6h Presentation Fishermans Terminal Dock Improvements
Item No.: 6h_Supp Date: January 22, 2019 Fishermen's Terminal Docks 3, 4, and 5 Fixed Pier Improvements Fishermen's Terminal Docks 3, 4, and 5 Fixed pier locations 2 Fishermen's Terminal Docks 3, 4, and 5 Docks 3 and 4 current condition Dock 5 current condition Corrosion Photographs 3 Fishermen's Terminal Docks 3, 4, and 5 DOCKS 3, 4, & 5 PROTECTIVE WRAP EXISTING WATER LINE STEEL PILING (ELEVATION VARIES) Docks 3, 4, and 5 Corrosion Prevention Methods Preservation Procedures 3 Timeline Fishermen's Terminal Pier Improvements to be Completed by Q3 2020 4
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.