COMMISSION AGENDA MEMORANDUM Item No. 6j ACTION ITEM Date of Meeting July 14, 2020 DATE: June 2, 2020 TO: Stephen P. Metruck, Executive Director FROM: Tina Soike Director Engineering Services Janice Zahn Assistant Director Engineering Chris Sherwood Construction Manager SUBJECT: Baggage Optimization Phase 2 Special Testing and Inspection Services Amount of this request: $0 Total estimated project cost $425,675,000 for Phase 2: ACTION REQUESTED Request Commission authorization for the Executive Director to execute one project specific consulting agreement for services related to special testing and inspection on the Baggage Optimization Project Phase 2. The estimated amount is $450,000 over a 4-year period or the life of the project. EXECUTIVE SUMMARY As a condition of construction permits, Building Officials require independent special inspections in addition to the inspections performed by the Port's Construction Management inspectors or the contractors. Special inspection agencies evaluate components of construction that are critical to the safety of the structure and site stability. The project owner selects and pays the special inspection agencies; however, the special inspection agencies provide inspection information and final documentation of compliance with special inspection requirements to the Building Official. Special Inspection agencies are typically required to be independent, third party entities. JUSTIFICATION The Baggage Optimization Phase 2 project has been estimated to require approximately 5000 - special testing and inspection hours, over the 4-year duration of this construction contract. The current Construction Management Special Testing and Inspection Contracts do not have sufficient capacity to provide the services required for this contract and our other anticipated construction projects. A project specific agreement will give the project the budget capacity and Template revised January 10, 2019. COMMISSION AGENDA Action Item No. 6j Page 2 of 5 Meeting Date: July 14, 2020 provide flexibility should additional testing be required once work begins or the contract completes later than the original 4-year duration. Diversity in Contracting We are working with the Diversity in Contracting Department to determine if Women and Minority Business Enterprises (WMBE) goals are feasible for this project. DETAILS The purpose of this project is to optimize the Baggage Handling System (BHS) and achieve the maximum outbound baggage capacity within the current airport footprint. When complete, this project will have achieved the following outcomes: Increased outbound system capacity up to 60 million annual passengers (MAP); Increased system reliability, redundancy, and security; Flexibility in airline ticket counter use and related gate assignments; Reduced minimum connect-times where possible; and Long term energy savings. Scope of Work Over the next 4 years the Baggage Optimization Phase 2 project will require special testing and inspection services for an estimated contract value of $450,000. To support the special testing and inspection on this project, a request for proposal (RFP) would be issued to execute one (1) project specific contract to provide special testing and inspection services. Types of testing may include: Welding/Structural Steel Concrete Compression Masonry Asphalt Fireproofing The RFP may include goals for WMBE participation. The contract duration will be four (4) years to cover the length of construction. The actual contract duration may extend beyond four years in order to complete the work identified in scope of work. Schedule Activity Phase 2 contract award 2020 Quarter 3 Phase 2 substantial completion 2024 Quarter 2 Template revised June 27, 2019 (Diversity in Contracting). COMMISSION AGENDA Action Item No. 6j Page 3 of 5 Meeting Date: July 14, 2020 ALTERNATIVES AND IMPLICATIONS CONSIDERED Alternative 1 Utilize existing Special Testing and Inspection IDIQ's Cost Implications: Depletion of funds in existing contracts prior to completion of project. Pros: (1) NONE Cons: (1) Depletion of current contracts prior to completion of project (2) Put strain on existing projects currently using these contracts This is not the recommended alternative. Alternative 2 Perform testing and inspection with internal port staff. Cost Implications: This would require hiring additional staff, and training for testing certifications. Pros: NONE Cons: (1) This method is not approved by the Airport Building Department (2) This method does not match our project specifications. (3) Limited availability of properly trained and certified staff. This is not the recommended alternative. Alternative 3 Procure an outside Special Testing and Inspection agency to perform the Special Testing and Inspections requried Cost Implications: NONE. There is no additional funding being requested in this memo. The project has adequate funds to cover this request. Pros: (1) Outside testing agency has the required certifications and experience to perform this level of work. (2) This is the current approved testing and reporting structure for Airport Building Department. (3) Allows Port to receive competitive bids for work. (4) Allows for potential WMBE participation goals. Cons: (1) NONE Template revised June 27, 2019 (Diversity in Contracting). COMMISSION AGENDA Action Item No. 6j Page 4 of 5 Meeting Date: July 14, 2020 This is the recommended alternative. ATTACHMENTS TO THIS REQUEST None PREVIOUS COMMISSION ACTIONS OR BRIEFINGS January 21, 2020 Baggage Optimization Phase 2 Bid irregularity and Budget Increase (CIP #C800612, WP #U00424) April 23, 2019 Commission Authorization to (1) advertise, award, and execute a construction contract for the Baggage Optimization Phase 2 project at Seattle-Tacoma International Airport; (2) employ a project labor agreement (PLA); and (3) utilize Port crews and small works contracts to perform construction work February 26, 2019 Baggage Optimization Quarter 4 Project Briefing October 23, 2018 Baggage Optimization Quarter 3 Project Briefing June 12, 2018 Baggage Optimization Quarter 2 Project Briefing January 9, 2018 Baggage Optimization Quarter 4 Project Briefing September 26, 2017 Baggage Optimization Quarter 3 Project Briefing June 27, 2017 Commission authorization to (1) authorize additional design and project management funds to expand the capacity to 60 million annual passengers (MAP); (2) use Port crews and small works contracts to perform additional construction work; and (3) amend Service Agreement P-00317641 to add $10,160,000 October 25, 2016 Baggage Optimization Quarter 4 Project Briefing July 12, 2016 Commission authorization to advertise and execute a contract for construction Phase 1 June 28, 2016 Baggage Program Briefing May 17, 2016 Checked Baggage Optimization Project Briefing March 8, 2016 Commission authorization for the Chief Executive Officer to amend the Baggage Optimization Design Services contract June 23, 2015 Checked Baggage Optimization Project Briefing September 10, 2013 The Commission authorized the execution of an Other Transaction Agreement (OTA) with TSA for reimbursable costs for design; construction, and to authorize $15 million to continue from 30% to 100% design; and execute a consultant service agreement for program management support services August 20, 2013 Response to questions from Commissioners asked during August 6, 2013 Commission Meeting August 6, 2013 The Commission was briefed on the near-term and long-term challenges related to handling checked baggage at the Airport January 22, 2013 The Commission authorized $5 million for staff to begin design through 30%, and to enter into an agreement to allow reimbursement from the federal government to the Port for eligible elements of the 30% design effort January 8, 2013 Baggage Systems Briefing Template revised June 27, 2019 (Diversity in Contracting). COMMISSION AGENDA Action Item No. 6j Page 5 of 5 Meeting Date: July 14, 2020 August 14, 2012 Baggage system recapitalization/optimization was noted in the 2013 business plan and capital briefing as a significant capital project not included in 2013-17 capital program August 7, 2012 Baggage system recapitalization/optimization was referenced as one of the drivers for the need to develop an Airport Sustainability Master Plan June 26, 2012 The Airport's baggage systems were discussed during a briefing on terminal development challenges May 10, 2012 TSA's interest in a national recapitalization/optimization plan for all baggage-screening operations was referenced in a design authorization request for the C60-C61 Baggage Handling System Modifications Project Template revised June 27, 2019 (Diversity in Contracting).
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.