Transcript

The Regular meeting scheduled for 2021-11-09 at Remote

  • GOOD MORNING
  • THIS IS COMMISSION PRESIDENT FRED FELLEMAN CONVENING THE REGULAR MEETING OF NOVEMBER 9, 2021
  • THE TIME NOW IS 1030
  • WE'RE MEETING REMOTELY TODAY VIA TEAMS TO COMPLETE LINE WITH SENATE CONCURRENT RESOLUTION 84 AND TWO AND IN ACCORDANCE WITH GOVERNOR INSLEE'S PROCLAMATION 2028 WITH ME TODAY, OUR COMMISSIONERS BOWMAN, CALKINS, CHO, AND STEINBRUECK, WHO ARE CURRENTLY GATHERED ON THE EXECUTIVE SESSION ALIGN AWAITING THE OPENING OF THE PUBLIC MEETING
  • WE IMMEDIATELY RECESSED INTO AN EXECUTIVE SESSION TO DISCUSS THREE ITEMS REGARDING LITIGATION OR POTENTIAL LITIGATION OR LEGAL RISK PER RCW 42.30.110 1 (i) FOR APPROXIMATELY 50 MINUTES AND WILL RECONVENE INTO PUBLIC SESSION AT TWELVE NOON, WHICH WILL INCLUDE A PUBLIC HEARING ON THE DRAFT BUDGET
  • WE'LL NOW GO OVER TO THE EXECUTIVE SESSION
  • THANK YOU
  • THANK YOU
  • WE ARE IN RECESS TO EXECUTIVE SESSION AND WE WILL SEE YOU ON THAT LINE
  • VERY GOOD
  • GOOD AFTERNOON
  • THIS IS COMMISSION PRESIDENT FRED FELLEMAN RECONVENING THE REGULAR MEETING OF NOVEMBER 9, 2021
  • THE TIME IS 1202
  • WE'RE GATHERING REMOTELY TODAY VIA TEAMS TO COMPLY WITH SENATE CONCURRENT RESOLUTION 84, TWO AND IN ACCORDANCE WITH GOVERNOR INSLEE'S PROCLAMATION 20-28
  • PRESENT WITH ME TODAY ARE COMMISSIONERS BOWMAN, CHO, AND STEINBRUECK
  • COMMISSIONER CALKINS WILL BE JOINING US MOMENTARILY
  • I'LL ASK THE CLERK TO DO A ROLL CALL OF ALL COMMISSIONERS TO ENSURE EVERYONE IS ONLINE
  • CLERK HART, THANK YOU
  • BEGINNING WITH COMMISSIONER BOWMAN
  • I'M PRESENT
  • THANK YOU
  • COMMISSIONER CHO PRESENT
  • THANK YOU
  • COMMISSIONER STEINBRUECK HERE
  • THANK YOU
  • COMMISSIONER CALKINS HAS NOT JOINED US AS OF YET
  • COMMISSIONER FELLEMAN PRESENT
  • THANK YOU
  • YOU DO HAVE FOUR OUT OF FIVE HERE THIS MORNING
  • THANK YOU
  • TODAY'S MEETING IS STRUCTURED FOR OUR VIRTUAL FORMAT
  • WE'VE MADE SPECIAL ARRANGEMENTS TO PROVIDE FOR REMOTE PARTICIPATION FOR ALL OF OUR STAFF AND COMMISSIONERS
  • LATER WE'LL TAKE PUBLIC COMMENT FROM PEOPLE WHO ARE PARTICIPATING BY TEAMS AND WHO HAVE SIGNED UP TO SPEAK
  • ALL VOTES TODAY WILL BE TAKEN BY THE ROLL CALL METHOD
  • SINCE ALL COMMISSIONERS ARE PARTICIPATING REMOTELY, THAT MEANS FOR EACH VOTE, THE CLERK WILL CALL EACH COMMISSIONER'S NAME
  • COMMISSIONERS ON THE TEAM'S GOAL WILL THEN MAKE SURE THEY ARE UNMUTE AND THEN ANSWER YES OR NO TO BE EQUITABLE
  • WE'LL ASK ALL COMMISSIONERS TO SPEAK IN TURN AND WAIT TO BE RECOGNIZED BEFORE SPEAKING AS MUCH AS POSSIBLE
  • WE'RE MEETING ON THE ANCESTRAL LANDS AND WATERS OF THE COAST SALISH, PEOPLE WITH WHOM WE SHARE A COMMITMENT TO STEWARD THESE NATURAL RESOURCES FOR FUTURE GENERATIONS
  • THIS MEETING IS BEING DIGITALLY RECORDED AND MAY BE VIEWED OR HEARD AT ANY TIME ON THE PORT'S WEBSITE AND MAY BE REBROADCAST BY KING COUNTY TELEVISION
  • PLEASE STAND OR JOIN ME FOR THE PLEDGE OF ALLEGIANCE
  • I PLEDGE ALLEGIANCE TO THE FLAG OF THE UNITED STATES OF AMERICA AND TO THE REPUBLIC FOR WHICH IT STANDS
  • ONE NATION UNDER GOD, INDIVISIBLE WITH LIBERTY AND JUSTICE FOR ALL
  • FIRST ITEM ON THE AGENDA IS THE APPROVAL OF THE AGENDA
  • COMMISSIONERS, PLEASE UNMUTE YOURSELVES
  • I'M GOING TO ASK EACH COMMISSIONER IN TURN IF THEY HAVE ANY MOTIONS TO REARRANGE THE ORDERS OF THE DAY
  • AND IF YOU DO, I'LL ASK FOR A SECOND
  • PLEASE RESPOND WHEN THE CLERK CALLS YOUR NAME
  • IF YOU HAVE NO CHANGES, JUST SAY NONE
  • CLERK HART, PLEASE CALL THE ROLL FOR ANY CHANGES IN THE AGENDA
  • THANK YOU FOR CHANGES TO THE AGENDA BEGINNING WITH COMMISSIONER STEINBRUECK
  • NO CHANGES
  • THANK YOU
  • THANK YOU, COMMISSIONER JOE
  • YES
  • I DON'T HAVE ANY MOTIONS TO CHANGE THE AGENDA, BUT I DID WANT TO NOTIFY MY COLLEAGUES IN THE PUBLIC THAT FOR ITEMS NINE A AND NINE B, I WILL BE RECUSING MYSELF FROM BOTH THE DISCUSSION AND THE VOTER TO CONFLICT ADVENTURE WITH MY DAY JOB
  • SO JUST WANT TO LET EVERYONE KNOW
  • THANK YOU
  • THANK YOU
  • COMMISSIONER CHO
  • COMMISSIONERS HAS JOINED COMMISSIONER CALKINS FOR CHANGES TO THE AGENDA
  • NONE
  • THANKS
  • COMMISSIONER BOWMAN
  • CHANGES TO THE AGENDA
  • ACTUALLY, I'M NOT SURE PER OUR BYLAWS
  • IF I CAN MOVE ITEMS NINE A AND NINE B TO THE END OF THE AGENDA, IS THAT POSSIBLE? YOU CAN CERTAINLY MAKE A MOTION TO COMMISSIONER BOWMAN
  • OKAY, GREAT
  • THEN I WANT TO MAKE A MOTION
  • AND JUST SO WE'VE GOT THAT'S A GREAT DISCUSSION
  • I KNOW THE STAFF HAS GOOD INFORMATION FOR US, BUT WE ALSO HAVE IMPORTANT THINGS ON NEW BUSINESS THAT WE NEED TO GET THROUGH
  • SO I WAS HOPING THAT WE COULD
  • SO MY MOTION WOULD BE TO MOVE ITEMS NINE A AND NINE B TO FOLLOW THE END OF THE NEW BUSINESS
  • SO THEN IT WOULD FOLLOW ITEM TEN
  • H
  • MR COMMISSION PRESIDENT, THERE IS A MOTION
  • DO YOU LIKE TO CALL FOR A SECOND? YES, I DO SEE VALUE IN THAT
  • IS THERE A SECOND THEN? YEAH
  • OKAY
  • SO THERE IS A MOTION AND A SECOND ON THE FLOOR
  • WOULD YOU LIKE ME TO CALL THE ROLL FOR A VOTE, PLEASE? THANK YOU
  • AND THIS WOULD REORDER ITEMS NINE A AND NINE B TO THE END OF THE AGENDA
  • JUST FOR CLARITY THERE, BEGINNING WITH COMMISSIONERS STEINBRUECK TO REORDER THE AGENDA
  • YES
  • THANK YOU, COMMISSIONER CHO
  • SURE
  • OH, I'M SORRY
  • COMMISSIONER CHOW IS NOT INVOLVED IN THIS FOR THAT PARTICULAR ITEM, COMMISSIONER CALKINS
  • YEAH, THAT'S FINE
  • THANK YOU
  • COMMISSIONER BOWMAN
  • AYE
  • THANK YOU
  • COMMISSIONER FELLEMAN
  • AYE
  • THANK YOU
  • THERE ARE FOUR YESSES AND ZERO NOS FOR THE REORDER OF THIS AGENDA
  • VERY GOOD
  • THEN THE QUESTION IS BEFORE US, WE VOTED ON THE CHANGE TO THE AGENDA
  • NOW WE HAVE TO APPROVE OF THE AGENDA
  • CORRECT AS AMENDED
  • AND JUST TO NOTE THAT THAT REORDER DID PASS
  • AND IF YOU LIKE, I CAN GO AHEAD AND CALL THE ROLE FOR APPROVAL OF THE AGENDA AS AMENDED
  • THANK YOU
  • THANK YOU
  • BEGINNING WITH COMMISSIONER STEINBRUECK
  • SORRY
  • YES, I HAD JUST HAD A WARNING ABOUT A TORNADO
  • GOODNESS
  • OKAY
  • THANK YOU, COMMISSIONER CALKINS?
