Minutes

P.O. Box 1209 
Seattle, Washington 98111 
www.portseattle.org 
206.787.3000 
APPROVED MINUTES 
COMMISSION REGULAR MEETING SEPTEMBER 26, 2017 
The Port of Seattle Commission met in a regular meeting Tuesday, September 26, 2017, in the
International  Auditorium  at  Seattle-Tacoma  International  Airport,  Seattle,  Washington.
Commissioners Albro, Creighton, and Felleman were present. Commissioner Bowman was present
until 4:45 p.m. Commissioner Gregoire was present from 1:40 p.m. to 3:48 p.m. 
1.   CALL TO ORDER 
The meeting was called to order at 12:05 p.m. by Commission President Tom Albro. 
2.   EXECUTIVE SESSION pursuant to RCW 42.30.110 
The public meeting was immediately recessed to an executive session estimated to last 60 minutes
to discuss one matter relating to sale or lease of real estate, potential litigation, and legal risk; one 
matter relating to performance on a publicly bid contract, potential litigation, and legal risk; and one
matter related to litigation  and legal risk.  Following the executive session, which lasted
approximately 65 minutes, the public meeting reconvened at 1:20 p.m. Commissioner Albro led the
flag salute. 
3.   SPECIAL ORDERS OF BUSINESS 
3a.  September 26, 2017, Executive Director Report. 
Interim  Executive Director  Dave Soike previewed several items on the day's agenda and
announced that the Federal Aviation Administration has granted approval to use passenger facility
charges for the International Arrivals Facility and North Satellite projects, which means no debt will
be used to finance those projects. 
It was also announced that Port staff is working to determine the impacts of the recently updated
travel ban executive order. The Supreme Court oral argument hearing scheduled for October 10, 
regarding the constitutionality of the executive order, has been cancelled pending submission by all
parties addressing the new proclamation. There is no effect on the Port's amicus filing at this time. 
A recording of this part of the meeting has been made available online. 
Without objection, the Commission advanced to consideration of 
5.   PUBLIC TESTIMONY 
Public comment was received from the following individual(s): 
Charlie James, Civil Rights Coalition, regarding airport concessions. 

Digital recordings of the meeting proceedings and meeting materials are available online  www.portseattle.org.



PORT COMMISSION MEETING MINUTES                    Page 2 of 9 
TUESDAY, SEPTEMBER 26, 2017 
Fred Anderson, Civil Rights Coalition, regarding airport concessions. 
Eddie Rye, Civil Rights Coalition, regarding airport concessions. Mr. Rye submitted
written materials, which are included here as minutes Exhibit A and are available for
public review. 
Nicole Grant, Executive, Martin Luther King County Labor Council, regarding labor
relations. 
Pete Knutson, Director, Puget Sound Harvest/Loki Fish Company, regarding
Fishermen's Terminal. 
J.C. Harris, Des Moines resident, regarding area P-5 tree removal. 
Rick Johnson, Des Moines resident, regarding area P-5 tree removal. 
Hayward Evans, AfroPAC, regarding airport concessions. 
James D. Langston, Des Moines Historical Society, Hillgrove Cemetery, Water District
54, regarding airport tree removal. 
Guled Attirsi, driver, Eastside for Hire, regarding taxi rates. 
Ali A. Aden, taxi driver and Seattle resident, regarding taxi rates. 
Mustafa, taxi driver and Seattle resident, regarding taxi rates. 
Suldan Mohamed, taxi driver and Seattle resident, regarding taxi rates. 
Abdul Sial, taxi owner, regarding taxi rates. 
Samatar Guled, General Manager, Eastside for Hire, regarding taxi rates. 
Muhamed Diriye, driver, Eastside for Hire, regarding taxi rates. 
Abdi Rhaman, Orange Cab, regarding taxi rates. 
Eskinder Yirgu, E-Cab, regarding taxi rates. 
Simranjeet Singh, E-Cab, regarding taxi rates. 
Dawn Gearhart, teamsters, regarding taxi rates. 
Aamar Khan, Yellow Cab, regarding taxi rates. 
Mohamed Alanle, Flatrate, regarding taxi rates. 
Berhand Alemayehu, Yellow Cab, regarding taxi rates. 
Elias Shifow, Yellow Cab, regarding taxi rates. Mr. Shifow submitted written materials,
which are included here as minutes Exhibit B and are available for public review. 
Abadir Abdala, Chairman of the Drivers, E-Cab and Flatrate, regarding taxi rates. 
Abdul Yusuf, Manager, Eastside for Hire, regarding taxi rates. 
Mohamed Mohamuud, driver, regarding taxi rates. 
Mohamed Sufi, driver, Eastside for Hire, regarding taxi rates. 
Abdirahim Kahiye Hassan, driver, Eastside for Hire, regarding taxi rates. 
Abdifataah Abatiyow, driver, regarding taxi rates. 
Hailu Gajo, owner/operator, regarding taxi rates. 
Abdu Mohammed, owner/operator, regarding taxi rates. 
Amin Shifow, General Manager, Puget Sound Dispatch, regarding taxi rates. 
Ali Sugule, driver, Eastside for Hire, regarding taxi rates. 
Cindi Laws, Wheelchair Accessible Taxis, regarding taxi rates. 
Matthew Wald, Executive Director, Drive Forward, regarding taxi rates. 
Paul Dhauri, Officer, STITA Taxi, regarding taxi rates. 
Sadhu Singh, driver, E-Cab, regarding taxi rates. 
Dawit Tesfaye, Wheelchair Accessible Taxi, regarding taxi rates. 

