COMMISSION AGENDA MEMORANDUM Item No. 6d_Attach_B ACTION ITEM Date of Meeting November 14, 2017 DATE: November 7, 2017 Attachment B SUBJECT: Shilshole Bay Marina Paving (CIP #C800355) EXECUTIVE SUMMARY The work consists of pavement replacement and/or overlay to address failed or failing areas along the entire length of the parking lot that were not replaced or rehabilitated during the 2005-2008 capital redevelopment of the Marina site. The current condition of the pavement throughout much of the site is poor, including some localized failed areas which will be entirely replaced. The majority of the site will be ground and overlaid with a 2.5 inch overlay of asphalt pavement, then restriped. A significant portion of the replaced asphalt section will be pervious pavement, allowing surface water to drain directly into the ground rather than through traditional stormwater conveyance methods and eventually to the Puget Sound. Staff is also proposing the introduction of similar pervious strips of pavement throughout the site to test the efficacy of this type of system in intercepting stormwater before it enters the catch basin system. These will be 4 foot wide strips between the head to head parking areas along the site. Cost estimates have increased since initial scoping due to progressing deterioration leading to larger areas of reconstruction than anticipated and increased construction pricing in the market. JUSTIFICATION In November 2013, the Port commissioned an evaluation of the current pavement condition at Shilshole Bay Marina by Pavement Consultants Inc. The study was undertaken to assess the condition of the parking lot pavements at Shilshole Bay Marina and to identify strategies for improving condition and extending pavement life. The condition assessment included three field investigation tasks: a visual inspection of the pavement surface, non-destructive deflection testing and geotechnical investigation. This study found that in general most of the pavement is structurally sound even though the asphalt exhibits significant cracking and surface irregularities. Based on the evaluation results, several feasible repair alternatives were investigated. They would extend the life of the pavement between 5 and 40 years. The recommended alternative, Template revised September 22, 2016. COMMISSION AGENDA Action Item No. 6d_Attach_B Page 2 of 5 Meeting Date: November 14, 2017 which provides a 20 year design life, encompassed dig-out and replacement of pavement near some catch basins and a 2.5 inch asphalt overlay in other affected areas. This work will significantly extend the life of the paving at Shilshole Bay Marina, while also improving its environmental performance by incorporating pervious pavement sections in nontraffic bearing areas. DETAILS The replacement and overlay improvements proposed will extend the life of the parking lot pavement for 20 years, or more Scope of Work The scope of work consists of full depth replacement of failed areas of asphalt pavement, edge grinding and a 2.5 inch overlay of other areas and full restriping of the parking areas. No significant changes to the traffic flow, islands or channelization are planned as part of this work. The parking areas will retain the current angled parking configuration, which is the tenants' strong preference as expressed at public meetings and open houses. The work will also include areas of pervious pavement, both in fully reconstructed areas, and along the parking strips where the vehicles meet bumper to bumper. This pavement, along with a new stormwater filtration system at the north end of the parking area, not only satisfies stormwater requirements but provides additional storm water treatment of parking lot runoff. Small Business The project team will coordinate with the small business group to maximize opportunities for small business participation either as direct contracts or through subcontract opportunities. Schedule Paving work is seasonal and generally should be completed before mid-October. Phasing language is being incorporated in the contract documents to limit the disruption to parking and ongoing marina operations during construction, allowing for no more than 200 parking stalls to be affected at any given time. Staff will work with the contractor to give as much advance warning of any closures to tenants as possible. Activity Design start January 2016 Commission construction authorization November 2018 Construction start June 2018 In-use date December 2018 Template revised September 22, 2016; format updates October 19, 2016. COMMISSION AGENDA Action Item No. 6d_Attach_B Page 3 of 5 Meeting Date: November 14, 2017 Cost Breakdown This Request Total Project Design $0 $ 250,000 Construction $1,750,000 $1,750,000 Total $1,750,000 $2,000,000 ALTERNATIVES AND IMPLICATIONS CONSIDERED: Alternative 1 - Continue to use the pavement in its current deteriorated condition. Cost Implications: Some areas of the parking lot would still need immediate attention (~$200K), but the remainder could continue to be serviceable in the short term. Subsequent rehabilitation costs would be as shown in alternatives below, but adjusted upwards for market changes. Pros: (1) Lowest initial cost. No capital funding required and leaves capital funds available for other projects. Cons: (1) Some areas currently failing would continue to ravel, increasing the work to be performed later. (2) Pervious pavement improvements are currently tied to the restroom development and would need to be incorporated or mitigated elsewhere. This is not the recommended alternative. Alternative 2 - Minimal upgrades, seal coat and thin the overlay areas to 2", remove pervious paving except where required Cost Implications: $1,700,000 Pros: (1) Will extend the life of the paving by ~10-15 years. Cons: (1) Still requires full cost of striping all affected areas. (2) Lower life expectancy compared to thicker overlay option. (3) Pervious pavement areas would still need to be incorporated to address stormwater requirements of new paving. This is not the recommended alternative Alternative 3: - Overlay and rehabilitation of all areas outside of the previously improved areas Cost Implications: $2,000,000 Template revised September 22, 2016; format updates October 19, 2016. COMMISSION AGENDA Action Item No. 6d_Attach_B Page 4 of 5 Meeting Date: November 14, 2017 Pros: (1) Longest life alternative; will provide additional 20-25 year life on existing paving areas. (2) All stormwater requirements met plus additional storm water treatment of parking lot runoff Cons: (1) Higher initial cost. This is the recommended alternative FINANCIAL IMPLICATIONS Cost Estimate/Authorization Summary Capital Expense Total COST ESTIMATE Original estimate $1,914,000 $0 $1,914,000 Current change $ 86,000 0 $ 86,000 Revised estimate $2,000,000 0 $2,000,000 AUTHORIZATION Previous authorizations $ 250,000 0 $ 250,000 Current request for authorization $1,750,000 0 $1,750,000 Total authorizations, including this request $2,000,000 0 $2,000,000 Remaining amount to be authorized $0 $0 $0 Annual Budget Status and Source of Funds This project was included in the 2017 Plan of Finance under CIP #C800355 SBM Paving with a total cost of $1,196,000. The additional $804,000 required to fund this project is available under CIP #C800002 MD: Contingency Renewal & Replace. The increase in estimate is due to refinement of scope and increasing prices in the Seattle construction market. This project will be funded by the General Fund. Financial Analysis and Summary Project cost for analysis $2,000,000 Business Unit (BU) Recreational Boating Effect on business performance This project will support/maintain current moorage (NOI after depreciation) revenue at SBM. Incremental depreciation expense from this project is estimated at $100,000 per year, based on a 20-year asset life. NOI after Depreciation will decrease by the associated depreciation from this project. Template revised September 22, 2016; format updates October 19, 2016. COMMISSION AGENDA Action Item No. 6d_Attach_B Page 5 of 5 Meeting Date: November 14, 2017 IRR/NPV (if relevant) The NPV is present value of the project cost CPE Impact N/A Future Revenues and Expenses (Total cost of ownership) No future revenues are anticipated as a result of this paving project. PREVIOUS COMMISSION ACTIONS OR BRIEFINGS None Template revised September 22, 2016; format updates October 19, 2016.
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.