  • I'M SORRY
  • COMMISSIONER CHO, APPROVAL OF THE AGENDA AS AMENDED HAS BEEN APPROVED
  • VERY GOOD
  • SO WE HAVE AN APPROVED AGENDA, AND I WILL NOW SAY A COUPLE OF WORDS BEFORE TURNING TO THE EXECUTIVE DIRECTOR'S
  • COMMENTS I'D LIKE TO BEGIN TODAY BY ACKNOWLEDGING THAT NOVEMBER'S NATIVE AMERICAN HERITAGE MONTH
  • WE BEGAN OUR MEETINGS WITH A LAND ACKNOWLEDGEMENT
  • I INITIATED THIS PRACTICE TWO YEARS AGO DURING THE SWEARING AND CEREMONY FOR MY SECOND TERM IN OFFICE AT WHICH SUQUAMISH CHAIRMAN LEONARD POORSMAN PRESIDED
  • THIS LAND ACKNOWLEDGEMENT IS A SMALL ACT THAT RECOGNIZES THE PORT OF SEATTLE EXISTS ON THE ANCESTRAL HOMELANDS OF THOSE WHO WALK HERE BEFORE US AND THOSE WHO STILL WALK HERE AND IDENTIFY AS COAST SALISH PEOPLE AS WELL AS OTHERS IN THEIR DESCENDANTS
  • IT'S PART OF OUR ONGOING WORK TO HONOR AND MAINTAIN A RESPECTFUL RELATIONSHIP WITH THOSE WHOM WE SHARE A COMMITMENT TO STEWARD THESE NATURAL RESOURCES FOR FUTURE GENERATIONS
  • I'VE HAD THE HONOR OF WORKING WITH TRAVEL GOVERNMENTS IN WASHINGTON FOR THE PAST 30 YEARS, AND I'VE COMMITTED TO BUILDING ON THOSE RELATIONSHIPS FOR THE BENEFIT OF THE PORT, THE TRIBES, THE SAILORS, SEA, AND ALL THOSE DEPENDENT ON IT
  • IT'S ALSO IMPORTANT TO RECOGNIZE THAT THIS THURSDAY IS VETERANS DAY, AND NATIVE AMERICANS HAVE SERVED THE US ARMED FORCES SINCE COLONIAL TIMES
  • IT'S BELIEVED THAT THEY'VE SERVED AT A HIGHER PROPORTION THAN ANY OTHER RACIAL OR ETHNIC GROUP
  • THEY'VE DEMONSTRATED THEIR PATRIOTISM DESPITE THE INJUSTICES THEY'VE HAD TO ENDURE
  • THIS VETERAN'S DAYS ALSO MARKS THE 100TH ANNIVERSARY OF THE DES MOINES MEMORIAL DRIVE, KNOWN AS THE ROAD OF REMEMBRANCE IN HONOR OF WORLD WAR ONE VETERANS
  • THE PRESERVATION ASSOCIATION WILL BE CELEBRATING THE ANNIVERSARY AT SUNNYDALE SCHOOL THIS THURSDAY
  • THEY WERE RECIPIENT OF THE PORT'S ACE FUND TO REPLANT THE TREES ON THE DRIVE
  • ANOTHER WAY IN WHICH WE CAN HONOR ALL OUR LOVED ONES AND NEIGHBORS IS BY DOING OUR PART TO GET VACCINATED IF YOU'RE ELIGIBLE TO DO SO
  • THE COVID 19 PANDEMIC CONTINUES TO PRESENT A PUBLIC HEALTH EMERGENCY IN WASHINGTON STATE AND AROUND THE WORLD WITH VIRUSES KILLING OVER 1000 AMERICANS EVERY DAY
  • THE OVERWHELMING CONSENSUS WITHIN THE SCIENTIFIC AND MEDICAL COMMUNITIES IS THAT VACCINATION REMAINS THE SINGLE BEST WAY TO STEM THE SPREAD OF COVID-19, PARTICULARLY IN PREVENTING SEVERE DISEASE
  • THE COMMISSION WILL CONSIDER ENDORSING THE EXECUTIVE DIRECTORS ADOPTION OF POLICY HR 34, REQUIRING PORT EMPLOYEES TO BE FULLY VACCINATED WHEN THEY TAKE UP ITEM TEN H
  • I'D BE REMISS IF I DID NOT ACKNOWLEDGE THAT THE COMMITTEE OF THE PARTIES ARE STILL IN GLASGOW DURING THE COP 26 MEETING
  • THEY'RE STRUGGLING WITH THE HERCULEAN TASK OF PRESERVING OUR PLANET AS WE KNOW IT BY GETTING WEALTHY NATIONS TO CONTRIBUTE PROPORTIONALLY TO THEIR IMPACT
  • WHILE POORER COUNTRIES SUFFERED THE WORST IMPACTS, MANY PRONOUNCEMENTS HAVE BEEN MADE, WHICH HAVE BEEN CRITICIZED AS NOT BEING BOLD ENOUGH
  • ONE BOLD ACTION TAKEN WAS HAVING QUINAULT, CHAIRWOMAN AND PRESIDENT OF THE NATIONAL CONGRESS OF AMERICAN INDIANS FAWN SHARP REPRESENT THE US AT COP 26, BECOMING THE FIRST TRIBAL LEADER TO RECEIVE DIPLOMATIC CREDENTIALS FROM THE STATE DEPARTMENT
  • IN THE ABSENCE OF STRONG INTERNATIONAL LEADERSHIP, GOVERNOR INSLEE JUST ANNOUNCED HIS COMMITMENT TO HAVE ALLSTATE VEHICLES RUN ON ELECTRICITY BY 2035
  • AND OF COURSE, OUR STATE LEGISLATURE HAS MADE SOME OF THE MOST SIGNIFICANT ADVANCEMENTS IN OUR STATE POLICY TO REDUCE GREENHOUSE GAS EMISSIONS AT OUR LAST COMMISSION MEETING
  • THE PORT OF SEATTLE ALSO ANNOUNCED OUR COMMITMENT TO ACCELERATE OUR GREENHOUSE GAS EMISSION REDUCTION GOALS BY TEN YEARS, AND WE JUST SIGNED AN ILA WITH THE CITY WITH CITY LIGHT TO EXPLORE HOW HYDROGEN COULD BE INCORPORATED INTO OUR ENERGY PORTFOLIO
  • AND FINALLY, ALSO OF NOTE IS PRESIDENT BIDEN'S IMMINENT SIGNING OF THE $1.2 TRILLION INFRASTRUCTURE INVESTMENT AND JOBS ACT
  • THE HOUSE PASSED ON FRIDAY
  • THAT'S FIVE MONTHS AFTER EXECUTIVE METRUCK, AND I WROTE AN OP ED IN THE TIMES
  • INVESTING IN INFRASTRUCTURE MEANS MORE THAN BRIDGES
  • WHILE WE HAVE TO WAIT FOR THE PRESIDENT BIDEN'S BUILD BACK BETTER BILL SAY THAT THREE TIMES FAST, OFTEN REFERRED TO AS SOFT INFRASTRUCTURE TO HELP US ACHIEVE OUR AMBITIOUS GREENHOUSE GAS EMISSION GOALS AS A GREEN GATEWAY, IT DOES APPEAR THAT THE AIRPORT EXPECTS TO RECEIVE IN THE ORDER OF $240,000,000, AND THE ALLIANCE WOULD BE ELIGIBLE TO APPLY FOR $2.5 BILLION IN GRANTS, INCLUDING A NEW $250,000,000 GRANT PROGRAM FOR CLEAN TRUCKS
  • I'LL NOW TURN THE MEETING OVER TO EXECUTIVE METRUCK
  • THANK YOU, PRESIDENT FELLEMAN
  • GOOD AFTERNOON, COMMISSIONERS
  • I'M GOING TO TAKE A COUPLE MORE MINUTES OF MY EXECUTIVE DIRECTOR REMARKS BECAUSE THERE'S A LOT GOING ON HERE, SO I JUST WANT TO GIVE YOU THAT NOTICE IN ADVANCE IN THE OPPORTUNITY
  • THANK YOU
  • I'D LIKE TO BEGIN BY TAKING A MOMENT TO ADD MY RECOGNITION TO THE PRESIDENT'S TO NOVEMBER AS NATIVE AMERICAN HERITAGE MONTH
  • THIS IS A TIME TO CELEBRATE RICH AND DIVERSE CULTURES, TRADITIONS AND HISTORIES AND TO ACKNOWLEDGE THE IMPORTANT CONTRIBUTIONS OF NATIVE PEOPLE
  • IT'S ALSO A TIME TO RAISE A GENERAL AWARENESS ABOUT THE UNIQUE CHALLENGES NATIVE PEOPLE HAVE FACED BOTH HISTORICALLY AND IN THE PRESENT AND THE WAYS IN WHICH TRIBAL CITIZENS HAVE WORKED TO CONQUER THESE CHALLENGES
  • IT'S IMPOSSIBLE TO SPEAK OF NATIVE AMERICANS AS ONE GROUP OR COMMUNITY IN WASHINGTON STATE ALONE, AND THERE ARE 29 FEDERALLY RECOGNIZED TRIBES
  • AND SEVERAL HUNDRED YEARS AGO THERE WERE APPROXIMATELY 600 DIFFERENT TRIBES ACROSS NORTH AMERICA RANGING IN SIZE, SPEAKING DIFFERENT LANGUAGES WITH DIFFERENT CULTURES AND TRADITIONS
  • HOWEVER, I THINK THERE'S AT LEAST ONE THING WE CAN SAY FOR CERTAIN ABOUT ALL NATIVE AMERICANS
  • THE HISTORY OF NATIVE AMERICANS IS THE HISTORY OF AMERICA
  • WE ALL HAVE SO MUCH TO LEARN FROM THE WEALTH OF KNOWLEDGE AND GENERATIONS OF THE INDIGENOUS PEOPLES WHO STEWARDED THIS LAND FOR CENTURIES BEFORE US
  • AND DESPITE MANY EFFORTS TO RAISE INDIGENOUS PEOPLE IN THEIR CULTURE, NATIVE AMERICANS HAVE BEEN RESILIENT AND STRONG
  • JUST LIKE LAST WEEK, I TOOK PART IN A RACIAL EQUITY TRAINING REQUIRED FOR ALL PORT MANAGERS
  • MUCH OF THE HOMEWORK AND THE CONTENT OF THE TRAINING FOCUSED ON THE IMPORTANCE OF CENTERING INDIGENOUS PEOPLE IN OUR WORK IN OUR EQUITY EFFORTS
  • I'M GRATEFUL FOR THE OPPORTUNITY TO LEARN, AND I'M GRATEFUL FOR THE PORTS NATIVE AMERICAN COMMITTEE EMPLOYEE RESOURCES GROUP ERG HELPING ALL OF US LEARN AS WELL
  • IN CLOSING IN RECOGNITION OF ONE OF THE GREAT AMERICAN NATIVE AMERICAN LEADERS OF OUR TIME, I'D LIKE TO READ A QUOTE FROM THE UNITED STATES SECRETARY OF INTERIOR SECRETARY HOLLAND, MEMBER OF THE PUEBLO OF LAGUNA
  • WITHIN INDIGENOUS KNOWLEDGE, OUR WORLD CAN USHER IN A NEW ERA OF PEACE, JUSTICE, AND STRONG INSTITUTIONS TO MEET THIS MOMENT AND TO MOVE OUR PLANET TOWARD A MORE SUSTAINABLE CULTURE
  • AND WITH THAT, I WISH EVERYONE A HAPPY NATIVE AMERICAN HERITAGE MONTH
  • I'D ALSO LIKE TO NOTE, AS PRESIDENT FELLEMAN DID IS THE THURSDAY WE WILL CELEBRATE VETERANS DAY, A DAY FOR US TO REMEMBER THOSE WHO HAVE SERVED IN THE US MILITARY AND TO EXPRESS OUR APPRECIATION TO THE MEN AND WOMEN SERVING AROUND THE WORLD TO PROTECT OUR NATION
  • OUR EMPLOYEE RESOURCE GROUP, MILITARY AND VETERANS AT THE PORT OR MVP, IS HOSTING A SPECIAL PROGRAM TOMORROW STARTING 11:00 A.M
  • WITH PRESENTATIONS ON THE HISTORY OF NATIVE AMERICANS IN THE MILITARY AS WELL AS THE PRESENTATION OF THE UNITED STATES UNITED INDIANS OF ALL TRIBES ON THEIR NATIVE VETERAN PROGRAM HERE IN SEATTLE
  • WE WILL ALSO WELCOME THIS YEAR'S VETERANS FELLOWS TO THE PORT OF PORT AS WELL
  • I WANT TO INVITE EVERYONE TO ATTEND THIS VIRTUAL EVENT IN ADDITION TO NATIVE AMERICAN HERITAGE LAUNCH IN VETERANS DAY, NOVEMBER IS ALSO ONE WE TYPICALLY AWARD THE CHARLES BLOOD CHAMPION OF DIVERSITY AWARD
