6e supp
Item No.: 6e_Supp Date: October 8, 2013 Fishermen's Center Building (C-15) HVAC Replacement Fishermen's Center Building 2 Percent Award / Engineer's Estimate Percent Award Above or Below Engineer's Estimate, Dollars in Millions Major Construction Contracts, 2010-2013 $30 Aviation Seaport $25 Real Estate $20 Award Amount $15 [Millions] $10 $5 $0 -100.00% -80.00% -60.00% -40.00% -20.00% 0.00% 10% 20.00% 40.00% 60.00% 80.00% 3 Fishermen's Center Building 4 Fishermen's Center Building 5 Existing Mechanical Wells 6 Existing Mechanical Wells 7 Existing Roof Cross Section / Alternatives Considered 8 Alternatives Considered New mechanical spaces outside of existing building envelope Install new beams/columns below mezzanine slab and enlarge roof openings Install new beams below roof trusses and enlarge roof openings Install custom units that come in sections that fit through existing roof openings (current design) 9
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.