4d draft reimbursement agreement

TENANT REIMBURSEMENT AGREEMENT 
SEATTLE  TACOMA INTERNATIONAL AIRPORT 

PROJECT NAME: TEMPORARY CENTRAL TERMINAL FOOD CARTS AND
SHARED COOKING FACIILTY 

THIS TENANT REIMBURSEMENT AGREEMENT ("Agreement") is entered into this
___ day of ____________ 2017 between the PORT OF SEATTLE, a Washington municipal
corporation ("Port") and Ivar's, Inc., a [TENANT ENTITY] ("Tenant"). 
Whereas, the Port and Tenant will entered into a Temporary Food Cart Lease and
Concessions Agreement ("Lease") for space at Seattle-Tacoma International Airport (Airport);
and 
Whereas, Tenant is currently undertaking a tenant improvement project at the premises it
leases under the Lease (Premises); and 
Whereas, RCW 14.08.120 provides that the Port may reimburse Airport tenants for tenant
improvements to their leased premises, so long as the reimbursement is paid solely out of funds
fully collected from Airport tenants; and 
Whereas, Port Commission Resolution No. 3605 delegates to the Port's Chief Executive
Officer ("CEO") the authority to develop procedures for reimbursing tenant improvement costs,
and pay such reimbursements; and 
Whereas, Resolution No. 3605 further authorizes the CEO to pay for such tenant
improvements  in an amount allowed by Resolution 3605 or otherwise approved by the Port
Commission   consistent with policies and procedures developed by the CEO for such
reimbursement; and 
Whereas, Tenant desires to be reimbursed for those eligible portions of its tenant
improvement project according to a detailed cost estimate (an "engineer's estimate") for the
tenant improvement project without regard to Tenant's actual hard construction costs; 
NOW THEREFORE, the parties agree as follows: 
1.     DEFINITIONS 
The following terms shall have the meanings specified in this Section, unless otherwise
specifically provided. Other terms may be defined in other parts of the Agreement. 


1



1.1.   Contractor. "Contractor" shall mean any individual, partnership,  firm,
corporation, joint venture, or other business entities employed by Tenant in connection with the
Project. The term Contractor means and includes the Contractor and all of its representatives. 
1.2.   Eligible Tenant Improvement. "Eligible Tenant Improvement" shall mean those
Tenant Improvements that the Port determines are eligible for reimbursement, as further
described in Section 2 of this Agreement. 
1.3.   Guidelines. "Guidelines" shall mean the Port of Seattle's Tenant Improvement
Procedures and Guidelines, as may be amended by the Port. 
1.4.   Improvement Reimbursement Letter. "Improvement Reimbursement Letter" shall
mean a letter issued by the Port identifying the Eligible Tenant Improvements and the Tenant
Reimbursement Amount. The Improvement Reimbursement Letter is attached hereto as Exhibit
A and incorporated herein by this reference. 
1.5.   Legal Requirements. "Legal Requirements" shall mean and refer to all laws,
statutes and ordinances including building codes and zoning regulations and ordinances and the
orders, rules, regulations and requirements of all federal, state, county, city or other local
jurisdiction departments (including the Port), agencies, bureaus, offices and other subdivisions
thereof, or any official thereof, or of any other governmental, public or quasi-public authority,
which may be applicable to or have jurisdiction over the Premises, specifically including the
rules and regulations promulgated by the Port for general application at the Airport and the
Guidelines. 
1.6.   Port Project Manager. "Port Project Manager" shall mean [PORT PROJECT
MANAGER], or such other Project Manager as the Port may designate from time-to-time. 
1.7.   Port Representative. "Port Representative" shall mean the Scott Van Horn or
his/her designee. 
1.8.   Port Standards. "Port Standards" shall mean the Sea-Tac Rules and Regulations,
the Rules for Airport Construction, the Tenant Design and Construction Process Manual, Seattle-
Tacoma International Airport Construction General Requirements, the Safety Manual, the CAD
Standards Manual, the Port's mechanical, electrical, water and waste, and industrial waste and
storm drainage standards and any other, similar document establishing requirements and/or
standards for design and construction at the Airport. These materials are all generally available at
http://www.portseattle.org/Business/Construction-Projects/Airport-Tenants/Pages/Reference-
Documents.aspx. 
1.9.   Project. "Project" shall mean the project described in Section 2 of this Agreement. 
1.10.  Project Documents. "Project Documents" shall mean a written scope of work
description, the drawings, which graphically represent the Project (or parts thereof) and indicate
2