Minutes of September 26, 2017, submitted for review on January 24, 2018, and proposed for approval on January 30, 2018.


PORT COMMISSION MEETING MINUTES                    Page 3 of 9 
TUESDAY, SEPTEMBER 26, 2017 
Ann Ferraguto, Principal, Air Projects, Inc., regarding airport concessions. 
A recording of this part of the meeting has been made available online. 
The Commission returned to consideration of the following agenda item  
3b.  Authorization for the Executive Director to negotiate and execute an amendment to the
concession agreement for transportation services between the Port and Eastside for
Hire Inc. at Seattle-Tacoma International Airport. [subsequently amended] 
Request document(s) included a Commission agenda memorandum. 
Presenter(s): Lance Lyttle, Managing Director, Aviation; Glenn Fernandes, Internal Audit Director;
and Jeff Hoevet, Senior Manager Airport Operations, Landside. 
The amendment proposes to lower the per-trip fee to six dollars, and to allow Prius V vehicles that
are currently part of the fleet to continue operations at the airport. Automatic vehicle identification 
tag data will be used to track the actual number of trips made per week, allowing drivers to easily
determine whether the advance on the fee they have paid to Eastside for Hire is accurate. The Port
is also proposing continued meetings between Eastside for Hire and Teamsters to try to reach a
labor peace agreement. 
Mr. Soike indicated that Port staff will negotiate with transportation network companies to amend
their contracts, raising the daily rate to six dollars, effective October 1 or as soon as existing
contract provisions will allow. 
The action request was amended to read as follows: 
Authorization for the Executive Director to negotiate and execute an amendment to the
concession agreement for transportation services between the Port and Eastside for
Hire Inc. at Seattle-Tacoma International Airport, subject to state law. [as amended] 
The motion for approval of agenda item 3b, as amended, carried by the following vote: 
In favor: Albro, Bowman, Creighton, Felleman, Gregoire (5) 
A recording of this part of the meeting has been made available online. 
4.   UNANIMOUS CONSENT CALENDAR 
[Clerk's Note: Items on the Unanimous Consent Calendar are considered routine and are not
individually discussed. Port Commissioners receive the request documents prior to the meeting
and may remove items from the Consent Calendar for separate discussion and vote in accordance
with Commission bylaws.] 
At the request of Commissioner Felleman, agenda item 4e was removed from the Unanimous
Consent Calendar for separate discussion and vote. 

Minutes of September 26, 2017, submitted for review on January 24, 2018, and proposed for approval on January 30, 2018.