  • THE COMMISSION ESTABLISHED THE CHARLES BLOOD CHAMPION OF DIVERSITY AWARD IN SEPTEMBER 2009 FOR A LEADER WHO HAS DEVOTED TO ISSUES OF INCLUSION THROUGHOUT HIS TENURE OF MORE THAN 30 YEARS WITH THE PORT
  • THE AWARD IS GIVEN ANNUALLY TO A CURRENT EMPLOYEE OR TEAM THAT EMBODIES THE PORT'S DIVERSITY COMMITMENTS AND VALUES
  • PLEASE JOIN ME IN CONGRATULATING THIS YEAR'S RECIPIENT OF THE CHARLES BLOOD CHAMPION OF DIVERSITY AWARD
  • DELMAS WHITTAKER, DIRECTOR OF MARINE MAINTENANCE
  • DELMAS HAS PROVIDED OUTSTANDING LEADERSHIP TO THE PORT THROUGH HIS EFFORTS AS CO CHAIR OF THE PORT OF SEATTLE POLICING ASSESSMENT AND AS CHAPTER PRESIDENT OF BLACKS AND GOVERNMENT
  • DELMAS HAS BEEN AN ADVOCATE FOR CHANGE THROUGHOUT THE PORT AND MAKES ANTI RACIST WORK AN INTEGRAL PART OF HIS TEAM'S OBJECTIVES
  • DELMAS HAS SERVED THE PORT OF SEATTLE FOR 13 YEARS, WORKING AT SEATTLE TACOMA INTERNATIONAL AIRPORT AS LOGISTICS MANAGER FOR AVIATION MAINTENANCE AND THEN SENIOR MANAGER OF FISHING AND COMMERCIAL VESSELS
  • BEFORE HIS PROMOTION TO THE DIRECTOR OF MARINE MAINTENANCE IN AUGUST
  • THE AWARD HONORS EMPLOYEES WHO TAKE THE INITIATIVE TO MAKE SIGNIFICANT CONTRIBUTIONS TO THE PORT'S EFFORTS TO FURTHER DIVERSITY AND INCLUSION AMONG ITS STAFF, ITS CUSTOMERS, AND THE SURROUNDING COMMUNITY
  • DELMAS CERTAINLY EMBODIES THOSE QUALITIES
  • I'VE COME TO KNOW DELMAS IS A STRONG AND INCLUSIVE LEADER COMMITTED TO MOVING THE PORT FORWARD
  • CONGRATULATIONS TO DALMAS
  • WHILE WE ARE ON THE SUBJECT OF AWARDS, I LIKE TO HIGHLIGHT TWO AWARDS RECENTLY RECEIVED BY SEATTLE TACOMA INTERNATIONAL AIRPORT
  • THE NORTH SATELLITE MODERNIZATION PROJECT JUST RECEIVED THE DISTINGUISHED PROJECT AWARD FROM THE NORTHWEST CONSTRUCTION CONSUMER COUNCIL FOR PUBLIC PROJECTS OVER $10 MILLION
  • THE AWARD RECOGNIZES EXCELLENCE IN ENGINEERING, DESIGN AND CONSTRUCTION OF PROJECTS
  • DURING THE PRIOR TWO YEARS
  • PROJECT MANAGERS WERE HIGHLIGHTED FOR THE SUSTAINABLE BUILDING SOLUTIONS INCORPORATED THROUGHOUT AND ON TRACK TO RECEIVE A LEAD SILVER CERTIFICATION FROM THE US GREEN BUILDING COUNCIL
  • AND JUST YESTERDAY, THE SEA SPOT SAVER PROGRAM ALSO RECEIVED AN AWARD FOR THE AIRPORTS COUNCIL INTERNATIONAL NORTH AMERICA FOR EXCELLENCE IN AIRPORT MARKETING, COMMUNICATIONS AND CUSTOMER EXPERIENCE
  • SEA WON UNDER THE CATEGORY OF CONSUMER EXPERIENCE, TECHNOLOGY INNOVATION
  • THESE AWARDS ARE PRIME EXAMPLES OF HOW OUR AMAZING TEAM AT SEA IS COMMITTED TO ELEVATING THE CUSTOMER EXPERIENCE EVERY DAY
  • CONGRATULATIONS TO THE TEAMS BEHIND BOTH PROJECTS AND THE MANAGING DIRECTOR OF LANCELOT
  • NOW, AS I MENTIONED IN MY REPORT TO YOU AT THE LAST COMMISSION MEETING, I LIKE TO PROVIDE AN UPDATE ON THE ORDER YOU PASSED ON SEPTEMBER 14, REQUIRING AN INVENTORY OF EXISTING CONDITIONS WITHIN 55 ACRE PARCEL WITHIN THE NORTH SEATAC PARK
  • THE ORDER DIRECTED ME TO REPORT BACK TO YOU WITH A WORK PROGRAM TIMELINE AND COST ESTIMATE
  • AFTER REVIEWING THE PRELIMINARY WORK PLAN, I TOOK ADDITIONAL TIME TO ENSURE THE WORK PLAN MEETS YOUR OBJECTIVES
  • SINCE THEN, I'VE TOURED THE SITE AND HELD DISCUSSIONS WITH STAFF TO FURTHER DEVELOP THE APPROACH
  • I HAVE NOW REVIEWED A REVISED WORK PLAN AND SUBMITTED IT TO YOU LAST WEEK
  • I'M PLEASED TO REPORT TO YOU THAT I'M RECOMMENDING THAT THE WORK BEGAN
  • THE WORK PLAN INCLUDES CONSULTANT REVIEW OF THE EXTENSIVE STUDIES AND DATA ALREADY AVAILABLE FOR THE SITE COLLECTION AND REVIEW OF INFORMATION FROM THE CITY OF SEATAC STAFF AND FIELDWORK TO VERIFY CONDITIONS AND IDENTIFY IMPORTANT SITE FEATURES IN A GAP ANALYSIS TO DETERMINE WHETHER ANY OF THE INFORMATION IS INCOMPLETE
  • IF THERE ARE GAPS, THE CONSULTANT WOULD RECOMMEND THE APPROPRIATE STUDIES AND TIME FOR DOING THAT ADDITIONAL WORK
  • ASSUMING WE CAN BEGIN THE INVENTORY BY MID DECEMBER, WE ESTIMATE COMPLETING IT BY END OF MARCH FOR A TOTAL COST OF APPROXIMATELY $84,000 AS REQUIRED BY THE ORDER
  • NO DECISION REGARDING FUTURE USE OF THE SITE WOULD BE MADE BEFORE THIS WORK IS COMPLETE
  • TURNING YOUR ATTENTION TO THE COVID PANDEMIC, THE DISEASE THAT CONTINUES TO POSE A SERIOUS HEALTH THREAT TO THE PORT IN THE COMMUNITY
  • I'D LIKE TO PROVIDE YOU AN UPDATE ON PROGRESS TOWARD VALIDATION OF THE PORT OF SEATTLE EMPLOYEES VACCINATIONS
  • LET ME SAY I APPRECIATE THE COMMISSION'S CONTINUED SUPPORT FOR OUR EFFORT TO PROTECT THE HEALTH AND SAFETY SAFETY OF OUR WORKFORCE AND THE COMMUNITY
  • I WAS PLEASED TO SEE THAT THE NORTHWEST SEAPORT ALLIANCE MANAGING MEMBERS APPROVED THE VACCINE REQUIREMENT LAST WEEK
  • LATER TODAY YOU WILL CONSIDER AN ACTION ENDORSING THE REQUIREMENT THAT EMPLOYEES BE FULLY VACCINATED AS A CONDITION OF EMPLOYMENT BY NOVEMBER 15
  • AS OF TODAY, 86% OF POOR EMPLOYEES HAVE SUBMITTED VACCINATION VALIDATIONS, THANKS TO THOSE EMPLOYEES FOR TAKING THAT IMPORTANT STEP TO PROTECT THEMSELVES, THEIR FAMILIES, AND THE COMMUNITY
  • A NUMBER OF EMPLOYEES HAVE BEEN GRANTED AN EXTENSION DUE TO SPECIAL CIRCUMSTANCES, BUT THEY CANNOT RETURN TO WORK UNTIL THEY ARE FULLY VACCINATED
  • AS YOU'RE AWARE, PRESIDENT BIDEN HAS ISSUED AN ORDER THROUGH THE OCCUPATIONAL HEALTH AND SAFETY ADMINISTRATION THAT ALL EMPLOYERS WITH 100 OR MORE WORKERS BE REQUIRED TO BECOME VACCINATED OR BE TESTED WEEKLY
  • SEPARATELY, THE GOVERNMENT HAS ISSUED A DIRECTIVE THAT EMPLOYEES OF FEDERAL CONTRACTORS, INCLUDING THE PORT OF SEATTLE, MUST ALSO BE VACCINATED
  • THERE IS NO TESTING OPTION
  • IN THIS CASE
  • A LOT OF WORK IS UNDER WAY BY OUR STAFF TO CONSIDER HOW TO APPLY VACCINE REQUIREMENTS TO CONSULTANTS, CONTRACTORS AND OTHERS WHO WORK ON PORT PROPERTY, OFTEN ALONGSIDE POOR EMPLOYEES
  • WE'LL HAVE MORE TO REPORT ON IN THE COMING WEEKS
  • DESPITE PROGRESS COVID 19 AND ITS IMPACTS HAVE NOT GONE AWAY
  • THE RATE OF NEW CASES HAS SLOWED SOMEWHAT, BUT THE NUMBER WILL REMAIN STUBBORNLY HIGH AS DUE HOSPITALIZATIONS
  • THIS RELATES DIRECTLY TO THOSE WHO ARE NOT VACCINATED
  • FOR THESE PEOPLE, THE RISK OF SERIOUS ILLNESS AND DEATH IS VERY HIGH
  • PLEASE GET VACCINATED IF YOU HAVE NOT DONE SO ALREADY, I WANT YOU TO KNOW THAT OUR EMPLOYEES ARE PULLING TOGETHER TO MEET THIS CHALLENGE AND KEEPING OUR WORKFORCE SAFE AND HEALTHY WHILE DELIVERING THE CENTRAL SERVICES OF THE PORT
  • ON A POSITIVE NOTE, THERE IS A LOT OF JOY IN CANADA, MEXICO, AND COUNTRIES AROUND THE WORLD, WITH A LIFTING OF RESTRICTIONS ON TRAVEL TO THE UNITED STATES FOR VACCINATED VISITORS
  • NEW REPORTS SHOW AIRCRAFT FILLED WITH HAPPY TRAVELERS
  • NEWS REPORTS THAT IS, HUNDREDS OF PEOPLE WERE ON HAND IN VICTORIA, BC, YESTERDAY MORNING FOR THE DEPARTURE OF THE FERRY COHO FOR ITS FIRST TRIP TO THE US IN 20 MONTHS
  • THIS IS OBVIOUSLY WELCOMED BY COMMUNITIES HERE IN WASHINGTON AND THROUGHOUT THE NATION
  • LOVED ONES WHO HAVE BEEN SEPARATED FOR NEARLY TWO YEARS CAN BE UNITED AGAIN, AND WE LOOK FORWARD TO AN ECONOMIC BOOST AS TRAVELERS RESTORED
  • THIS SHOWS THAT THE PATH TO RECOVERY DEPENDS ON EVERYONE GETTING VACCINATED
  • ANOTHER NEWS COMING OUT OF WASHINGTON, DC, THIS PAST FRIDAY EVENING, THE COMMISSIONER FELLEMAN TALKED ABOUT THE US HOUSE OF REPRESENTATIVE PAST HISTORIC BIPARTISAN INFRASTRUCTURE LEGISLATION AND SENT IT TO PRESIDENT BIDEN FOR A SIGNATURE
  • THE $1.2 TRILLION INVESTMENT
  • THIS $1.2 TRILLION INVESTMENT WILL HAVE TRANSFORMATIVE IMPACTS THROUGHOUT OUR REGION, STATE, AND THE COUNTRY
  • AND I WANT TO THANK THE WASHINGTON CONGRESSIONAL DELEGATION WHO PLAYED PIVOTAL ROLES IN ENSURING THE SUCCESSFUL PASSAGE OF THIS BILL
  • IN PARTICULAR, THE LEGISLATION INVESTS $20 BILLION IN AIRPORTS AND 17 BILLION IN MARITIME, A SIGNIFICANT PORTION OF WHICH THE PORT OF SEATTLE AND THE NORTHWEST SEAPORT ALLIANCE AND OUR PARTNERS WILL HAVE THE OPPORTUNITY TO RECEIVE
