible for all the utilities and repairs and maintenance of
the Facility abiding by all provisions under the Ordinance 124012. 
Tenant will reimburse the Port for the annual Vine Street Permit fee. 
Port Improvements:  None 
Security Deposit:    The Security Deposit is seven thousand six hundred forty two and 23/100
dollars, equal to approximately four and one-half month's rent. 
FINANCIAL IMPLICATIONS 
Budget/Authorization Summary              Capital     Expense   Total Project 
Original Budget                            $0          $0          $0 
Previous Authorizations                       $0          $0          $0 
Current request for authorization                  $0      $200,000      $200,000 
Total Authorizations, including this request           $0          $0          $0 
Remaining budget to be authorized               $0          $0          $0 
Total Estimated Project Cost                    $0     $200,000     $200,000 
Project Cost Breakdown                     This Request       Total Project 
Tenant Improvement (TI) Allowance               $200,000          $200,000 
Other                                        $0              $0 
Total                                       $200,000           $200,000 
Budget Status and Source of Funds 
As the Clipper's lease was not up for renewal in 2014, the Real Estate Division's 2014 Operating
Budget did not specifically include a tenant improvement allowance for this lease. However,
based on historical experience, it is expected that lower spending on other budgeted tenant
improvements will offset any potential unfavorable expense variance related to this allowance. 
The source of funds will be the Real Estate General Fund.

COMMISSION AGENDA 
Tay Yoshitani, Chief Executive Officer 
April 14, 2014 Page 6 of 7 
Financial Analysis and Summary 
CIP Category         N/A 
Project Type          N/A 
Risk adjusted discount   7.0% 
rate 
Key risk factors        Risk of tenant default, which is partially mitigated by: 
Security deposits totaling $134,375 
Good standing status as a current tenant of the Port 
Project cost for analysis   $200,000 
Business Unit (BU)      Portfolio Management, Real Estate Division 
Effect on business      The incremental impact of the new lease on Net Operating Income
performance         (NOI) for Year 1 through Year 5 is shown below: 
Incremental Incr/(Decr)
NOI (in $000's)      Year 1    Year 2    Year 3    Year 4    Year 5
Revenue          $5     $12     $20     $13     $13
Expenses          $187     ($14)     ($15)     ($16)     ($17)
NOI           ($182)    $26     $35     $29     $30
Incremental revenue is generated by: Accelerating CPI adjustments,
adding new lease area, converting a month-to-month lease to a term
lease, and extending the lease termination date 10 years. Incremental
expense is generated by: Tenant improvement allowance, partially
offset by the elimination of the annual Vine Street Permit expense 
currently paid by the Port. 
Note that the most significant the incremental increase to NOI (the
extension of the lease termination) occurs in Year 6 through Year 15 
starting at approximately $330K in year 6 growing to approximately
$400K in year 15. 
It is possible that a portion of the tenant improvement allowance may
qualify for capitalization, but sufficient information is not available to
reach that conclusion at this time. To be conservative, the allowance is
assumed to be 100% expense. Lower Net Operating Income in Year 1 is
primarily a reflection of the payment of the tenant improvement 
allowance. 
IRR/NPV           NPV   IRR   Payback
(in $000's)   (% )     Years
$1,820     NM       5
The NPV is based on incremental net cash flows generated by the lease
and does not factor in the underlying value of the land and
improvements. The basis for establishing the market rates for the lease
is described in the memo under "Marketing Conditions."

COMMISSION AGENDA 
Tay Yoshitani, Chief Executive Officer 
April 14, 2014 Page 7 of 7 
ALTERNATIVES AND IMPLICATIONS CONSIDERED 
Alternative 1) Renegotiate Clipper's rent to current market rate effective May 1, 2014 per the
market rate adjustment in their current lease, with the all other terms of the agreement remaining
the same including: 1) CPI increase every thirty months 2) the Port remaining responsible to
reimburse Clipper for the annual Vine Street Permit fee, which is $13,500 for 2014 and is subject
to annual escalations and 3) loss of the $57,000 incremental revenue the Port would receive
under the new lease over the remaining five year term. Clipper may choose to relocate to other
existing terminals along Alaskan Way or to alternative locations that may become available
through the new waterfront redevelopment at the end of their term, April 30, 2019. As a result of
Clipper vacating, the Port would then be left with finding another compatible water dependent
user that is shoreline compliant. The Port would likely incur a loss of revenue during the vacant
period and incur broker fees and higher concession fees (tenant improvement funding and abated
rent) attributed to the lease up of a new tenant. 
Also, deferring the negotiation of a new lease with Clipper for another five years, when Clipper's
current lease expires April 30, 2019, has the potential of increasing the Port's risk of having to
negotiate during a time of depressed rates as a very likely consequence of the heavy construction
activity related to the viaduct replacement and seawall projects that will continue to affect
businesses along the waterfront over the next five years.  This is not the recommended
alternative. 
Alternative 2) Port staff proposes terminating Clipper's existing leases with a remaining term of
five years and entering into two new fifteen leases that would increase the net revenue to the Port 
over the existing five year term by $57,000 more than what would have been achieved with only
the market rate adjustment for the remaining term under the existing lease. Entering into the new
leases secures a water dependent tenant for a longer term with a net present value (NPV) to the
Port of $1,820,000 over fifteen years. Additional savings to the Port over the term of the lease as
a result of passing the cost of the Vine Street Permit fee through to Clipper is $259,000.
Clipper's net investment of $500,000 to the Premises would include real property improvements
such as updating the public restrooms and sprinkler systems to meet current code requirements,
installing new ceiling and lighting fixtures, all of which would increase the value of the Port's
asset. An additional benefit to the Port, by entering into a new lease, is that using the new Port
standard term lease document, the Port reduces its risk under the insurance, indemnification and
environmental provisions. Clipper is a valued tenant whose operations at Pier 69 as a waterdependent
user support the mission of the Port and aligns with the Commission's interest in
retaining maritime related jobs. This is the recommended alternative. 
ATTACHMENTS TO THIS REQUEST 
Attachment 1: Pier 69 Draft Lease 
Attachment 2: Vine Street Submerged Land Draft Lease 
Supplement 1: Presentation

Limitations of Translatable Documents

PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.