6e

COMMISSION 
AGENDA MEMORANDUM                Item No.       6e 
ACTION ITEM                   Date of Meeting    October 24, 2017 
DATE:    October 13, 2017 
TO:     Dave Soike, Interim Executive Director 
FROM:   Ralph Graves, Senior Director, Capital Development 
Jeffrey Brown, Director Aviation Facilities and Capital Programs 
SUBJECT:  Capital Development Department (CDD), and Central Procurement Office (CPO)
Major Works Department move to the SeaTac Office Center (CIP #C800982) 
Total Authorization Request:         $9,057,000 
Estimated Project Cost:             $2,145,000 
Estimated Lease Cost:              $6,829,000 
Estimated Expense Cost:              $83,000 

ACTION REQUESTED 
Request Commission authorization for the Executive Director to (1) execute a lease amendment
for office space for the Capital Development Department (CDD) and Central Procurement Office
(CPO) Major Works Department to move into the SeaTac Office Center (STOC) for $6,829,000
and (2) Execute contracts to purchase office furniture, and design and install communications
infrastructure to support business needs for $2,228,000 (CIP #C800982). 
EXECUTIVE SUMMARY 
This project will lease additional office space in the STOC where the International Arrivals
Facility (IAF) project team currently holds a lease. This additional office space is needed to
accommodate growth in both the Aviation Division and CDD because there is no additional
capacity in the Airport Office Building (AOB) to accommodate anticipated staff growth.
Beyond the need to accommodate growth, the additional leased space allows CDD and related
departments to reorganize staff areas by project team versus traditional departmental lines.
This reorganization of staff will facilitate greater efficiency in project delivery and
communication for the capital program that continues to expand at Sea-Tac. The action
requested includes costs for communications design and construction, office furniture, and
relocation of staff to support business needs. 


Template revised September 22, 2016.

COMMISSION AGENDA  Action Item No. _6e___                    Page 2 of 5 
Meeting Date: October 24, 2017 
JUSTIFICATION 
The AOB is at capacity with the existing furniture and footprint and cannot accommodate
projected staffing growth. In early 2017 an office space study was conducted for the Aviation
Division to determine how to accommodate 5-year projected staffing growth in the AOB. Based
on the study, the best option to meet the needs of the Aviation Division's projected growth is
to move a large group of people out of the building and into a leased space. 
Moving CDD and CPO would provide the opportunity to co-locate project teams. Project teams
will occupy space in STOC as well as the off-site offices currently being used by these work
groups including the West Side Office, Water Tower Office, and Logistics Office. Grouping
project teams allows them to work more collaboratively and efficiently.

SCOPE OF AGREEMENT 
Landlord:         STOC LLC 
Tenant:          Port of Seattle 
Term/Effective Date: A term of seventy two (72) months to commence on May 1, 2018, or
upon completion of tenant improvements and receipt of a Certificate of
Occupancy. 
Use:            General Office and Project Management Administration 
Area:            Expansion premises is 24,424 rentable square feet (RSF) of the fourth
floor of Building III at the SeaTac Office Center (17900 International Blvd.
S, Seattle, WA, 98188). The original lease for the IAF Project is 22,302 RSF 
and the total combined premises are now 46,726 RSF. 
Rental:           Rental rate scheduled is based on a triple net lease. 
Months 01 - 12 @ $16.12/RSF/yr. = $32,809.57/month 
Months 13 - 24 @ $16.62/RSF/yr. = $64,715.51/month 
Months 25 - 36 @ $17.12/RSF/yr. = $66,662.43/month 
Months 37 - 48 @ $17.62/RSF/yr. = $68,609.34/month 
Months 49 - 60 @ $18.12/RSF/yr. = $70,556.26/month 
Months 61 - 72 @ $18.62/RSF/yr. = $72,503.18/month 
Tenant Improvements: Landlord shall provide a tenant improvement allowance up to
$1,111,854. 
Operating Expenses & Real Estate Tax Costs: 

Template revised September 22, 2016; format updates October 19, 2016.