  • SEA ALONE IS SLATED FOR APPROXIMATELY 240,000,000 IN DIRECT ALLOCATION BY FORMULA NOT INCLUDING THE OPPORTUNITY TO APPLY FOR COMPETITIVE GRANTS
  • PORT STAFF WILL BE GETTING TO WORK RIGHT AWAY TO IDENTIFY WHICH AVIATION AND MARITIME PROJECTS TO PRIORITIZE FOR FUNDING AND GRANT APPLICATIONS, AND WE LOOK FORWARD TO PROVIDING ADDITIONAL UPDATES TO THE COMMISSION ON THESE EFFORTS IN THE COMING MONTHS
  • FINALLY, I WANT TO ACKNOWLEDGE THAT THE INFRASTRUCTURE AND LEGISLATION IS ONLY HALF OF THE PRESIDENT'S BUILD BACK BETTER AGENDA, AND THE PORT STANDS STRONGLY IN SUPPORT OF CONGRESSIONAL PASSAGE OF THE GENERATIONAL INVESTMENTS IN CHILDCARE EDUCATION, HEALTH CARE, IMMIGRATION AND CLIMATE THAT ARE CURRENTLY BEING DEBATED
  • IN PARTICULAR, WE WOULD BENEFIT SIGNIFICANTLY FROM SUSTAINABLE AVIATION FUELS AND MARITIME DECARBONISATION PROVISIONS OF THE BUILD BACK BETTER ACT, AND SO WE LOOK FORWARD TO ADDITIONAL PROGRESS ON THE BILL IN COMING WEEKS
  • MOVING TO TODAY'S COMMISSION MEETING, I'D LIKE TO HIGHLIGHT JUST A FEW ITEMS ITEM EIGHT E IS AN AUTHORIZATION FOR THE EMERGENCY PREPAREDNESS EXERCISE SUPPORT AT SEA
  • AS PART OF MY STATED EMPHASIS ON ENHANCING PREPAREDNESS AND RESILIENCE, WE'RE LOOKING AT IT TO INCREASE SEA'S AIRPORT'S COMPREHENSIVE EXERCISE PROGRAM FOR ONCE EVERY THREE YEARS IS REQUIRED TO THE FAA TO ANNUAL EXERCISE PROGRAM
  • UTILIZING CONTRACTOR SUPPORT
  • THIS FIVE YEAR CONTRACT FOR EXERCISE SUPPORT WILL EXPAND THE AREAS OF EXERCISE FOCUS AND VALIDATE THE FUNCTIONALITY AND EFFECTIVENESS, EMERGENCY PLANS, PROCEDURES AND MULTI AGENCY COORDINATION
  • ITEMS ON OUR AGENDA IS THE ANNUAL AUTHORIZATION ON OUR SALARY AND BENEFITS RESOLUTION, AND THE PORT IS COMMITTED TO PROVIDING COMPETITIVE WAGES AND BENEFITS THAT ARE BETTER THAN MARKET
  • ITEM EIGHT K IS AUTHORIZATION FOR AN IRREGULAR BID FOR THE BUILDING CONTROLS UPGRADE PROJECT
  • THIS PROJECT, WHO SELECTED BID CAME IN UNDER ESTIMATES, WILL REPLACE APPROXIMATELY 100 OBSOLETE BUILDING CONTROL PANELS
  • IT WILL ADD ENVIRONMENTAL FEATURES TO THE BUILDING CONTROL SYSTEM THAT REGULATES AND CONTROLS CRITICAL FEATURES SUCH AS TEMPERATURE, HUMIDITY AND AIR EXCHANGES
  • ITEM EIGHT M ON THE CONSENT AGENDA IS AN ACTION ITEM RELATED TO THE SOUTH KING COUNTY FUND
  • MULTI YEAR FUNDING WAS OFFERED FOR THE FIRST TIME UNDER THIS FUND IN 2021
  • DUAL COMBINATION OF INCREASED NEED DUE TO THE COVID PANDEMIC ENHANCED OUTREACH OVER THE LAST TWO YEARS, ESPECIALLY THROUGH THE PORTS COMMUNITY LIAISONS
  • THE PORT SAW A SIGNIFICANT INCREASE IN THE NUMBER OF ORGANIZATIONS APPLYING FOR SEVERAL OF THEM REQUESTING MULTI YEAR FUNDING FOR SEVERAL MULTI PHASE AND THOUGHTFUL PROJECTS
  • FUNDS FOR THIS PROGRAM HAVE BEEN USED FOR INITIATIVES INCLUDING, BUT NOT LIMITED TO, ENVIRONMENTAL PROJECTS, SMALL BUSINESS ASSISTANCE, ECONOMIC DEVELOPMENT, WORKFORCE DEVELOPMENT, JOB CREATION, AND MANY MORE
  • AND FINALLY, WE'LL HEAR TODAY THE INTRODUCTION OF PROPOSED 2022 BUDGET AND TAX LEVY INCREASE
  • I HAVE MORE TO SAY ON THOSE ITEMS DURING THEIR INTRODUCTIONS
  • COMMISSIONERS, THIS CONCLUDES MY REMARKS AND THANK YOU FOR THE EXTENDED TIME
  • THANK YOU
  • THANK YOU
  • EXECUTIVE METRUCK WE'LL NOW MOVE ON TO ITEM SIX COMMITTEE REPORT
  • ARE THERE ANY COMMITTEE REPORTS, MR PRINCE? THANK YOU, COMMISSION PRESIDENT FELLEMAN
  • THERE'S NO COMMITTEE REPORT OUT SINCE THE LAST COMMITTEE COMMISSION MEETING
  • HOWEVER, THE NEXT COMMITTEE MEETING IS THE AVIATION COMMITTEE ON NOVEMBER 11, WHERE THEY WILL REVIEW THE AIRPORT DINING AND RETAIL MASTER PLAN, WHICH WE ARE ALSO CONSIDERING FOR EITHER COMMISSION RETREAT OR BRIEFINGS IN JANUARY
  • THANK YOU
  • MY REPORT
  • THANK YOU FOR YOUR BREVITY
  • ARE THERE ANY FOLLOW UP QUESTIONS FOR AARON'S BRIEF REPORT OR ANYTHING ELSE TO DO WITH COMMITTEES? I DO NOT CURRENTLY SEE ANY HANDS RAISED
  • MR COMMISSION PRESIDENT
  • VERY GOOD
  • THEN WE'LL MOVE ON TO ITEM SEVEN PUBLIC COMMENT THE COMMISSION WILL NOW RECEIVE GENERAL PUBLIC COMMENT FROM THOSE WHO HAVE SIGNED UP TO SPEAK ON ITEMS RELATED TO THE PORT
  • FOLLOWING THIS GENERAL PUBLIC COMMENT SECTION, WE WILL BE SEPARATELY HOLDING A PUBLIC HEARING ON THE 2022 BUDGET AND TAX LEVY
  • THIS GENERAL PUBLIC COMMENT IS FOR TOPICS RELATED TO POOR BUSINESS THAT ARE NOT THE 2022 BUDGET OR TAX LEVY
  • THE CLERK HAS A SEPARATE SIGN IN SHEET TO TAKE THOSE COMMENTS FOR THAT LATER PUBLIC HEARING
  • WRITTEN MATERIALS PROVIDED TO THE CLERK WILL BE INCLUDED IN TODAY'S MEETING RECORD
  • THE CLERK HAS A LIST OF THOSE PREPARED TO SPEAK
  • AS THE CLERK CALLS
  • YOUR NAME WILL OPEN THE LINE AND COMMENT IS WE'LL HAVE TO UNMUTE THEMSELVES
  • THEN PLEASE REPEAT YOUR NAME FOR THE RECORD
  • IF YOU ARE ON TEAMS MEETING AND ARE ALSO STREAMING THE MEETING, PLEASE MUTE THE VIDEO STREAM TO AVOID FEEDBACK, PLEASE NOTE THERE MAY BE A SHORT TIME ON THE VIDEO STREAM
  • COMMENT TIME WILL BE LIMITED TO TWO MINUTES PER PERSON
  • CLERK HART, PLEASE CALL THE FIRST SPEAKER
  • THANK YOU
  • WE HAVE ONE SPEAKER SIGNED UP TODAY AND THAT IS MR JORDAN VANVOST
  • GOOD AFTERNOON
  • COMMISSIONER IS AN EXECUTIVE DIRECTOR
  • METRUCK
  • MY NAME IS JORDAN VAN VOST
  • THANK YOU FOR YOUR GOOD WORDS RECOGNIZING NATIVE AMERICAN HERITAGE MONTH
  • NEXT, I WANT TO CONGRATULATE THE NEWLY ELECTED COMMISSIONERS AND THANK COMMISSIONERS STEINBRUECK AND BOWMAN FOR YOUR PUBLIC SERVICE
  • I REALIZED THAT YOUR JOBS AREN'T EASY
  • I BELIEVE THAT ALL OF US ARE MOTIVATED BY THE SAME GOAL TO LEAVE A BETTER WORLD FOR OUR CHILDREN, STOP THE DESTRUCTION OF NATURE AND FIND A LASTING PEACE AND HAPPINESS
  • IT'S NOT EASY TO CHANGE HABITUAL WAYS OF DOING THINGS, BUT I ASK IN ALL SINCERITY WHAT IS IT GOING TO BE REQUIRED BEFORE YOU ADMIT THAT PLANNING FOR MORE CRUISE PASSENGERS AND MORE AIR TRAVEL IN 2022 IS NOT COMPATIBLE WITH LIMITING CLIMATE WARMING TO 1.5 DEGREES CELSIUS
  • ACCOUNTING TRICKS LIKE IGNORING SCOPE THREE EMISSIONS IN CLIMATE TARGETS OR RELYING UPON NOT YET INVENTED TECHNOLOGIES DO NOT ALLOW US TO ESCAPE THE REALITY THAT INCREASING EMISSIONS NOW ONLY DELAYS A MORE PAINFUL RECKONING OUR CHILDREN WILL HAVE TO FACE
  • SADLY, FOSSIL FUEL COMPANIES HAVE SENT MORE THAN 500 LOBBYISTS TO COP 26 MORE THAN ANY SINGLE COUNTRY WE CAN'T WAIT FOR WORLD LEADERS
  • IT'S UP TO US
  • AND TO YOU, I CLAIM NO MORAL HIGH GROUND HERE OR SPECIAL CREDENTIALS THAT MIGHT COMPEL YOU TO LISTEN TO ME
  • I DRIVE A CAR A FEW TIMES A WEEK AND BUY STUFF ON AMAZON, BUT I AM TRYING TO BE HONEST ABOUT MY IMPACT AND DO WHAT I CAN TO LIVE SIMPLY SO THAT OTHERS MAY SIMPLY LIVE
  • INDIVIDUAL CHANGE IS IMPORTANT, BUT WE CANNOT HOPE TO AVERT CLIMATE CATASTROPHE WITHOUT INSTITUTIONAL CHANGE AS WELL
  • YOUR INFLUENCE AS COMMISSIONERS AND SENIOR STAFF MEMBERS OF THE PORT HAS A HUGE INFLUENCE ON POLICY AND WITH IT A MORAL RESPONSIBILITY
  • MAY OUR CHILDREN INHERIT A LIVABLE WORLD? THANK YOU
  • THANK YOU
  • JORDAN
  • CLERK HART, IF THERE'S NO FURTHER PUBLIC COMMENTS, COULD WE HEAR THE SYNOPSIS OF THE WRITTEN ONE? YES
  • THANK YOU
  • GOOD AFTERNOON
  • MEMBERS OF THE COMMISSION
  • MR EXECUTIVE DIRECTOR, WE HAVE RECEIVED FIVE WRITTEN COMMENTS FOR TODAY'S MEETING
  • THE FIRST COMES FROM BRETT FULKINS
  • HE WRITES TO URGE A NO VOTE ON AGENDA ITEM NINE B STATING THAT WIDENING THE ARRIVALS ACCESS ROADWAY WILL INDUCE DEMAND FOR MORE LOW EFFICIENCY PRIVATE VEHICLES AND INCREASE THE TOTAL CARBON EMISSIONS OF THE ACTIVITY OF THE PORT
  • LAURA GIBBONS RIGHTS TO EXPLAIN THE MATH BY WHICH USING 10% SUSTAINABLE AVIATION FUEL RESULTS IN AT THE MOST AND 8% REDUCTION IN CARBON EMISSIONS
  • L HUGHES WRITES AN OPPOSITION TO AGENDA ITEM EIGHT L STATING CONCERNS FOR LOSS OF GREEN SPACE, LOSS OF PARKING AND CONSTRUCTION IMPACTS POSED TO LIVE ABOARDS IN THE AREA
