5f supp

ITEM NO: ______5f_______ 
DATE OF MEETING: September 24, 2013

Lora Lake Apartments Cleanup 
September 24, 2013

3 \\
'          .'n- u  l  W
>509
.
E                                                             5
a
W           11"!!!
.
.
M 1 u :w-w         J
'm
' \
Swlmh"              Mm
;v'l awn '           U..-

.'t :
H                      v-   AHI'MOW i
*0" a."                                                    '1'
.H L"
,
599
Bouleva rd Park \'
A,P"'~;H[fl /
'   a
Mom
"Fm:                     gs"       i   1S- \
5""    A
M      v
r; mm S'JRHN                                          E
; mm        f /
E i-"-l-'."L.'.A
l/'hnnwl
"'5':            Id} H m\'\
g
5...,"      Lora Lake                 1932 Dredged Material \
M
Apartments Parcell        J:     Containment Area             '\
/.                     n-m n
"W.
Seahurst
Bud/en '
A\'\
{:xRiverton         3"
r,  ; mm                             '\\
IVE'EIIII All \ . *1tq
'                                                   7\
,1 A-Jh.'                                                    :/)'\h{l\\
>5,         \Lora Lake,            5" ' \
Comm                              \E
SWWSI swmn \\
__ParI J     mom.
L" 59"" "'5                      . '1      k
(3
chum:                    509
N  ..,.                                             99
in." Jun V M                     i \\                 3.

ELY                                        '
'
"hum",                         \                 A. .        a
-2                t
Normandy Park.                                             "-
M
\J                       sum.
5
5'
"ML f-l

Valley
W
M
'A', L' Li 3A".
SIMS'
rm

'i turn H.
_
.-
Nous:
-MapumdusmanngsRoadlayet
__
-cootdnmmdpnsenmanA01983HARN
"PMMMWWIW
whenmdwm.
Maijeeuon= LGbenOonbrmalComc.
m

Cleanup Actions 
Apartments  Removal of 19,000 cubic yards of
dioxin contaminated soil and capping of 3.8
acres of remaining soil. Port option for additional
cleanup to prepare site for development.
Lake Parcel  Capping of contaminated
sediments, and restoration of Lora Lake to a
wetland.

Clean up Action Areas

Lora Lake Apartments Cleanup 
Upcoming Milestones 
Request Commission Authorization for the CEO to Sign the Consent
Decree - September 24, 2013 
Public Comment Period  October or November 2013 
Draft RI/FS Report 
Draft Cleanup Action Plan 
Consent Decree or Agreed Order 
Design Apartment  and Lake Cleanup   2014-2015 
Complete Cleanup at Apartments  Summer of 2016 
Complete Cleanup at Lake  Summer 2017

Lora Lake Apartments Cleanup 
Financial Implications 
Total Estimate of Cleanup  cost = $18.2 Million 
The cleanup costs of the Lora Lake Apartments parcel and the Lora
Lake parcel will be accounted for differently: 
The Lake cleanup will be accounted for as an operating cost as the property is
part of the object free area within the runway protection zone (RPZ), thus no
development is permitted 
Estimated cost = $4.9 million (2013 operating cost) 
The Lora Lake Apartments parcel is not necessary for airfield operations. The
Port's intent is to clean up the property in anticipation of sale. The clean-up
costs are being accounted for as non-operating costs. 
Estimated cost = $13.3 million ($11.5 million recognized as non-operating expense in
2012, $1.8 million recognized as non-operating expense in 2013)

Limitations of Translatable Documents

PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.