the size, form, location, and arrangement of its various elements, and specifications, which set
forth the written requirements for administration, materials, equipment, systems, standards, and
workmanship, for the Project. The index/table of contents for the Project Documents is attached
as Exhibit B. 
1.11.  Substantial Completion. "Substantial Completion" shall mean the date certified
jointly by the Tenant and the Port on which the Project (or specified portion thereof) is
substantially complete for final Contractor payment and close out in accordance with Tenant's
contract with the Contractor and applicable Legal Requirements. 
1.12.  Tenant Improvement. "Tenant Improvement" shall mean  those permanent
physical tenant improvements that Tenant, subject to the Port's prior written consent, makes to
its current Premises in connection with the Project. Tenant Improvements do not include
furniture, fixtures or equipment, except to the extent such furniture, fixtures or equipment
have/will become so permanently affixed to and incorporated into the Premises that they have
become part of the building of which the Premises are a part. 
1.13.  Tenant Reimbursement Amount. "Tenant Reimbursement Amount" shall mean
the amount the Port determines (in accordance with the terms hereof) it will reimburse to Tenant
for the Project as provided in Section 2.2 and Article 4 of this Agreement. The Tenant
Reimbursement Amount is identified on Exhibit A. 
2.     PROJECT 
2.1.   Description. The tenant improvement project is the Temporary Food Carts and
Shared Cooking Facility (the "Project") for the design, construction, and installation of cooking
equipment for a shared cooking facility and temporary food carts in the Central Terminal. 
2.2.   Project Eligibility. The Port Representative has reviewed the Project Documents
that were submitted by Tenant and has issued the Improvement Reimbursement Letter attached
as Exhibit A. The Tenant Improvement Reimbursement Letter identifies the Eligible Tenant
Improvements and establishes  the initial Tenant Reimbursement Amount. The Tenant
Reimbursement Amount is detailed on the attachment to Exhibit. 
2.3.   Approved Project. The Port's approval of the Project, identification of the Eligible
Tenant  Improvements and establishment of the Tenant Reimbursement Amount are all
predicated on its review of the Project Documents. These Project Documents are specifically
incorporated into this Agreement by this reference. Tenant acknowledges that any changes to the
Project from that reflected in the Project Documents may affect the Port's approval, the
determination of the Eligible Tenant Improvements and/or the Tenant Reimbursement Amount. 
Therefore, Tenant shall keep the Port reasonably informed about the progress of the Project and
any changes (specifically including clarifications and additional design details developed during
construction) thereto as more specifically set forth in Section 3. 
3

2.4.   Prevailing Wages. In order for the Tenant to be eligible for and obtain the Tenant
Reimbursement Amount, Tenant  shall, in connection with the labor associated with the
construction of the Eligible Tenant Improvements, comply with all prevailing wage laws in the
State of Washington applicable to the Port, as set forth in RCW 39.12 and the regulations
thereunder.  The Port will provide such assistance as Tenant  may reasonably request in
complying with this requirement. 
2.5.   Project Management. Tenant shall utilize an experienced project manager to
manage the Project. It is the Port's expectation that the Tenant's project manager will proactively
manage the Project to meet all budget and schedule objectives. 
3.     CONSTRUCTION OF PROJECT 
3.1.   General. Tenant shall construct the Project in a good and workmanlike manner
and in complete conformance with the Port Standards and all Legal Requirements. Without
limiting the generality of the foregoing, those Port Standards may require Tenant to submit to the
Port construction schedules and submittals, safety plans, O&M manuals, commissioning plans
and punch lists. 
3.2.   Port Approvals. During the course of the Project, Tenant may be required by the
Port Standards and/or Legal Requirements to submit certain information to the Port for its review
and approval. Tenant shall incorporate any comment or condition of the Port's approval prior to
proceeding with the portion of the Project for which the Port provided such comment or
condition. Tenant shall not proceed with any portion of the Project for which the Port has
notified Tenant of its disapproval. In the event that Tenant fails to incorporate any such comment
or condition or proceeds with any work disapproved by the Port, the Port shall specifically have
the right to require the removal of the particular portion of the Project (and any other portion
dependent thereon) to the extent that the portion violates a Legal Requirement, the Port
Standards or, in the Port's reasonable opinion, negatively affects the buildingor structure of
which the Project is a part; otherwise, the Port shall have the right to remove the particular
portion from the Eligible Tenant Improvements and Tenant Reimbursement Amount. In that
event, Tenant may proceed and assume responsibility for all costs associated with the affected
portion of the Project. 
3.3.   Non-Conforming Construction. The Port has the right to inspect the Project as it
progresses through completion and specifically reserves the right to issue notice to Tenant (an 
"NCR") ofany non-conforming construction. Tenant shall resolve any issues identified in an
NCR to the Port's reasonable satisfaction. In the event that Tenant fails to resolve such items to
the Port's reasonable satisfaction, the Port shall specifically have the right to require the removal
of the particular portion of the Project (and any other portion dependent thereon) that is noted in
the NCR to the extent that the portion violates a Legal Requirement, the Port Standards or, in the
Port's reasonable opinion, negatively affects the building or structure of which the Project is a