  • CHAD NEWTON WRITES AN OPPOSITION TO AGENDA ITEM NINE B ASKING THE PORT TO VOTE AGAINST THE ITEM AND TO CANCEL THE WIDENING ARRIVALS ROADWAY PROJECT DUE TO THE DEMAND FOR PRIVATE VEHICLES TO TRAVEL TO THE AIRPORT THAT THE PROJECT WILL INDUCE
  • AND FINALLY, LEE NEMON WRITES AN OPPOSITION TO AGENDA ITEM EIGHT L, NOTING CONCERNS FOR LOSS OF GREEN SPACE AND PARKING, STATING THAT ANOTHER RESTAURANT AND BAR IS A NEGATIVITY FOR THE COMMUNITY, NOT A BENEFIT
  • AND THAT CONCLUDES THE WRITTEN COMMENTS THAT WE'VE RECEIVED TODAY
  • THANK YOU, CLERK HART
  • UNLESS ANYBODY ELSE IS ASKED TO MAKE PUBLIC COMMENT, WE'LL MOVE ON TO ITEM TEN, NEW BUSINESS AND THE PUBLIC HEARING HEARING NO FOR THE GENERAL PUBLIC
  • SO THIS IS THE PUBLIC HEARING FOR INTRODUCTION OF RESOLUTION NUMBER 37, 93 AND 37 94, THE 2022 PORT OF SEATTLE BUDGET AND REGULAR PROPERTY LEVY
  • FOR THE SAKE OF PROCESS FOR THESE ITEMS, I'D LIKE TO EVERYONE TO KNOW HOW WE'RE GOING TO DO THIS
  • FIRST, WE'LL HEAR THE STAFF PRESENTATION ON THESE RESOLUTIONS
  • WE'LL THEN OPEN THE PUBLIC HEARING AND TAKE TESTIMONY FROM THOSE WHO HAVE SIGNED UP TO SPEAK
  • WE WILL CONSOLIDATE THE HEARINGS AND TAKE TESTIMONY FROM BOTH TEN A AND TEN B AT THE SAME TIME
  • WE WILL THEN CONSIDER AND VOTE ON THE INTRODUCTION OF THE ITEMS SEPARATELY
  • AFTER HEARING COMMISSIONER COMMENTS, QUESTIONS AND DISCUSSION
  • CLERK HART, PLEASE READ THE RESOLUTION TITLES INTO THE RECORD
  • WE'LL THEN HEAR FROM EXECUTIVE METRUCK TO INTRODUCE BOTH ITEMS AT THIS TIME
  • THANK YOU, MR COMMISSION PRESIDENT
  • WE'LL BEGIN WITH ITEM TEN A, INTRODUCTION OF RESOLUTION NUMBER 3793, A RESOLUTION ADOPTING THE FINAL BUDGET OF THE PORT OF SEATTLE FOR THE YEAR 2022, MAKING DETERMINING AND DECIDING THE AMOUNT OF TAXES TO BE LEVIED UPON THE CURRENT ASSESSMENT ROLE, PROVIDING PAYMENT OF BOND REDEMPTIONS AND INTEREST, COST OF FUTURE CAPITAL IMPROVEMENTS AND ACQUISITIONS, AND FOR SUCH GENERAL PURPOSES ALLOWED BY LAW WHICH THE PORT DEEMS NECESSARY
  • AND DIRECTING
  • THE KING COUNTY COUNCIL ASKED THE SPECIFIC STEPS TO BE LEVIED ON ALL OF THE ASSESSED PROPERTIES OF THE PORT OF SEATTLE DISTRICT IN THE YEAR 2022
  • ITEM TEN B IS INTRODUCTION OF RESOLUTION NUMBER 3794, A RESOLUTION SPECIFYING THE DOLLAR AND PERCENTAGE CHANGE IN THE REGULAR PROPERTY LEVY FROM THE PREVIOUS YEAR PER RCW 84 55 120, PROVIDING FOR A 3% INCREASE OF THE LEVY FROM $78,676,$344 TO $81,036,634
  • VERY GOOD
  • THANK YOU, CLERK HART, COMMISSIONERS, I'M PLEASED TO INTRODUCE THE PORT OF SEATTLE BUDGET PLAN, A FINANCE AND TAX LEVY RECOMMENDATIONS FOR 2022
  • BEFORE I TURN THE PRESENTATION OVER TO DAN THOMAS AND OUR FINANCE TEAM, I WANT TO THANK THE COMMISSION FOR YOUR STRONG POLICY DIRECTION AND ENGAGEMENT
  • OVER THREE QUARTERS OF THE YEAR
  • YOU'VE CONTRIBUTED SIGNIFICANTLY TO THE DEVELOPMENT OF THIS BUDGET WITH A LOT OF FEEDBACK AND INPUT DURING THE PROCESS
  • YOU DID, AS YOU HAVE ALL SAID SEVERAL TIMES, THE BUDGET IS AN EXPRESSION OF OUR VALUES
  • IT SHOWS HOW WE WILL DELIVER ON OUR MISSION TO THE COMMUNITY AND BUILD A STRONGER, MORE EQUITABLE AND MORE SUSTAINABLE ECONOMY
  • I'M PROUD TO SAY WE WILL MAKE REAL PROGRESS ON ALL THOSE VALUES IN THE COMING YEAR
  • OF COURSE, THIS BUDGET WAS DEVELOPED AGAINST THE BACKDROP OF THE CONTINUING COVID-19, THE PANDEMIC AND THE ASSOCIATED CHALLENGES AND UNCERTAINTY
  • WITH THE COMMISSION'S STRONG BACKING, I'M ESPECIALLY PROUD THAT WE CARRY THROUGH ON OUR COMMITMENT TO PROTECT THE HEALTH AND SAFETY OF OUR EMPLOYEES, TENANTS, CONTRACTORS, AND THE PUBLIC
  • THIS YEAR WE WELCOME MORE PARTICIPATION OF THE COMMUNITY IN BUILDING THE BUDGET AS WELL
  • THE COMMISSION HELD A SERIES OF LISTENING SESSIONS INVOLVING MORE THAN 100 STAKEHOLDERS TO IDENTIFY KEY ISSUES, AND WE'VE HEARD STRONG SUPPORT FOR CONTINUED COMMUNITY INVESTMENTS THAT'S REFLECTED IN THE BUDGET
  • WE'VE ALSO BROUGHT OUR BUDGET PROPOSALS TO THE COMMUNITY INTO VIRTUAL SESSIONS, WHICH HAD LARGER PARTICIPATION THAN WE'VE HAD IN PERSON ONES BEFORE
  • OUR BUDGET PICTURE HAS IMPROVED OVER 2020 AND WE HAVE APPROACHED 2022 OVER 2000 AND 22,021, AND WE'VE APPROACHED 2022 WITH A STRONG BALANCE SHEET
  • AIR TRAVEL IS REBALANCED SIGNIFICANTLY AND WE EXPECT ANOTHER 35% INCREASE INCREASE
  • MOVING FORWARD, AS I MENTIONED EARLIER, WE ARE STEPPING UP OUR CRITICAL CAPITAL IMPROVEMENTS IN AVIATION, MARINE ECONOMIC DEVELOPMENT, CENTRAL SERVICES DIVISIONS
  • OVER THE NEXT FIVE YEARS, WE WILL INVEST RECORD AMOUNTS IN THOSE PROJECTS MORE THAN $4 BILLION
  • NOT ONLY DO THOSE PROJECTS SUPPORT EXPANSION OF TRADE, TRAVEL AND COMMERCE, THEY CREATE THOUSANDS OF JOBS HERE IN OUR COMMUNITY AND AS PART OF OUR DIVERSITY AND CONTRACTING INITIATIVES, WE'RE DOING MORE TO ENSURE THOSE CONTRACTS AND JOBS ARE SHARED MORE EQUITABLY IN OUR COMMUNITY
  • FOLLOWING THE ACTION ON THE BUDGET, WE WILL TRANSITION TO A DISCUSSION OF OUR PROPOSED TAX LEVY FOR NEXT YEAR
  • WE ARE CAREFUL STEWARDS OF THE PUBLIC'S TAX DOLLARS PRIORITIZING IMPORTANT PROJECTS SUCH AS MARITIME INFRASTRUCTURE, ENVIRONMENTAL IMPROVEMENTS, REGIONAL TRANSPORTATION, WORKFORCE DEVELOPMENT, TOURISM AND COMMUNITY PARTNERSHIPS
  • I'M PROPOSING A 3% TAX INCREASE IN THE LEVY FOR NEXT YEAR, WHICH WILL HELP US KEEP PACE WITH INFLATION
  • THAT IS REALLY DRIVING UP CONSTRUCTION COSTS FOR THE PORT
  • EVEN WITH THIS INCREASE, THE PROPERTY TAX BILL FOR THE AVERAGE HOMEOWNER IS FORECASTED TO STAY FLAT FOR NEXT YEAR AT $72
  • THAT IS VERY GOOD RETURN FOR THE ECONOMIC BENEFITS THAT SUPPORT GENERATES FOR THE COMMUNITY
  • I WILL NOW TURN THE PRESENTATION OVER TO DAN THOMAS, CHIEF FINANCIAL OFFICER
  • HE INTRODUCED THE PRESENTATION TEAM
  • THANKS VERY MUCH TO EVERYONE IN THE BUDGET AND FINANCE TEAMS FOR THE WORK IN PREPARING THIS BUDGET, SO I'LL TURN IT OVER TO OUR CHIEF FINANCIAL OFFICER
  • DAN THOMAS
  • THANK YOU, STEVE
  • AND GOOD AFTERNOON, COMMISSIONERS
  • IF WE COULD GET OUR SLIDE DECK PUT UP, PLEASE
  • AND PRIMARILY THE PRESENTERS WILL BE MYSELF AND MICHAEL TONG, ALTHOUGH WE DO HAVE OTHERS WHO ARE ONLINE IN CASE OTHER QUESTIONS COME UP
  • SO IF WE COULD PLEASE GO TO THE NEXT SLIDE
  • SO THIS IS JUST AN OUTLINE FOR TODAY'S PRESENTATION
  • WE'RE GOING TO TRY TO FLY FAIRLY HIGH TODAY, GIVEN THE TIME CONSTRAINTS AND THE FACT THAT THE COMMISSION HAS ALREADY BEEN BRIEFED ON MOST OF THE INFORMATION WE'LL BE PRESENTING TODAY, WE'RE GOING TO HIGHLIGHT SOME OF THE CHANGES
  • NEXT SLIDE, PLEASE
  • SO THIS SLIDE JUST RECAPS THE PROCESS WE WENT THROUGH THIS YEAR
  • STEVE TALKED ABOUT A NUMBER OF THESE
  • WE HAVE HAD A SERIES OF COMMISSION BUDGET RETREATS EARLIER IN THE YEAR, AS WELL AS PUBLIC BRIEFINGS HELP THROUGHOUT THE FALL
  • AND AS STEVE MENTIONED, WE DID HAVE TWO PUBLIC BUDGET OPEN HOUSES THAT WERE HELD VIRTUALLY LAST MONTH
  • NEXT SLIDE, PLEASE
  • SO STEVE MENTIONED BUSINESS ACTIVITIES ARE RECOVERING, BUT WE'RE NOT FULLY RECOVERED COMPARED TO PARTICULARLY 2019
  • AND WITH RESPECT TO THE AIRPORT, I APOLOGIZE
  • THE AIRPORT ACTIVITY INFORMATION IN THIS FIRST BULLET SOMEHOW GOT CONVOLUTED
  • SO PLEASE IGNORE THAT FIRST BULLET
  • THE ACTUAL NUMBERS ARE FOR 2021
  • WE'RE EXPECTING THAT EMPLOYMENTS WILL BE DOWN 30% COMPARED TO 2019 AND THEN FOR 2022
  • WE EXPECT EMPLOYMENT TO BE DOWN 6.2% COMPARED TO 2019, AND THAT'S A SLIGHT REDUCTION FROM THE FORECAST THAT WAS PRESENTED TO THE COMMISSION IN OCTOBER, WHICH HAD EMPLOYMENTS DOWN 5% NEXT YEAR COMPARED TO 2019
  • I APOLOGIZE FOR GETTING THOSE NUMBERS MESSED UP HERE
  • WE'RE ALSO EXPECTING STRONG RECOVERY AND CRUISE VOLUMES, BUT OUR FORECAST IS ALSO CONSERVATIVE
  • SO WE'RE TRYING TO TAKE INTO ACCOUNT THE FACT THAT THERE ARE CONTINUED RISKS OUT THERE AND THEN ALSO, MOST OF OUR OCCUPANCY RATES AT OUR FACILITIES ARE FORECAST TO BE STABLE NEXT YEAR
  • NEXT SLIDE, PLEASE
  • STEVE MENTIONED THE BUDGETED PAYROLL INCREASES
  • ALSO THIS YEAR WE ADDED 43 MIDYEAR HIRES AND WE'LL BE ADDING 164 COMBINED NEW AND UNFROZEN POSITIONS NEXT YEAR
