6f Lower Duwamish presentation
Item No. 6f supp Meeting Date: June 12, 2018 Begin Clean-up Design on Lower Duwamish Waterway 1 4th Amendment to the Administrative Order on Consent Begin the Cleanup Design for the upper third of the LDW Approximately 2 miles Continue monitoring fish tissue and water concentrations Continue to fund the seafood consumption advisory efforts Port's cost $4-5M via Environmental Remediation Liability program 2 Cleanup Design Includes Sampling to refine the extent and type of cleanup method Engineer design drawings and specifications 3 Timeline 2016 2017 2018 2019 2020 2021 2022 2023 2024 ENR Carbon Pilot Study (AOC2) Pre-Design/Baseline Study (AOC3) Cleanup Design of the Upper Third (AOC4) Seafood Consumption Advisory (AOC1, AOC3, and AOC4) Construction 4
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.