6g Presentation, Miller Creek Culvert Replacement
Item No. 6g_supp Meeting Date: August 11, 2020 Miller Creek Culvert Replacement, Fish Passage and Habitat Restoration Interlocal Agreement and Funding Authorization Project Background City of Burien Project Abandon failing culverts blocking fish passage Construct new fish passable culverts Stream habitat restoration Current Status Planning, design and permitting substantively complete Construction scheduled for Summer 2021 Funding shortfall Commission Motion to advance project (November 2019) 2 Why is this critical to the Port? After Culvert Failure 3 Restoration Concept Objectives: Protect Port mitigation sites Protect Des Moines Memorial Boulevard Restore stream and riparian habitat Integrate NERA stormwater, common-use trail, and utility infrastructure Design components: Abandon existing culverts Construct new fish passable culverts Restore Stream 4
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.