4


part; otherwise, the Port shall have the right to remove the particular portion from the Eligible
Tenant Improvements and Tenant Reimbursement Amount. 
3.4.   Warranties. All contracts that are subject to reimbursement under this Agreement 
shall contain a provision: (i) that the Port of Seattle is a third-party beneficiary of the agreement,
and (ii) that all representations, warranties and guaranties are fully assignable to, and may
specifically be enforced by, the Port of Seattle. 
3.5.   Commissioning, O&M Manuals, Training, and Close Out. 
3.5.1.  Commissioning:  Tenant shall be responsible for commissioning the
Project, specifically including the Eligible Tenant Improvements. Tenant shall be responsible for
hiring any necessary commissioning agent(s). Commissioning activities shall be performed in a
manner consistent with the Port's processes, which are specifically set forth inSection 01810 in
Appendix 1 of this Agreement. 
3.5.2.  O&M Documentation and Training: Tenant shall be responsible to provide
detailed operating and maintenance documentation and training for the Project, specifically
including the Eligible Tenant Improvements. All such documentation shall be consistent with
Section 01780 in Appendix 1 of this Agreement. All training shall be consistent with Section
01820 in Appendix 1 of this Agreement. 
3.5.3.  Project Close Out:  Tenant shall close out the project in a manner
consistent with Section 01770 in Appendix 1 of the Agreement. The Port will not release final
payment of the Tenant Reimbursement Amount until final operations and maintenance (O&M)
manuals are received for all Eligible Tenant Improvements and the Port has received any
necessary training as required. 
3.5.4.  As-built Documents: Tenant shall provide as-built documentation related
to the Project in a manner consistent with the Port's processes, which are specifically set forth in
Section 01730 of the Seattle-Tacoma International Airport Construction General Requirements,
which is part of the Port Standards. The Port will not release final payment of the Tenant
Reimbursement Amount until final as-built drawings are received for the Project. 
4.     REVISED AND FINAL TENANT REIMBURSEMENT AMOUNT 
4.1.   Fixed Tenant Reimbursement Amount. The Tenant Reimbursement Amount has
been established based upon a detailed construction cost estimate prepared by the Port (in the
terminology of the Guidelines, an "Engineer's Estimate"). The Tenant Reimbursement Amount
specifically includes established amounts to address construction contingencies. Soft costs  like
design, project management, construction management and permitting  are calculated as a
percentage of the total, estimated construction cost. Except as specifically set forth in Section
4.2, the Tenant Reimbursement Amount is fixed at the amount set forth on Exhibit A and will

