6f Terminal 91 Fender Replacement Presentation

Item No.: 6f_Supp
Meeting Date: December 10, 2019
Terminal 91 Northwest Fender
Replacement

Kenneth Lyles  Director, Fishing and Commercial Operations
Mark Longridge  Capital Project Manager

Project Location



2

Current Condition
70% of piles show deterioration
30% of piles currently broken, split or hollowed







3

Proposed Replacement



4

Limitations of Translatable Documents

PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.