PORT COMMISSION MEETING MINUTES                    Page 4 of 9 
TUESDAY, SEPTEMBER 26, 2017 
4a.  Approval of the Claims and Obligations for the period August 1-31, 2017, including
accounts payable check nos. 918920-919481 in the amount of $6,575,700.58; accounts
payable ACH nos. 001611-002335 in the amount of $51,158,350.05, accounts payable
wire transfer nos. 014717-014734 in the amount of $6,860,505.23; payroll check nos.
186959-187339 in the amount of $522,556.17; and payroll ACH nos. 818280-822296 in
the amount of $9,483,106.95 for a fund total of $74,600,218.98. 
Request document(s) included a Commission agenda memorandum. 
4b.  Authorization for the Executive Director to (1) prepare design and construction bid
documents for the Arc Flash Mitigation project at Seattle-Tacoma International Airport;
(2) advertise and award a major works construction contract; and (3) utilize Port of
Seattle crews and small works contracts to perform construction work. The amount of
this request is $7,383,000 for a total estimated project cost of $7,533,000 (CIP
#C800826). 
Request document(s) included a Commission agenda memorandum. 
4c.  Authorization for the Executive Director to (1) prepare design and construction bid
documents for the Telecommunications Meet Me Room project at Seattle-Tacoma
International Airport; (2) advertise and award a major works construction contract; (3)
utilize Port of Seattle crews and small works contracts to perform construction work.
The amount of this request is $3,903,000 for a total estimated project cost of $3,978,000
(CIP #C800762). 
Request document(s) included a Commission agenda memorandum and presentation slides. 
4d.  Authorization for the Executive Director to prepare the design and construction
documents for the Tenant Network Demarcation project at Seattle-Tacoma International
Airport to standardize the Port's tenant communications network demarcation for an
amount not to exceed $723,000 of a total estimated project cost of $2,815,000 (CIP
#C800841). 
Request document(s) included a Commission agenda memorandum. 
As noted above, agenda item 4e was temporarily postponed. 
4f.   Authorization for the Executive Director to: (1) proceed with design of the Airport
Dining and Retail Kiosk Program Expansion project at Seattle-Tacoma International
Airport; (2) utilize existing or future Job Order Contracts, procured separately, to
construct the project and (3) use Port crews to perform work related to the
construction of the kiosk spaces as needed. The total estimated project cost is
$1,240,000 (CIP #C800846). 
Request document(s) included a Commission agenda memorandum and presentation slides. 


Minutes of September 26, 2017, submitted for review on January 24, 2018, and proposed for approval on January 30, 2018.



PORT COMMISSION MEETING MINUTES                    Page 5 of 9 
TUESDAY, SEPTEMBER 26, 2017 
The motion for approval of consent items 4a, 4b, 4c, 4d, and 4f carried by the following vote: 
In favor: Albro, Bowman, Creighton, Felleman, Gregoire (5) 
A recording of this part of the meeting has been made available online. 
The Commission advanced to consideration of  
ITEMS REMOVED FROM CONSENT 
4e.  Revision of the amended authorization of agenda item 6c of September 12, 2017,
related to the South 160th Street Ground Transportation Lot, to read as follows:
Request Commission authorization for the Executive Director to (1) increase the
project authorization by $2,231,533  $2,500,000 for the S. 160th St. Ground
Transportation Lot Improvements project at Seattle-Tacoma International Airport; (2)
complete the design, advertise for bids, award and execute a major works construction
contract; (3) authorize the use of Port Construction Services and small works contracts
to rehabilitate the existing transportation building at the S. 160th St. lot; and (4) plan for
potential construction of a new smaller facility for on-demand operators; for a total
project authorization of $4,326,533 (CIP #C101107). [subsequently amended] 
Request document(s) included a Commission agenda memorandum and presentation slides. 
Presenter(s): Ralph Graves, Senior Director, Capital Development, and Barry Hennelly, Capital
Project Manager, Aviation. 
Of the requested amount, $300,000 is for planning a second lot and will not be spent until planning
is complete. 
The action request was amended to read as follows: 
Revision of the amended authorization of agenda item 6c of September 12, 2017,
related to the South 160th Street Ground Transportation Lot, to read as follows:
Request Commission authorization for the Executive Director to (1) increase the
project authorization by $2,231,533 for the S. 160th St. Ground Transportation Lot
Improvements project at Seattle-Tacoma International Airport; (2) complete the
design, advertise for bids, award and execute a major works construction contract;
(3) authorize the use of Port Construction Services and small works contracts to
rehabilitate the existing transportation building at the S. 160th St. lot; and
(4) pending completion of a ground transportation access plan, plan for potential
construction of a new smaller facility for on-demand operators; for a total project
authorization of $4,326,533 (CIP #C101107). [as amended] 
The motion for approval of agenda item 4e, as amended, carried by the following vote: 
In favor: Albro, Bowman, Creighton, Felleman, Gregoire (5) 
A recording of this part of the meeting has been made available online. 