5

not vary based upon Tenant's actual cost of construction. Both parties acknowledge that Tenant's
actual costs may be different than those identified in the cost estimate but that the cost estimate is
a reasonable forecast of the amount Tenant is likely to spend on the Eligible Tenant
Improvements. 
4.2.   Changes in Tenant Reimbursement Amount. As noted in Section 4.1, the Tenant
Reimbursement Amount will not vary based on Tenant's actual cost of construction of the
Project or the Eligible Tenant Improvements. Notwithstanding the foregoing, in the event that
Tenant encounters any conditions during the course of construction of the Project that are
materially different than (i) those represented to Tenant by the Port or (ii) those ordinarily
encountered and generally recognized as inherent in the work of the character provided for in the
Project, Tenant shall immediately notify the Port both orally and in writing so that the Port may
make an examination of the alleged condition and determine whether any adjustment to the
Tenant Reimbursement Amount may be appropriate. In the event that the Port, in its sole
discretion, determines that an adjustment to the Tenant Reimbursement Amount is appropriate, it
will issue a revised Improvement Reimbursement Letter and Tenant Reimbursement Amount
based on a revised construction cost estimate that takes account of the unforeseen condition(s).
Neither the Port Representative nor the Port Project Manager has any authority to authorize
reimbursement for any Eligible Tenant Improvement in excess of the Tenant Reimbursement
Amount. Considerations beyond the actual conditions encountered by Tenant will affect the
Port's determination, which factors include (without limitation) the availability of tenant
reimbursement funds and the necessity for Port Commission approval of such additional funds. 
5.     REIMBURSEMENT PROCESS 
5.1.   Procedure for Reimbursement. Upon completion of Project construction, Tenant
shall submit to the Port Representative reasonable documentation establishing that Tenant has
incurred all costs for which reimbursement is sought. At a minimum, Tenant shall provide the
Port the documents set forth on Exhibit C. If not previously provided, the invoice shall be
accompanied by approved Affidavit(s) of Wages Paid for any Contractor(s) performing work on
the Project. The Port Representative and Port Project Manager shall review the documentation 
and reasonably verify that the particular work for which reimbursement is sought has been
performed and is in compliance with all of the requirements of the Guidelines. Following the
Port Representative's acceptance of the Project and all close out requirements, the Port shall pay
Tenant the Tenant Reimbursement Amount within forty-five (45) days. 
5.2.   Partial Payments. As an accommodation to Tenant, the Port may  but shall not be
required   to make partial payments of the Tenant Reimbursement Amount prior to the
completion of the Project. The Port will generally make partial payments only where the Tenant
Reimbursement Amount exceeds two hundred thousand dollars ($200,000) and/or the Project
schedule exceeds four (4) months. In the event that the Port authorizes partial payment, Tenant
shall submit to the Port invoices that reflect, on a percentage of completion basis, the work
6

performed on the Eligible Tenant Improvements and the amounts paid for such work. Such
invoices may be submitted not more frequently than monthly. The invoices shall be accompanied
by approved Statement(s) of Intent to Pay Prevailing Wage for any Contractor(s) for which 
payment is requested. The Port Representative and Port Project Manager will review the invoice
and reasonably verify that the particular work for which reimbursement is sought has been
performed and is in compliance with all of the requirements of this Agreement. The Port
Representative and Port Project Manager shall make a good faith effort to perform their review
and verification promptly to ensure timely reimbursement of the Tenant. The Port will reimburse
Tenant within forty-five (45) days of approval by the Port Representative and the Port Project
Manager; provided, however, in no event will the Port reimburse more than ninety percent (90%)
of the Tenant Reimbursement Amount attached to this Agreement until the requirements of
Section 5.1 have been satisfied. 
5.3.   Port Review. Nothing that the Port may do, or fail to do, as part of its review of
any request for reimbursement sought by Tenant shall relieve Tenant of the full responsibility to
comply with this Agreement, any other agreement between the parties or any Legal
Requirements or Port Standards related to the Project. Tenant shall render such assistance in
review and verification as the Port Representative or Port Project Manager may reasonably
request. 
5.4.   Tenant Project Records. With respect to any Eligible Tenant Improvement for
which reimbursement is requested by Tenant, Tenant shall keep true and accurate records which
shall clearly show all invoices, reimbursement requests, reimbursement payments and relevant
supporting documentation. Tenant further agrees to keep or make available electronically or in
the Seattle area such records as the Port may reasonably request, relating to the Eligible Tenant
Improvements. Such Project records of Tenant shall be open for inspection by authorized
representatives of the Port and available at all reasonable appointment times during business
hours. Tenant shall retain all of its records related to any Project costs or expense for which
reimbursement is sought until the date set forth in Section 5.5 for the commencement by the Port
of an audit or such later time as any audit commenced by the Port within such time is completed. 
5.5.   Audit. The Port shall have the right for up to two (2) years following the date of
final reimbursement to Tenant under this Agreement, to authorize one or more audits of Tenant's
Project records pertaining to any request for reimbursement under this Agreement. Such audits
shall be undertaken by the Port's auditor or a reputable firm of certified public accountants
satisfactory to the Port. The cost of such audits shall be borne by the Port, unless the results of
such audits reveal an overpayment by the Port of more than five percent (5%) of the total
amounts determined by audit to be due under this Agreement for the period of audit. In case of
such overpayment, the cost of the audit shall be borne by Tenant. In any event, Tenant shall
immediately repay all amounts overpaid together with interest at a rate equal to the prime rate
published by Bank of America plus three percent (3%) per annum from the date of overpayment
until repaid by Tenant. If circumstances arise whereby Tenant causes the auditor to incur excess 
7

