6f Ground Boarding presentation
Item No. 6f_supp Date of Meeting April 23, 2019 Air Cargo 5 Ground Boarding Facility Commission Meeting April 23, 2019 1 Air Cargo 5 Ground Boarding Facility North Satellite Terminal Hardstand 5 North Entry Drive Doug Fox Parking Hard Stand No. 5 North of the Airport Terminals 2 Air Cargo 5 Ground Boarding Facility Ground Board Operations Location for aircraft to embark/disembarks via a mobile stairway Ground Board Facility Space for employees servicing ground board operations to be protected from the elements while preparing for upcoming operations Ground Board Facility for Airline Operations Personnel Use 3 Air Cargo 5 Ground Boarding Facility 1. COBUS operation will route from Concourse D hardstand facility (D-Annex) to Hardstand 5 2. Mitigates loss of gates during NSAT construction by providing ground board operation at remote hardstand at Air Cargo (Hardstand) 5 3. Ground board operation will be functional until new gates are added under Sustainable Airport Master Plan (SAMP) Ground Board Operations Mitigate NSAT Construction Impact to Airline Operations 4 Air Cargo 5 Ground Boarding Facility Commission Approval Q2 2019 Design Complete Q2 2019 Obtain Permits Q2 2019 Pre-fabricated trailer procurement Q3 2019 complete Q3 2019 Provide interim, temporary solution Q3 2019 Construction Complete Q3 2019 Target Milestones 5
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.