Minutes of September 26, 2017, submitted for review on January 24, 2018, and proposed for approval on January 30, 2018.





PORT COMMISSION MEETING MINUTES                    Page 6 of 9 
TUESDAY, SEPTEMBER 26, 2017 
6.   DIVISION, CORPORATE, AND COMMISSION ACTION ITEMS 
6a.  Authorization for the Executive Director to execute a consulting contract for Executive
Program Management Services for up to five years in the not-to-exceed amount of
$15,000,000. 
Request document(s) included a Commission agenda memorandum and presentation slides. 
Presenter(s): Lance Lyttle, Managing Director, Aviation; Jeffrey Brown, Director, Aviation Facilities
and Capital Programs; and Ralph Graves, Senior Director, Capital Development. 
Aviation projects are increasing in number and complexity, so additional resources are necessary
to augment current staffing. This contract will provide coordination of projects for improved
efficiency and more accurate estimates. 
Key functional areas fulfilled by this contract will be program controls, program risk management,
and design coordination. Port staff will handle program formulation and construction coordination. 
Recruitment of permanent staff is not a good alternative because attracting quality candidates with
the appropriate skill set and level of experience is unlikely. However, it is anticipated that contract
staff will transfer skills to existing Port staff, and successful implementation of this initiative will
result in Port personnel who will be able to take over the functions fulfilled by the contractors. 
The motion for approval of agenda item 6a carried by the following vote: 
In favor: Albro, Bowman, Creighton, Felleman, Gregoire (5) 
A recording of this part of the meeting has been made available online. 
6b.  Authorization for the Executive Director to (1) proceed with the demolition and salvage
of the existing bank and Net Shed #'s 7 and 8 buildings at Fishermen's Terminal and
(2) advertise and execute a major public works contract for demolition, all for an
amount not to exceed $1,300,000 out of a total estimated project cost of $1,530,000 (CIP
#C800525). [subsequently amended] 
Request document(s) included a Commission agenda memorandum and presentation slides. 
Presenter(s): Tim Leonard, Capital Project Manager, and Jeffrey Utterback, Director, Real Estate &
Economic Development. 
Provisions have been made regarding the buildings scheduled for demolition. Net shed tenants
displaced from buildings 7 and 8 will be relocated to comparable net lockers. Tenants are being
rearranged for more efficient use of the remaining space. The bank vault and safe deposit boxes
will be salvaged. Demolishing these buildings now will help avoid delays in the gateway building
schedule. 


Minutes of September 26, 2017, submitted for review on January 24, 2018, and proposed for approval on January 30, 2018.