costs, due to lack of timely preparation for the audit or lack of appropriate attention during the
course of the audit, the excess costs will be passed on to Tenant. Tenant at its own expense shall
supply all record forms in a type, style and form reasonably satisfactory to the Port. 
6.     TITLE TO IMPROVEMENTS 
Consistent with Section OWNERSHIP OF TENANT IMPROVEMENTS SECTION OF LEASE 
of the Lease, the Port shall own all Tenant Improvements for which reimbursement is made
pursuant to this Agreement, and Tenant shall have no interest therein. 
7.     MISCELLANEOUS 
7.1.   No Other Agreement.  This Agreement  sets  forth all covenants, promises,
agreements, conditions or understandings between the parties concerning the reimbursement of
Tenant Improvements for the Project. There are no covenants, promises, agreements, conditions
or understandings, either oral or written, between the parties other than as are set forth in this
Agreement. 
7.2.   Modification. No subsequent alteration, amendment, change or addition to this
Agreement shall be binding unless reduced to writing and signed by both parties hereto. 
7.3.   Governing Law. This Agreement shall be construed and enforced in accordance
with the laws of the State of Washington without regard to choice of law principles. In the event
that any term, covenant, condition or other provision of this Agreement is held to be invalid, void
or unenforceable, the remainder of the terms, covenants, conditions or provisions of this
Agreement shall remain in full force and effect. 
7.4.   Fair Construction. The parties acknowledge and agree that the language of this
Agreement shall be construed as a whole according to its fair meaning and not strictly for or
against any of the parties. The captions and section numbers appearing in this Agreement are
inserted only as a matter of convenience and in no way define, limit, construe or describe the
scope or intent of such sections nor in any way affect this Agreement. 
7.5.   Attorneys' Fees. Inthe event any party requires the services of an attorney in
connection with enforcing the terms of this Agreement or in the event that suit is brought for the
breach of any representation, covenant or condition of this Agreement, the prevailing party shall
be entitled to a reasonable sum for attorneys' fees, consultants' or experts' fees, witness fees and
other costs and expenses, including any arbitration fees and fees of any arbitrator. 
7.6.   Successors and Assigns. This Agreement and each of its covenants and conditions
shall be binding upon, and shall inure to the benefit of, the parties hereto and the respective
successors and assigns. 

8

7.7.   Relationship of the Parties. Nothing contained in this Agreement shall be deemed
or construed as creating the relationship of principal and agent, partnership, or joint venture
partners, and no provision contained in this Agreement, nor shall any acts of the Port and Tenant
be deemed to create any relationship other than that of landlord and tenant. 
7.8.   Exhibits. The Exhibits outlined below are attached to this Agreement after the
signatures and by this reference are incorporated herein: 
Exhibit A:    Improvement  Reimbursement  Letter,  including  Eligible  Tenant
Improvements. 
Exhibit B:    Index to approved Project Documents 
Exhibit C:    Required Reimbursement Records 
Appendix 1   Section 01200  Measurement & Payment 
Section 01770  Project Closeout 
Section 01780  Operations & Maintenance Documentation 
Section 01810  Commissioning 
Section 01820  Training 
Executed for and on behalf of; 
PORT OF SEATTLE 
By:                             By: 
Its:                                         Its: 
Dated:                            Dated: 