  • SOME OF THE LARGEST NON-PAYROLL EXPENSE DRIVERS NEXT YEAR WILL BE NEW FACILITIES COMING ONLINE, NAMELY THE INTERNATIONAL ARRIVAL FACILITY AND THE NORTH SATELLITE, AS WELL AS THE AIRLINE REALIGNMENT, WHICH WILL OCCUR AT THE AIRPORT
  • AND ALSO I SHOULD NOTE THAT THE PAYROLL VACANCY FACTORY LISTED HERE SHOULD BE 5%, NOT 4%
  • I APOLOGIZE FOR THAT ERROR AS WELL
  • NEXT SLIDE, PLEASE
  • STEVE MENTIONED THE COMMUNITY AND SUSTAINABILITY INITIATIVES
  • THIS SLIDE JUST HIGHLIGHTS THE LARGE VARIETY OF PROGRAMS PROVIDED BY THE PORT
  • THE COMMISSION IS WELL AWARE OF ANY OF THESE PROGRAMS AND WE DO HAVE MORE INFORMATION ON THE ACTUAL BUDGET AND AMOUNTS FOR THESE PROGRAMS LATER IN THE PRESENTATION
  • SO I'M NOT GOING TO WALK THROUGH THEM ALL HERE ON THIS SLIDE
  • NEXT SLIDE, PLEASE
  • SO THIS SLIDE SUMMARIZES THE TOTAL PORT BUDGET AND JUST TO TALK ALSO ABOUT WHY WE'RE COMPARING AGAINST 2020 FOR 2022 BECAUSE THE 2022 BUDGET WAS THE LAST NORMAL BUDGET, SO THAT APPROVED BUDGET PROVIDES A BETTER COMPARISON
  • SO AS YOU CAN SEE, WE ARE BUDGETING $776,000,000 IN OPERATING REVENUES NEXT YEAR, $499,000,000 IN OPERATING EXPENSES AND NET OPERATING INCOME OF $268,000,000, WHICH WELL DOWN COMPARED TO 2020, IS ACTUALLY UP COMPARED TO 2021
  • AND WE'LL HAVE A LITTLE MORE INFORMATION LATER AS WE LOOK AT EACH DIVISION
  • BUT THE LARGEST FACTORS REALLY IN THE DROP IN OPERATING REVENUES FROM 2020 REFLECTS THE APPLICATION OF FEDERAL STIMULUS GRANTS TO PROVIDE RENT RELIEF BOTH TO OUR AIRLINE CUSTOMERS AND CONCESSIONNAIRES
  • SO THAT HAS THE EFFECT OF LOWERING REVENUES
  • AND OF COURSE, THE CORRESPONDING GRANTS ARE BOOKED AS NON OPERATING REVENUES
  • SO THERE'S A BIT OF A MISMATCH IN THE WAY WE PRESENT THE NUMBERS
  • ALSO, THERE'S A REDUCTION IN NON AERONAUTICAL REVENUES DUE TO THE LOWER EMPLOYMENT COMPARED TO 2020
  • JUST A NOTE, A NUMBER OF ITEMS THERE AT THE BOTTOM
  • WE ARE BUDGETING $560,000,000 IN CAPITAL SPENDING NEXT YEAR AND 4.4 BILLION IN CAPITAL SPENDING OVER THE NEXT FIVE YEARS
  • ALSO, AS STEVE MENTIONED, WE'RE PROPOSING A 3% INCREASE IN THE TAX LEVY FOR 2022
  • NEXT SLIDE, PLEASE
  • SO THIS SLIDE HIGHLIGHTS SOME CHANGES TO THE BUDGET THAT OCCURRED AFTER THE BRIEFINGS WITH THE COMMISSION, BUT BEFORE THE BUDGET DOCUMENT WAS PRODUCED, COMMISSION IS FAMILIAR WITH MANY OF THESE
  • THEY WERE DEVELOPED WITH INPUT AND DISCUSSION WITH THE COMMISSION AND EXECUTIVE
  • I JUST WANTED TO HIGHLIGHT A COUPLE OF ITEMS ONE IS THE OPPORTUNITY YOUTH INITIATIVE, WHICH IS LISTED HERE
  • THAT $1 MILLION THAT THE PORT WILL BE CONTRIBUTING IS GOING TO BE AUGMENTED BY AN EXPECTED $1 MILLION OF ADDITIONAL FUNDING FROM THE CITY OF SEATTLE
  • IT MIGHT ACTUALLY BE SLIGHTLY LESS THAN THAT THEY MAY WITHHOLD A SMALL AMOUNT FOR ADMINISTRATIVE EXPENSES
  • WE'RE STILL WORKING ON FINALIZING THAT AGREEMENT WITH THE CITY
  • SO AT THIS POINT IN THE BUDGET, THE CITY'S CONTRIBUTION HAS NOT BEEN FACTORED INTO OUR BUDGET, SO IT MAY BE SOMETHING THAT HAPPENS AFTER THE BUDGET IS FINALIZED
  • I JUST WANTED TO MENTION ALSO, THE FUNDING FOR THE AQUARIUM WILL BE USED TO DEVELOP SCOPE AND DESIGN FOR A NEW PERMANENT EXHIBIT AT THE NEW RENOVATED AND ENLARGED AQUARIUM, AND THAT EXHIBIT WILL HIGHLIGHT THE PORT'S ROLE IN IMPROVING THE ENVIRONMENT
  • AND THEN FINALLY, I JUST WANTED TO CALL OUT THAT THE OFFSHORE WIND STUDY MENTIONED HERE IS EXPECTED TO BE A PARTNERSHIP WITH THE PORT OF TACOMA CONTINGENT UPON MATCHING FUNDS PROVIDED BY THE PORT OF TACOMA
  • NEXT SLIDE, PLEASE
  • SO THIS SLIDE HIGHLIGHTS A NUMBER OF CHANGES THAT OCCURRED AFTER THE PRELIMINARY BUDGET WAS PUBLISHED, AND MANY OF THESE REFLECT MINOR REFINEMENTS, AS WELL AS SOME OF THE CHANGES WHICH I'LL HIGHLIGHT
  • THE MAJOR REVENUE CHANGE AFTER THE BUDGET DOCUMENT WAS PUBLISHED IS A REDUCTION IN AERONAUTICAL REVENUE, AND THAT IS DUE TO THE AIRPORT'S DECISION TO MOVE SOME OF THE FEDERAL RELIEF GRANTS FROM 2021 INTO 2022
  • AND THERE'S ALSO A SLIGHT REDUCTION IN NON AERONAUTICAL REVENUE DUE TO THE REVISED AND CLAIM AND FORECAST THAT I MENTIONED
  • I ALSO WANTED TO CALL OUT THAT THERE'S A $3 MILLION INCREASE IN CUSTOMER FACILITY CHARGES CFC'S REVENUE, WHICH WAS DUE TO A PLANNED INCREASE IN THE CFC RATE NEXT YEAR FROM $650 A DAY CURRENTLY BEING CHARGED TO $7 A DAY NEXT YEAR
  • AND THAT INCREASE WAS REVIEWED AND ENDORSED BY THE RENTAL CAR COMPANIES OPERATING AT SEATAC
  • NEXT SLIDE, PLEASE
  • SO SOME OTHER CHANGES, THERE'S BEEN SOME SLIGHT REDUCTIONS IN OPERATING EXPENSES, AND THEN ALSO WE SEE SOME INCREASES IN GRANT REVENUE, PRIMARILY TO MOVING THE STIMULUS GRANTS, AS I MENTIONED, FROM 2021 TO 2022, AS WELL AS SOME OTHER REFINEMENTS NUMBERS IN AIP GRANTS BEING INCREASED SLIGHTLY
  • NEXT SLIDE, PLEASE
  • SO IN THE OTHER DIVISIONS, REALLY, NO MAJOR CHANGES SINCE THE BUDGET WAS PUBLISHED, YOU CAN SEE THE NUMBERS HERE
  • AGAIN, THESE ARE ALL QUITE MINOR, SO I WON'T GO THROUGH THIS LINE BY LINE
  • NEXT SLIDE, PLEASE
  • SO THIS PROVIDES THE OPERATING BUDGET SUMMARY FOR AVIATION
  • AGAIN, I'M NOT GOING TO WALK THROUGH ALL THE NUMBERS
  • BUT AGAIN, TO REITERATE THAT THE REVENUE REDUCTIONS YOU'RE SEEING COMPARED TO 2020 ARE LARGELY DUE TO THE APPLICATION OF THE FEDERAL STIMULUS GRANTS, WHICH OBVIOUSLY REDUCE REVENUES FOR THE AIRLINES AND ALSO REDUCE EMPLOYMENT COMPARED TO 2020
  • NEXT SLIDE, PLEASE
  • SO THIS IS THE BUDGET SUMMARY FOR THE COMBINED NON AVIATION BUSINESS SEGMENTS
  • JUST LOOKING AT THE MARITIME REVENUE REDUCTION THAT'S LARGELY DUE TO LOWER CRUISE VOLUMES COMPARED TO 2020
  • AND AS YOU KNOW, YOU REVIEWED AND APPROVED THE NORTHWEST SEAPORT ALLIANCE BUDGET RECENTLY
  • SO WE'RE LOOKING AT A FAIRLY SUBSTANTIAL INCREASE IN NORTHWEST SEAPORT ALLIANCE DISTRIBUTABLE REVENUE OF ABOUT $7.5 MILLION
  • AND THAT'S LARGELY DUE TO THE FACT THAT TERMINAL FIVE WILL BE COMING ON NEXT YEAR WITH ADDITIONAL REVENUES AS WELL AS THE RECEIPT OF A NUMBER OF GRANTS THAT ARE BEING USED FOR THAT CONSTRUCTION PROJECT
  • NEXT SLIDE, PLEASE
  • SO AGAIN, THE COMMISSION IS QUITE AWARE OF THESE VARIOUS COMMUNITY AND SUSTAINABILITY INITIATIVES
  • WE'RE LOOKING AT SPENDING OVER $16 MILLION IN 2022, AND THAT'S UP FROM $14 MILLION THAT WAS BUDGETED THIS YEAR
  • AS YOU CAN SEE, ABOUT 60% OF THAT IS FUNDED BY THE TAX LEVY, BUT THAT DOES NOT INCLUDE ABOUT $483,000 OF PAYROLL COSTS BEING CHARGED TO THE LEVY FOR FOUR DEDICATED FTES THAT ARE DEDICATED TO SUPPORTING THESE INITIATIVES
  • AND THAT IS NEW FOR 2022
  • AS YOU CAN SEE ON THE RIGHT, A COUPLE OF THE NEW ADDITIONS
  • AGAIN, THE OPPORTUNITY YOUTH INITIATIVE, WHICH WAS ADDED IN 2022
  • BUT AGAIN, THIS DOES NOT INCLUDE THE EXPECTED CONTRIBUTION FROM THE CITY OF SEATTLE
  • AND I ALSO WANTED TO CALL OUT THAT THE TABLE FOR 2021 DOES NOT SHOW THE $2 MILLION THAT WAS FUNDED THIS YEAR BECAUSE THAT WAS NOT PART OF THE ORIGINAL BUDGET
  • IT WAS ADDED MID YEAR AS PART OF OUR ECONOMIC RECOVERY SPENDING
  • SO AGAIN, I'M NOT GOING TO WALK THROUGH ALL THESE ITEMS UNLESS COMMISSIONERS HAVE SPECIFIC QUESTIONS ON THIS, THEN I'M GOING TO TURN IT OVER TO MICHAEL TOM TO CONTINUE ON WITH SOME MORE OF THESE SLIDES
  • THANKS, DAN
  • GOOD AFTERNOON, COMMISSIONERS AND EXECUTIVE DOCTOR METRUCK
  • THIS IS THE PROPOSED COMPREHENSIVE BUDGET WHICH INCLUDES BOTH THE OPERATING AND NON OPERATING NUMBERS
  • THIS REALLY GIVES YOU A FULL VIEW OF THE COST FINANCIAL
  • THERE'S A NUMBER AND ALSO NUMBER HERE
  • SO I WOULD LIKE TO JUST HIGHLIGHT VIEW FOR YOU AS YOU CAN SEE THE EXPLANATIONS FOR ALL THE BUDGET CHANGES IN THE FAR RIGHT COLUMN ON BOARD NUMBER SIX UNDER REVENUE IS MORE CAPITAL GRANTS AND DONATIONS
  • WE EXPECT 127,000,000 OR JUST OVER 5000% INCREASE FROM THE 2020 BUDGET AND DUE TO FEDERAL GRANT DIMENSION A BIT EARLIER
  • AND BECAUSE OF THAT, THE TOTAL REVENUE FORECAST WILL BE 53 MILLION OR 4.9% HIGHER THAN THE 2020 BUDGET