PORT COMMISSION MEETING MINUTES                    Page 7 of 9 
TUESDAY, SEPTEMBER 26, 2017 
The action request was amended to read as follows: 
Authorization for the Executive Director to (1) advertise and execute a major public
works contract for demolition and salvage of the existing bank building and Net
Shed buildings 7 and 8 at Fishermen's Terminal for an amount not to exceed
$1,300,000 out of a total estimated project cost of $1,530,000 and (2) proceed with
demolition only upon commission approval of execution of a build-to-suit lease
requiring said demolition (CIP #C800525). [as amended] 
The motion for approval of agenda item 6b, as amended, carried by the following vote: 
In favor: Albro, Bowman, Creighton, Felleman, Gregoire (5) 
A recording of this part of the meeting has been made available online. 
7.   STAFF BRIEFINGS 
7a.  Baggage Optimization Project Update. 
Presentation document(s) included a Commission agenda memorandum and presentation slides. 
Presenter(s): Greg Carey, Capital Program Leader, Aviation Project Management Group, and Ed
Weitz, Capital Project Manager V, Aviation Project Management Group. 
The project is on track with the schedule established in 2015. Phases are scheduled so that each
phase will begin construction at the conclusion of the previous phase. Spending and Transportation
Security Administration reimbursements are proceeding according to the budget. 
Small business participation goals are being met, with Small Business Enterprise (SBE)
participation at 15.1 percent compared to the goal of 15 percent, and Small Contractor & Supplier
participation at 7.4 percent of the SBE value compared to the goal of 5 percent). D isadvantaged
business enterprise (DBE) participation will be tracked, but it may not be possible to direct
contractor inclusion of DBEs. However, phases 2 and 3 have not been bid yet, and DBE
requirements can be built into subsequent contracts. 
A recording of this part of the meeting has been made available online. 
Commissioner Gregoire was absent after 3:48 p.m. 
7b.  2018 Corporate Budget Briefing. 
Presentation document(s) included a Commission agenda memorandum and presentation slides. 
Presenter(s): Dan Thomas, Chief Financial Officer; Michael Tong, Assistant Director, Finance &
Budget; and Kim Albert, Director, Information & Communications Technology Delivery. 
A summary of the preliminary corporate budget was presented, including key initiatives and budget
drivers, and an overview of corporate expenses. Budget requests and new staff positions 

Minutes of September 26, 2017, submitted for review on January 24, 2018, and proposed for approval on January 30, 2018.




PORT COMMISSION MEETING MINUTES                    Page 8 of 9 
TUESDAY, SEPTEMBER 26, 2017 
supporting Commission priorities, such as a new position to support a Port wide equity program, 
continuation of the high school internship program, and increased community outreach were
highlighted. Other division priorities and business needs include additions to the police, human
resources, central procurement, and accounting departments, as well as expenses related to
relocation of some central procurement staff to new office space. 
Commissioners provided recommendations regarding future presentation of budget information,
including: 
illustration of how budget allocations support Century Agenda goals; 
a comparison of the actual budget and budget forecast for prior years in order to compare
projected and actual spending; 
a clearer depiction of how many overall full-time-equivalent positions are being added; 
description of areas where budgets have been reduced; and 
a histogram of non-recurring initiatives that roll over from year to year. 
An overview of the capital budget for was provided for 2018, with anticipated costs for some
projects through 2022. Projects that are currently authorized and underway were described, as well
as projects that will be presented for authorization in the future. 
A recording of this part of the meeting has been made available online. 
7c.  2018-2022 Long Range Plan: Final Draft Review. 
Presentation document(s) included a Commission agenda memorandum, plan document, and
presentation slides. 
Presenter(s): Dave Caplan, Senior Director, Strategic Initiatives. 
An overview and briefing on 20 of the 27 Long Range Plan objectives was presented on July 25,
2017. This briefing recapped that presentation and discussed incorporation of Commission
feedback, covered the final seven objectives, and summarized plan progress and goals. 
Increasing the participation of Women and Minority Business Enterprise (WMBE) firms contracting
with the Port is the primary focus of small business goals. Concern was expressed regarding the
expression of the WMBE goal as a proportion of funds spent without referencing the number of
participating firms, and it was requested that the goal be amended to include both measurements. 
Commissioners and staff discussed carbon reduction goals; reducing the Port's carbon footprint
during a period of overall growth is going to present a challenge. 
Next steps were outlined, including approval of the plan at a future meeting, critique of the
scorecard as a means of illustrating progress, and the annual planning cycle's interaction with the
annual budget cycle. 


Minutes of September 26, 2017, submitted for review on January 24, 2018, and proposed for approval on January 30, 2018.

PORT COMMISSION MEETING MINUTES                    Page 9 of 9 
TUESDAY, SEPTEMBER 26, 2017 
Commissioner Bowman was present until 4:45 p.m. 
A recording of this part of the meeting has been made available online. 
8.   ADDITIONAL NEW BUSINESS  None. 
9.   ADJOURNMENT 
There was no further business, and the meeting adjourned at 5:11 p.m. 
Ryan Calkins 
Secretary 
Minutes approved: January 30, 2018. 













Minutes of September 26, 2017, submitted for review on January 24, 2018, and proposed for approval on January 30, 2018.

Limitations of Translatable Documents

PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.