6b Presentation Airfield Pavement
Item No: 6b_supp Meeting Date: November 27, 2018 2020 Airfield Pavement Replacement Projects 1 2020 Airfield Pavement Replacement Projects 2 sections between Service Road adjoining Gate C17 Area Taxiway B and Taxilane W Cargo 3 and related IWS Area between ARFF Station Cargo 2 east GSE storage and NSAT Taxilane and laydown area Distressed and damaged pavement areas to be replaced. 2 2020 Airfield Pavement Replacement Projects General Timeline of Design, Authorization, and Construction. 3
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.