9

EXHIBIT A 
Improvement Reimbursement Letter 
[DATE] 
[TENANT CONTACT] 
[TENANT NAME] 
[TENANT ADDRESS] 
[TENANT CITY, STATE, ZIP] 
Re:   Exhibit A  Improvement Reimbursement Letter for 
[PROJECT NAME] 
Dear [TENANT CONTACT]: 
This letter confirms that the Port has reviewed the Project Documents submitted by [TENANT
NAME] for certain tenant improvements to made for space leased under the [LEASE
AGREEMENT] dated [LEASE DATE]. Consistent with the terms of the Tenant Reimbursement
Agreement (TRA) to which this letter will be attached, the Port has determined that the following
tenant improvements are Eligible Tenant Improvements: 
[INSERT LIST OF ELIGIBLE IMPROVEMENTS] 
Consistent with a Schedule of Values attached hereto as Attachment A, the Port has determined
that the Tenant Reimbursement Amount is [REIMBURSEMENT AMOUNT]. This Tenant
Reimbursement Amount has been determined based exclusively on the Project Documents and
attached Schedule of Values. Except as provided in Section 4.2 of the Tenant Reimbursement
Agreement, this amount is not subject to adjustment. Without limiting the generality of the
foregoing, it is not subject to adjustment based on your actual construction costs; the Tenant
Reimbursement Amount is an amount that the parties both agree is reasonable for the Eligible
Tenant Improvements. 
If you have any questions concerning any of these matters, please contact [PORT CONTACT] at
(206) 787-[XXXX]. 
Sincerely, 

Lance Lyttle 
Managing Director, Aviation 
Encl. 

