6j Airfield Pavement Replacement Presentation
Item No. 6j supp Meeting Date: November 12, 2019 2020 Airfield Pavement Replacement Projects CIP# C800483 2020 Airfield Pavement Replacement Projects Scope The 2020 projects are comprised of the following 6 Work Areas: Area 1: Reconstruction of the Asphalt Concrete Pavement (ACP) at Cargo 2 east laydown area. Area 2: Reconstruction of the Portland Cement Concrete Pavement (PCCP) and ACP at the Vehicle Service Road, Cargo 2, Cargo 3, and Industrial Waste System utility upgrade. Area 3: Reconstruction of the ACP at North Satellite taxilane shoulder and the apron south of the Airport Rescue and Fire Fighting station. Area 4: Reconstruction of the PCCP at Taxilane W and Taxiway B at the north entrance to the South Satellite. Area 5: Reconstruction of the PCCP at Taxilane W and Taxiway B at the south entrance to the South Satellite. Area 6: Replacement of individual PCCP (w/ Quick-Set Panels) and Joint seal on Taxiway B. 3 Schedule Commission Authorization for Construction 2019 Quarter 4 Contract Execution 2020 Quarter 1 In-use date 2020 Quarter 4 4 Budget Design $1,285,000 Construction $17,131,000 Total $18,416,000 5 Project Risks There are a limited the number of gate closures available airport-wide for construction. Gate opening delays on other airport projects could delay the start of portions of the 2020 Airfield Pavement Replacement Project work. 6
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.