COMMISSION AGENDA  Action Item No. _6e___                    Page 3 of 5 
Meeting Date: October 24, 2017 
Landlord currently estimates operating expenses at $9.04 per RSF for a
total annual cost of $220,725. With an estimated increase of 2% per year,
the total for six years of operating expenses is $2,410,802. The total
estimated lease value includes operating expenses. 
Security Deposit:    Not required. 
Parking:          Two hundred thirty four stalls are included in the lease rate, five stalls
provided per 1,000 RSF leased. 
Scope of Work 
Capital 
(1)   Design and install communications infrastructure in the STOC 
(2)   Purchase and install furniture in STOC 
Expense 
(1)   Use Port Engineering Design staff to design minor modifications to the West Side
Office and Logistics Office, including communications infrastructure
(2)   Purchase new and use existing furniture to make modifications to the West Side
Office and the Logistics Office 
(3)   Use Port Construction Services and Maintenance to construct modifications and
reconfigure office furniture in the West Side and Logistics Offices 
(4)   Physical Relocation 
Schedule 
Commission authorization             2017 Fourth Quarter 
Design start                        2017 Fourth Quarter 
Construction start                    2018 First Quarter 
In-use date                        2018 Second Quarter 
Cost Breakdown                         This Request       Total Project 
Lease Amendment                      $6,829,000        $6,829,000 
Capital 
Design                         $272,000        $272,000 
Furniture and Communications           $1,873,000        $1,873,000 
Infrastructure 
Capital Total                                $2,145,000         $2,145,000 
Expense 
Design                          $17,000         $17,000 
Furniture ,Communications and
modifications to West Side Office
and Logistics Offices                         $39,000            $39,000 

Template revised September 22, 2016; format updates October 19, 2016.

COMMISSION AGENDA  Action Item No. _6e___                    Page 4 of 5 
Meeting Date: October 24, 2017 
Relocation fees                        $27,000          $27,000 
Expense Total                               $83,000           $83,000 
Total                                      $9,057,000         $9,057,000 
ALTERNATIVES AND IMPLICATIONS CONSIDERED 
Alternative 1  Densify AOB 
Cost Implications: $12,021,000 
Pros: 
(1)   All current departments within the AOB stay in the AOB 
(2)   Provides room for 2-3 years of growth 
Cons: 
(1)   Each floor would need to be vacated for 1-2 months during construction 
(2)   Facilities & Infrastructure Library is eliminated and the contents are redistributed into
open areas and consolidated 
(3)   New cubicle and conference room furniture will be required 
(4)   All costs would occur in one year 
(5)   Based on information received from the Aviation staffing study conducted subsequent
to the AOB office space study, this option is not viable to accommodate 5-year
growth. 
This is not the recommended alternative. 
Alternative 2  Relocate Capital Development Departments located at the AOB and the Central
Procurement Office  Major Works Department located at the Logistics Office to the STOC and
other airport area locations outside the AOB 
Cost Implications: $2,228,000 Capital and Expense, $6,829,000 Lease 
Pros: 
(1)   Provides the opportunity to collocate project teams at STOC, Water Tower, Westside
and Logistics office locations 
(2)   CPO  Major Construction Department will be collocated with their major customer, 
CDD 
(3)   Can be implemented in 2018 and should meet the need for space in the AOB 
(4)   Provides more reasonable phasing for relocations within the AOB 
(5)   Costs spread over 6 years 
Cons: 
(1)   Added travel time to and from Airport and between office locations 
(2)   CDD staff will be spread throughout more locations than at present 
This is the recommended alternative. 

Template revised September 22, 2016; format updates October 19, 2016.

COMMISSION AGENDA  Action Item No. _6e___                    Page 5 of 5 
Meeting Date: October 24, 2017 

FINANCIAL IMPLICATIONS (non-lease) 
Cost Estimate/Authorization          Capital     Expense       Total 
Summary 
COST ESTIMATE 
Original estimate                $2,145,000      $83,000    $2,228,000 
AUTHORIZATION 
Previous authorizations                 $0          $0          $0 
Current request for authorization     $2,145,000      $83000    $2,228,000 
Total authorizations, including this    $2,145,000      $83,000    $2,228,000 
request 
Remaining amount to be              $0         $0        $0 
authorized
Annual Budget Status and Source of Funds for Capital 
The capital amount of $2,228,000 for this project, CIP #C800982, was not included in the 2017-
2021 capital budget and plan of finance. This amount will be transferred from the Aeronautical
Allowance CIP (#C800753) resulting in no net change to the Aviation capital budget. The
expense portion of this project - lease costs and relocation fees, will be included in the
operating budget for 2018 and beyond. The annual costs of rent and operating expense will be
allocated to capital projects through projects overhead allocations. The funding source for the
capital costs will be the Airport Development Fund. 
Financial Analysis and Summary for Capital 
Project cost for analysis         $2,228,000 
Business Unit (BU)            Division-wide 
Effect on business performance   NOI after depreciation will decrease 
(NOI after depreciation) 
IRR/NPV (if relevant)           N/A 
CPE Impact                $0.03 in 2018 

ATTACHMENTS TO THIS REQUEST 
(1)   Draft lease amendment 
PREVIOUS COMMISSION ACTIONS OR BRIEFINGS 
None 


Template revised September 22, 2016; format updates October 19, 2016.

Limitations of Translatable Documents

PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.