  • OVERALL, THE PORT'S TOTAL REVENUE FOR NEXT YEAR IS 1.5 BILLION
  • TOTAL EXPENSES ARE BUDGETED AT 891,000,000, WHICH IS 43 MILLION OR 5.2% OVER THE 2020 BUDGET AND MAINLY DUE TO HIGHER OPERATING EXPENSES AND DEPRECIATION
  • MORE NEW ASSETS SUCH AS NORTH, SATELLITE AND IAF COME TO SURFACE
  • OVERALL, WE EXPECT PRETTY STRONG ITSELF FOR 2022
  • OUR BOTTOM LINE REVENUES OVER EXPENSES IS FORECAST TO BE 258,000,000 FOR 2022
  • IT'S ALMOST 10 MILLION OR 4% HIGHER THAN THE 2020 BUDGET
  • NEXT SLIDE, PLEASE
  • THIS IS THE PROPOSED FIVE YEAR CAPITAL IMPROVEMENT PLAN SUMMARY BY DIVISION
  • THEN WE OFFER SOME NUMBERS
  • SO BASICALLY FOR 2022 WE PLAN TO SPEND 559,000,000 AND 4.4 BILLION FOR THE NEXT FIVE YEARS
  • AND I WOULD ALSO LIKE TO NOTE THAT THIS NUMBER DOES NOT INCLUDE OUR SHARE OF THE FIVE YEAR CAPITAL PLAN FOR THE SEAPORT LINES THAT YOU APPROVED YESTERDAY, WHICH IS ANOTHER 275,000,000
  • NEXT SLIDE, PLEASE
  • THIS CHART SHOWS THE SOURCES OF FUND WHICH TOTAL TO BE OVER 1.8 BILLION FOR 2022
  • THE TWO BIGGEST SOURCES ARE OPERATING REVENUES AND BOND PERSIST
  • BOTH OF THEM ARE OVER 38% OF THE TOTAL
  • IT'S ALSO WORTH TO KNOW THAT THE TAX LEVEL MAKE UP JUST ABOUT 4.4% OF THE TOTAL FUNDING
  • NEXT SLIDE, PLEASE
  • WE ARE EXPECTING TO SPEND ABOUT 1.58 BILLION NEXT YEAR
  • CAPITAL EXPENDITURE IS THE LARGEST SPENDING CATEGORY AND IT TAKES UP TO ABOUT 35% OF THE TOTAL
  • UPSTATE EXPENSES COMES TO THE NEXT LARGEST CATEGORY WILL BE 31.6%, THE THIRD LARGEST SPENDING CATEGORY STEP SERVICES BETWEEN BOTH REDEMPTION AND INTEREST PAYMENTS
  • TOGETHER THEY REPRESENT ABOUT 27.5 OF THE TOTAL SPENDING NEXT YEAR
  • NEXT SLIDE, PLEASE
  • THIS IS THE FT SUMMARY FOR 2022
  • BEFORE WE GET INTO THE NUMBERS, I WOULD LIKE TO REMIND YOU THAT WE HAVE 157,000 FT IN THE 2021 BUDGET AND THEY ARE INCLUDED IN THE 2390.8 APPROVED FTE FOR 2021
  • BUT WE HAVE NO BUDGET FUNDING FOR THOSE POSITIONS
  • SO WHAT IT REALLY MEANS IS THAT A POSITION ENFORCEMENT
  • IT DIDN'T REALLY CHANGE THE FT COUNT IN THIS TABLE, BUT IT WILL HAVE AN IMPACT ON THE EXPENSE BUDGET
  • SO WITH THAT IN MIND, LET'S TAKE A LOOK AT THE PROPOSED FTES FOR 2022
  • WE HAVE 43 MEDIA APPROVAL SO FAR THIS YEAR
  • AFTER 43 FTES, 23 NEW AND 20 ARE PREVIOUSLY FOLKS AND POSITIONS FOR 2022, WE PLAN TO ELIMINATE 43.2 FTE AND MOST OF THEM ARE BOTH IN POSITION, SOME OF THOSE IN POSITION DIMENSION [inaudible 00:52:43] AND ALSO PROPOSED 164.4 FTE, WHICH INCLUDE 94 NEW FTE AND SENSITIVE POINT FOR PREVIOUS POSITION
  • SO OVERALL, WE ARE PROPOSING A TOTAL OF 2462.6 FTE FOR 2020
  • IT'S ALSO POSSIBLE TO POINT OUT THAT WE STILL HAVE A TOTAL OF 29.2 FTE REMAIN FOR UNFUNDED FOR 2022
  • BUDGET NEXT SLIDE, PLEASE MOVE ON TO TESLA DESCENDED THIS AND THE NEXT SLIDE TO YOU IN THE JOB PLAN OF FINANCE AND TEST LEVY BEEPING A COUPLE OF WEEKS AGO, SO I WON'T GO INTO MUCH DETAIL EXCEPT JUST A REMINDER OF THE HOW WE USE THE TAX LEVY HERE AT THE PORT AND YOU CAN SEE THE LIST HERE
  • I DON'T NEED TO GO INTO DETAIL FOR MOST PART INVESTMENT SECURE INFRASTRUCTURE AND FOR OUR METAL SUSTAINABILITY AND REGIONAL TRANSPORTATION AND NUMBER TWO COMPANY PROGRAM THAT DIMENSION A LITTLE BIT EARLIER, WE ARE PROPOSING A 3% LEAD INCREASE FROM 78.7 MILLION IN 2021 TO 81 MILLION IN 2022
  • BASICALLY JUST TO KEEP UP WITH THE INFLATION
  • IT'S ALSO IMPORTANT TO NOTE THAT WHILE THE COST INCREASE BY 3% IN 2022, BUT BECAUSE THE ASSESS VALUE INCREASE BY 9%, THEREFORE THE MILEAGE RATE ACTUALLY DECLINE
  • SO I WANT TO KNOW THAT THE AVERAGE HOME OR MEDIUM HOMEOWNER WITH MEDIUM HOME VALUE, THE ESTIMATED LEVY THAT THEY PAY TO THE PROPERTY REMAIN FED AT $72 IN 2022
  • NEXT SLIDE, PLEASE
  • THERE'S CHARGE SOCIAL AND MILITARY FROM 20 TO 22
  • AS YOU CAN SEE FROM THE CHART, THE PORT HAVE BEEN LOWERING THE LEFT SINCE 2009 FOR ABOUT TEN YEARS BEFORE STARTING 3% INCREASE FROM 2019 TO AGAIN BASICALLY KEEP UP WITH THE PURCHASING POWER WITH THE INFLATION OVER THE YEARS WITH INCREASE OF HOME VALUE DIVISION OVER THE YEARS, THE MILLAGE HAS BEEN DROPPING SINCE 2013
  • AS YOU CAN SEE FROM THE BLUE LINE HERE, THE DOLLAR TRENDS CONTINUE FROM $0.19 THIS YEAR TO $11.2
  • SO LET ME TURN IT BACK TO DAN FOR THE EQUITY BUDGETING
  • YEAH
  • THANK YOU, MICHAEL
  • SO WE WANTED TO BEGIN TO INCORPORATE EQUITY INTO OUR BUDGETING PROCESS THIS YEAR AND WE RECOGNIZE IT WAS GOING TO BE NEW AND DIFFERENT
  • SO WE AT LEAST WANTED TO TAKE SOME INITIAL STEPS AND RECOGNIZING THAT IT'S GOING TO BE A JOURNEY OVER TIME AS WE LEARN HOW TO INCORPORATE THAT MORE COMPREHENSIVELY INTO OUR BUDGETING PROCESS
  • BUT WE DID WORK
  • I JUST WANTED TO MENTION WE WORKED WITH THE OFFICE OF EQUITY DIVERSITY INCLUSION WITH BOOKDAS GROUP, AS WELL AS MEMBERS OF THE CHANGE TEAM, PARTICULARLY A SUBSET THAT WAS FOCUSED ON THIS EQUITY AND BUDGETING CONCEPT
  • SO AS PART OF THE PROCESS AND AS PART OF THE BUDGET SUBMITTALS, WE ASKED DEPARTMENTS TO ASK A NUMBER OF QUESTIONS
  • THEY WERE REALLY JUST DESIGNED TO BEGIN TO PROMPT SOME THINKING ABOUT THEIR BUDGETS FROM AN EQUITY PERSPECTIVE
  • AND SO DEPARTMENTS RESPONDED, WE GOT A LOT OF GREAT ANSWERS AND RESPONSES TO THOSE, AND I THINK JUST GENERALLY TO SUMMARIZE SOME OF THE RESULTS, WE LEARNED THAT MOST DEPARTMENTS HAVE AND CAN IDENTIFY AREAS WHERE THEY CAN ADVANCE EQUITY
  • OBVIOUSLY, A LOT IS GOING ON WITH IN TERMS OF DEPARTMENTS CONSIDERING WMBE FIRMS AND THEIR CONTRACTING PROCESSES
  • AND MOST DEPARTMENTS ARE REALLY INTERESTED IN LEARNING MORE ABOUT HOW THEY CAN LOOK AT THEIR BUDGET THROUGH AN EQUITY LENS
  • SOME OPPORTUNITIES WE IDENTIFIED WOULD BE TO BETTER IDENTIFY STAKEHOLDERS THAT ARE IMPACTED BY BUDGET DECISIONS
  • THAT'S A REALLY KEY ELEMENT OF EQUITY AND BUDGETING IS TO REALLY UNDERSTAND WHAT THE IMPACT OF YOUR SPENDING IS ON VARIOUS COMMUNITIES AND WHO MAY BE HURT AND WHO MAY BE HELPED OR HARMED BY YOUR BUDGETING DOLLARS AND ALSO TO BEGIN TO EXPAND OUR FOCUS ON COMMUNITIES AND STAKEHOLDERS BEYOND THE WMBES THAT CURRENTLY GET A LOT OF THE FOCUS
  • WE'VE ALSO DONE SOME OUTREACH AND HAVE GOTTEN SOME GREAT INFORMATION BENCHMARKING WITH OTHER GOVERNMENT ORGANIZATIONS, SOME OTHER CITIES WHO ARE MUCH FURTHER AHEAD OF US IN TERMS OF EQUITY AND BUDGETING, THE CITY OF SEATTLE, NAMELY, AS WELL AS EVEN SOME OTHER PORTS AND AIRPORTS
  • SO WE'VE BEGUN CONVERSATIONS WITH SOME OF THESE GROUPS TO CONTINUE TO REFINE THIS OVER TIME
  • SO WE'RE REALLY PLEASED WITH THE RESULTS OF JUST THIS INITIAL FORAY INTO THIS AREA
  • WE RECOGNIZE IT'S A FIRST STEP AND LOOKING FORWARD TO CONTINUE TO REFINE THIS AND HAVE EQUITY BE A MUCH MORE CENTRAL COMPONENT OF OUR BUDGETING PROCESS
  • SO I JUST WANTED TO SHARE THAT WITH THE COMMISSION NEXT SLIDE, PLEASE
  • SO FINALLY, JUST THE REMAINING SCHEDULE
  • WE'LL BE BACK AGAIN, HARD TO BELIEVE NEXT WEEK, NEXT TUESDAY FOR ADOPTION OF THE 2022 BUDGET
  • AND THEN WE'LL MOVE ON AND FILE THE BUDGET WITH KING COUNTY, THE STATUTORY BUDGET, AND THEN FINALIZE AND RELEASE THE FINAL BUDGET DOCUMENT IN MID DECEMBER
  • SO THAT CONCLUDES OUR PRESENTATION
  • WE RECOGNIZE WE WENT FAIRLY QUICKLY THROUGH ALL OF THIS A LOT OF INFORMATION
  • BUT AGAIN, COMMISSIONERS HAVE SEEN MUCH OF IT, SO WE'D BE HAPPY TO ENTERTAIN ANY QUESTIONS OR GO BACK AND REVIEW ANY OF THE INFORMATION IF YOU'D LIKE
  • IT HELPS IF I UNMUTE FIRST
  • YES, YOU'RE FINE
  • I DO SEE EXECUTIVE DIRECTOR
  • ALL RIGHT THEN, STEVE
  • YEAH, IF I COULD JUST COMMISSIONER, JUST TO ADD, I THINK DAN AND MICHAEL FOR WALKING THROUGH THAT
  • I DO WANT TO HIGHLIGHT ONE THING THAT WAS IN THERE TOO, AS WELL, WHICH IS ONE OF MY KEY OBJECTIVES FOR 2022 WAS TO INCREASE OUR INVESTMENT IN THE PORT HUMAN CAPITAL AFTER TWO YEARS OF SEVERE CONSTRAINTS, WHICH YOU SAW REFLECTED ON THE PRESENTATION OF MICHAEL'S PART, MORE RESOURCES ARE NEEDED SO WE CAN ERASE THE BACKLOG OF DELAYED WORK AND RELEASE THE BURDEN ON THE STAFF AND SUCCESSFULLY EXECUTE FUTURE PROJECTS AND PROGRAMS AND WE'RE PROPOSING AN AVERAGE 6% PAY FOR PERFORMANCE INCREASE FOR NON REPRESENTED WORKERS WITH PAY NEGOTIATED FOR REPRESENTATIVE WORKERS BASED ON THEIR CONTRACTS
