Sustainable Airport Master Plan Near-Term Projects Presentation
Item No. ____ _3c ___ Meeting Date: July 23, 2019 AVIATION CAPITAL PLANNING & PRELIMINARY DESIGN ACTION ITEM July 23, 2019 Briefing overview Project Planning Process Near-Term Projects Projects Requiring Preliminary Design Glideslope Antenna Relocation Next Steps 1 Project Planning Process Master planning - complete Campus wide, comprehensive planning Alternatives analysis for major plan elements Advanced planning - in progress More detailed planning in focus areas of long-range plan and existing facilities Alternatives analysis within individual projects (e.g. options for configuring curbs and functional areas for Second Terminal) Preliminary design - current capital funds request Program development for individual projects Adequate detail required to transition projects to design Results in a Project Definition Document (PDD) 2 Near-Term Projects 3 Near-Term Projects Design/construction period estimates for major projects NOTE: Preliminary design precedes design phase shown above and is not depicted. Commission authorization is required to proceed into design 4 Projects Requiring Preliminary Design 1 1) Westside Maintenance Campus 2 2) Aircraft Rescue and Fire- Fighting (ARFF) Relocation 3) Roadway Improvements 4 4) Taxiway A/B Extension 5) Main Terminal North GT Lot 5 3 Design/construction period estimates 5 Glideslope Antenna Relocation Taxiway A/B project requires relocation of Runway 34R glideslope antenna Opportunity to adjust slope angle and increase aircraft elevation on approach Sea-Tac Stakeholder Advisory Round Table (StART) recommendation Relocate to potentially permanent location (i.e. consistent with Taxiway A/B project) Attempt to obtain a 3.1 glideslope angle Look for ways to expedite the project Begin design (design at risk prior to conclusion of environmental review) Initiate procedure development as soon as possible Design/construction by FAA with reimbursement by the Port 6 Next Steps Following Commission authorization Utilize $10M capital funds to conduct preliminary design Projects currently identified as requiring preliminary design in the short term Westside Maintenance Campus Air Rescue and Fire-Fighting (ARFF) Facility Taxiway A/B Extension Main Terminal North GT Lot North Airport Expressway Improvements Other projects to be identified through additional advanced planning Procure and execute professional services contracts Enter into Reimbursable Agreements with FAA (Glideslope) 7
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.