A-1

ATTACHMENT A 
Schedule of Values  
AV/PMG Estimate of Project Cost
Seattle-Tacoma International Airport
C800638     WPU00090   Concourse B - ADR Kiosk - Alternative 3
CIP Program: Terminal and Tenant                Dated: Thursday, November 09, 2017                          Estimate Type: ROM
Estimated Direct Costs                 QTY   UM      UP        CAPITAL     EXPENSE      ERL       TOTAL
Shared Kitchen                         900      SF   $ 351.11      $ 316,000       $ -   $ -   $ 316,000 
Food Court Kiosk Exhaust                    3   EA   $ 53,333.33        $ 160,000       $ -   $ -   $ 160,000 
$ - $ - $ - $ - 
$ - $ - $ - $ - 
$ - $ - $ - $ - 
Subtotal Major Construction Direct Costs                $ 528.89      $ 476,000       $ -   $ -   $ 476,000 
Design Development Allowance                               30.0% $ 143,000       $ -  $ -  $ 143,000 
Construction Phasing                                        5.0% $ 31,000      $ -   $ -   $ 31,000 
Escalation @ 5% to beginning of construction                           5.8% $ 37,000       $ -   $ -   $ 37,000 
Mid-point of Construction Escalation based on 5.0% per Annum, Start Date of 01/02/2019, End Date of 01/02/2019
Subtotal Construction Direct Costs                                     $ 687,000       $ -   $ -   $ 687,000 
GC, Home Office OH, Bond & Profit                                26.0% $ 179,000       $ -   $ -   $ 179,000 
Market Contingency                                        15.0% $ 130,000       $ -   $ -   $ 130,000 
Estimate of Probable Construction Cost (Est. Bid Amount)     $ 1,106.67       $ 996,000       $ -   $ -   $ 996,000 
Other POS Direct Costs (Includes Construction Contingency)
Utility Costs (Design, Construction, Permit Fees)                             $ -   $ -   $ -   $ - 
Contingencies
Construction Contingency                                     12.5% $ 125,000       $ -   $ -   $ 125,000 
Other POS Direct Costs (Excludes Construction Contingency)
Owner Provided Seating                                           $ -   $ -              $ - 
Owner Provided Cart                                             $ -                         $ - 
Owner Furnished Material & Equipment                                 $ -   $ -              $ - 
Subtotal                                               $ 1,121,000        $ -   $ -   $ 1,121,000 
PCS Costs
PCS ENV / HAZMAT / RMM                                      $ -   $ -  $ -  $ - 
PCS Bid Amount - Boston Barricade                                    $ 12,000      $ -   $ -   $ 12,000 
PCS Materials                                                 $ -   $ -   $ -   $ - 
PCS Equipment                                          $ -   $ -  $ -  $ - 
Subtotal PCS Construction Costs                                    $ 12,000      $ -   $ -   $ 12,000 
PCS Construction Management                                   $ 1,000     $ -  $ -  $ 1,000 
Subtotal Construction Costs w/ ODC's & Contingency                   $ 1,134,000        $ -   $ -   $ 1,134,000 
Washington State Sales Tax (WSST)                              10.0% $ 112,000       $ -   $ -   $ 112,000 
Other POS Direct Costs (Excludes Sales Tax and Const. Contingency)
Owner Furnished Equipment (Tax-Exempt)                              $ -   $ -  $ -  $ - 
Maintenance Support                                           $ 13,000      $ -  $ -  $ 13,000 
Utility Bills (During Construction Only)                                    $ -   $ -   $ -   $ - 
Subtotal Final Construction Cost                                 $ 1,259,000        $ -   $ -   $ 1,259,000 
PMG & Other Soft Costs
Design (DS)
A / E Design and Construction Support - Consultant                  15.0%     $ 170,000       $ -   $ -  $ 170,000
Design and Construction Support - In House                       0.0%     $ -   $ -   $ -  $ -
Project Management (PM)
Project Mgmt (Des & Constr)                                10.0%     $ 113,000       $ -   $ -  $ 113,000
Project Mgmt - Consultant                                   0.0%      $ -   $ -   $ -  $ -
Construction Management (CM)
Construction Management                              11.0%     $ 125,000       $ -             $ 125,000
Testing & Inspection                                      0.8%      $ 9,000      $ -              $ 9,000
Safety                                               1.0%      $ 11,000       $ -   $ -  $ 11,000
Survey                                           0.0%     $ -   $ -  $ -  $ -
Central Procurement Office (CPO)
Central Procurement Office                                  4.0%      $ 45,000       $ -   $ -  $ 45,000
Administration (AD)
Airport Directs                                          1.0%      $ 11,000       $ -   $ -  $ 11,000
Environmental & Permitting (EP)
Environmental Support & Reviews                            0.2%     $ 2,000      $ -   $ -  $ 2,000
Legal                                            0.0%     $ -   $ -  $ -  $ -
Building Dept / Permitting                                   0.9%      $ 10,000       $ -   $ -  $ 10,000
Subtotal PMG & Other Soft Costs                       43.9%    $ 496,000       $ -   $ -   $ 496,000 
Other Project Costs
Art Program                                               0.5% $ 7,000      N/A         N/A     $ 7,000
Technology Innovation                                         0.5% $ 6,000      N/A         N/A     $ 6,000
ICT Systems Components                                      $ - $ -           $ -
Project Contingency                                      5.0%     $ 88,000  $ -             $ 88,000
TOTAL ESTIMATED PROJECT COST               $ 2,062.22      $ 1,856,000       $ - $ - $ 1,856,000 

A-2

A-3

EXHIBIT B 
Index to Approved Project Records 


[INSERT A WRITTEN SCOPE OF WORK AND LIST OF THE PROJECT DOCUMENTS
REVIEWED TO DETERMINE ELIGIBILITY] 














B-1

EXHIBIT C 
Required Reimbursement Records 
The following list specifies the records necessary for Port processing and reimbursement to the
Tenant of the Final Tenant Reimbursement Amount. 
1.  Approved Statement of Intent to Pay Prevailing Wage for Contractor and each
subcontractor performing work on the Project. 
2.  Approved Affidavit of Wages Paid for Contractor and each subcontractor performing
work on the Project. 
3.  Reasonable documentation establishing that Tenant has incurred all costs for which
reimbursement is sought. 
4.  All commissioning and close-out documentation required by the Port Standards,
including (without limitation) final as-built documents and O&M manuals. 
5.  Proof of payment and release of liens for Contractor and each subcontractor performing
work on the Project. 
[INSERT ANY OTHER DOCUMENTATION THAT MUST BE SUBMITTED FOR
REIMBURSEMENT] 










C-1

Limitations of Translatable Documents

PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.