8b Presentation Harbor Island Marina Dock-E design
Item No: 8b_Supp Meeting Date: November 17, 2020 Harbor Island Marina Dock-E Floats & North Pier Improvements DESIGN FUNDING APPROVAL November 17, 2020 Project Location 2 HIM Dock-E Existing Tenant Moorage 3 HIM Dock-E Floats & North Pier Improvements Scope of Work 4 HIM Dock-E Floats & N. Pier Schedule 2020 2021 2022 2023 2024 Effort Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Planning Design Permitting Construction Bid & Award Construction In-water Work Windows = Commission Meeting Authorization 5 Harbor Island Marina Improvement Projects 6
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.