  • AND THIS INCLUDES WE'RE ALSO LOOKING AT NEW TRAINING, EDUCATIONAL REIMBURSEMENT AND ESSENTIAL TRAVEL INCREASING, WHICH WASN'T THERE BEFORE
  • SO THANKS, MR PRESIDENT
  • JUST WANTED TO ADD THOSE THOUGHTS AS ONE OF THE FOCUSES OF THE BUDGET
  • WELL, THANK YOU, EXECUTIVE METRUCK AND COMMISSIONERS, STAFF AND THE PUBLIC FOR THE WORK THAT WENT INTO THE CREATION OF THIS 2022 BUDGET
  • AS A REMINDER, TODAY IS THE FIRST READING OF THESE RESOLUTIONS
  • FINAL ACTION IS SCHEDULED DURING THE SECOND READING OF THEM ON NOVEMBER 16, 2021
  • I'M SURE COMMISSIONERS WILL HAVE COMMENTS TO SHARE REGARDING THE BUDGET PROCESS BETWEEN THIS MEETING AND NEXT
  • FOR NOW WILL LET'S OPEN THE PUBLIC HEARING NOW FOR THE PUBLIC AND THE MOTIONS TO INTRODUCE THE RESOLUTIONS ON THE FLOOR
  • TAKE ANY QUESTIONS OR COMMENTS FROM COMMISSIONERS MAY HAVE AND THE PUBLIC HEARING ON RESOLUTIONS NUMBER 37, 93 AND 37 94 IS NOW OPEN
  • MY UNDERSTANDING IS THAT WE DO NOT HAVE ANY MEMBERS OF THE PUBLIC TO SPEAK AT THIS TIME, WHICH I ALSO DO BELIEVE SPEAKS TO THE POINT OF EQUITY AND BUDGETING THAT WE NEED TO CONTINUE TO MAKE AN EFFORT FOR THAT LEVEL OF ENGAGEMENT AND TO PERHAPS GET BETTER COVERAGE IN THE GENERAL PRESS
  • SO PEOPLE KNOW THAT THIS IS HAPPENING, BUT ARE THERE ANY SPEAKERS SIGNED UP AT THIS TIME? THANK YOU, MR COMMISSION PRESIDENT
  • WE DO NOT HAVE ANYONE SIGNED UP IN ADVANCE, BUT IF YOU WOULD, COULD YOU PLEASE CALL TO SEE IF THERE'S ANYONE ON THE LINE WHO WOULD LIKE TO ADDRESS THIS ITEM UNDER PUBLIC HEARING? IS THERE ANYBODY CURRENTLY ON THE LINE THAT WOULD LIKE TO MAKE A TESTIMONY AT THIS PUBLIC HEARING? WELL, THEN THAT CONCLUDES THE LIST OF PEOPLE WHO HAVE SIGNED UP TO TESTIFY ON THIS ITEM
  • AND THANKS TO EVERYONE WHO DIDN'T TAKE THE TIME TO ADDRESS THIS QUESTION, BUT WE WOULD NOW LIKE TO HEAR FROM THE COMMISSION
  • MR COMMISSION PRESIDENT, I'M SORRY TO INTERRUPT YOU, SIR, BEFORE WE DO THAT, CAN WE OFFICIALLY CLOSE THIS PUBLIC HEARING? I HEAR YOU NOW
  • I DIDN'T KNOW WHETHER THE DISCUSSION OF THE COMMISSION WOULD BE PART OF THE HEARING, BUT I TAKE IT IT JUST CLOSES AFTER THE PUBLIC COMMENT
  • CORRECT
  • THE HEARING IS NOW CLOSED
  • IS THERE A MOTION AND A SECOND TO APPROVE THE INTRODUCTION TO THE ITEM TEN A
  • THE RESOLUTION SETTING THE 2022 BUDGET? SO MOVED
  • IS THAT COMMISSIONER CHO? IT IS INDEED
  • THANK YOU
  • THE MOTION HAS BEEN MOVED AND SECONDED, FOR THE PURPOSES OF DISCUSSION, WE'LL TAKE STAFF QUESTIONS AND COMMISSIONER DEBATE AT THIS TIME
  • CLERK HART, WOULD YOU PLEASE GO AROUND THE ROOM TO SEE IF WE HAVE ANY QUESTIONS WE'LL DO BEGINNING WITH COMMISSIONER STEINBRUECK
  • NO QUESTIONS
  • THANK YOU
  • THANK YOU, COMMISSIONER CHO
  • I DON'T HAVE ANY QUESTIONS
  • I DID WANT TO MAKE A COMMENT, HOWEVER, THAT IT'S BEEN A DIFFICULT TWO YEARS FOR DAN AND HIS TEAM WHEN CODE FIRST STARTED
  • OBVIOUSLY, THERE WAS A LOT OF UNCERTAINTY AND A LOT OF FORECASTING THAT WE DID
  • I REMEMBER DAN WHEN WE WERE DOING THE DIFFERENT SCENARIOS
  • IT WAS WORST CASE SCENARIO, NOT WORST WITH THE TC SCENARIO BECAUSE WE DIDN'T REALLY KNOW WHAT THE WORST CASE SCENARIO WAS GOING TO BE
  • AND WE COME A LONG WAY
  • AND I'M GLAD TO SEE US RECOVERING
  • IT'D BE SOMETHING AVIATION A LOT QUICKER
  • ONE THING I DID WANT TO CALL OUT AND REALLY APPRECIATE IS THE LISTENING TOUR THAT MY COLLEAGUES OBLIGED ME ON AND ALLOWED FOR US TO DO
  • WE HAD OVER 100 PEOPLE OVER TWELVE STAKEHOLDER GROUPS PROVIDE US WITH FEEDBACK ON HOW THE PORTION CONTRIBUTING TO AN EQUITABLE RECOVERY POST COVID 19
  • MANY ELT LEADERS ALSO LED THOSE CONVERSATIONS
  • AND I REALLY DO THINK THAT THIS BUDGET REFLECTS MANY OF THE THINGS THAT CAME OUT OF THOSE MEETINGS
  • AND SO I'M REALLY GRATEFUL TO NOT JUST MY COLLEAGUES WHO OBLIGED IN THIS EXERCISE, BUT ALSO TO ALL THE EXECUTIVE LEADERS, STEVE, AND EVERYONE ELSE WHO REALLY TOOK IT SERIOUSLY
  • AND I THINK WE'RE ALL BETTER FOR IT
  • SO I LOOK FORWARD TO VOTING IN FAVOR OF THIS BUDGET FOR NEXT YEAR AND LOOKING TO DO THE WORK ON RECOVERY
  • THANKS
  • THANK YOU, COMMISSIONER
  • COMMISSIONER
  • THANKS
  • I JUST WANTED TO SHARE A COUPLE OF COMMENTS ON THE TAX LEVY BECAUSE AS WE GO TO A VOTE ON THIS EVERY YEAR, WE, AS COMMISSIONERS, GET LOTS OF FEEDBACK FROM THE PUBLIC ABOUT IT
  • AND HAVING JUST COMPLETED A CAMPAIGN SEASON, I CAN TELL YOU IT IS A COMMENT THAT PEOPLE OR QUESTION THAT PEOPLE ASK REGULARLY IS, WHY DOES THE PORT NEED A TAX LEVY? AND I THINK PART OF THE CHALLENGE COMES FROM WHAT A UNIQUE INSTITUTION WE ARE
  • IN SOME WAYS, WE ARE LIKE A CITY
  • WE HAVE A POLICE DEPARTMENT, WE HAVE A FIRE DEPARTMENT, WE PROVIDE ALL THESE GOVERNMENT FUNCTIONS WITHIN A VERY NARROW CHARTER
  • AND SO ONE FROM THE OUTSIDE MIGHT THINK, OH, IT'S KIND OF LIKE ANY MUNICIPAL GOVERNMENT
  • AND YET WE ARE A SPECIAL PURPOSE DISTRICT WITH A VERY TIGHT CHARTER ABOUT WHAT WE CAN DO
  • AND THEN, ON THE OTHER HAND, WE OPERATE BUSINESS UNITS THAT FUNCTION WHOLLY PROFITABLY
  • AND WHETHER THAT'S THE AIRPORT OR SOCIAL BAY MARINA
  • AND SO AT FIRST GLANCE, YOU MIGHT LOOK AT AN INSTITUTION LIKE THE PORT AND THINK, WHY ARE THEY TAKING TAX LEVY FUNDS TO THEN SUPPORT BUSINESS UNITS LIKE SOCIAL AND THE AIRPORT, WHEN IN FACT, THAT'S NOT WHAT WE'RE DOING WITH IT
  • AND AS THE PRESENTATION MADE CLEAR, THE TAX LEVY USES, BY AND LARGE FALL UNDER THE AREAS OF WHAT WE DO AS A SPECIAL PURPOSE DISTRICT THAT ARE VERY GOVERNMENTAL IN OUR FUNCTION, THOSE AREAS WHERE THE MARKET MAY NOT PERFECTLY FUNCTION
  • AND SO A GOOD EXAMPLE OF THAT IS THE ENVIRONMENTAL SUSTAINABILITY WORK THAT WE DO
  • THERE ISN'T NECESSARILY A MARKET FOR CLEANING UP THE RIVER THAT WAS POLLUTED 100 YEARS AGO
  • AND SO WHO'S GOING TO STEP UP TO DO THAT? BUT GOVERNMENT AND SO OUR TAX LEVY BACKSTOPS THAT KIND OF THING
  • ANOTHER VERY IMPORTANT EXAMPLE, WHICH MAKES UP A VERY SIGNIFICANT PORTION OF JUST FOR THIS YEAR'S INSTANCE, IS THE BUILDING OF INFRASTRUCTURE
  • WE BUILD SECTIONS OF HIGHWAY, PARTS OF TUNNELS THAT SUPPORT THE WORK THAT IS ABSOLUTELY ESSENTIAL FOR US AS A COMMUNITY, GETTING GOODS AND PEOPLE AROUND OUR REGION
  • AND YET THERE'S NO WAY TO CAPTURE THAT AS PART OF JUST A STRAIGHT UP MARKET
  • IT NEEDS TO BE GOVERNMENT COLLECTIVELY
  • THAT DOES THAT
  • AND WE, AS A PORT AUTHORITY, HAVE SOME RESPONSIBILITY TO DO THAT
  • AND THANKFULLY, WE HAVE THE TAX LEVY CAPACITY TO DO THAT WHEN YOU TAKE THAT UNDERSTANDING AND THEN YOU COUPLE IT WITH HOW WELL THE EXECUTIVE LEADERSHIP HAS DONE TO EFFECTIVELY THIS YEAR MAINTAIN IN AN ABSOLUTE SENSE, THE $72 PER MEDIAN HOUSEHOLD THAT IS THE PORT LEVIES FOR MEDIAN KING COUNTY HOUSEHOLD
  • I THINK THAT'S SOMETHING WE CAN BE REALLY PROUD OF
  • IT'S EXCELLENT WORK BY THE STAFF TO MAKE SURE THAT WE ARE A LEAN ORGANIZATION USING EVERY DOLLAR ADEQUATELY TO ACCOMPLISH BIG PUBLIC GOODS THAT SERVE EVERYONE
  • AND SO I'M HAPPY TO VOTE FOR THIS INCREASE IN A NOMINAL SENSE AND TO BE VERY SUPPORTIVE OF STAFF WORK TO GET US TO THAT LEVEL
  • THANK YOU
  • THANK YOU, COMMISSIONER COMMISSIONER BOWMAN
  • AYE
  • I DON'T HAVE ANY COMMENTS AT THE MOMENT
  • THANK YOU
  • THANK YOU, COMMISSIONER
  • COMMISSIONER FELLEMAN, THANK YOU
  • I WANT TO EXPRESS MY APPRECIATION FOR THE EXTRA TIME WE SPENT GOING BACK AND FORTH WITH THE COMMISSION AND THE EXECUTIVE SIDE TO FULLY INTEGRATE THE POLICY INTERESTS AND THE ORGANIZATION, MAKING IT REALLY ONE EFFORT GOING FORWARD
  • AND I APPRECIATE THE FLEXIBILITY AND REALLY THE HONING IN ON MAKING GOOD IDEAS, MUCH BETTER TO BE BETTER INTEGRATED WITH THE ORGANIZATION'S GOALS
  • AND I THINK THIS BUDGET REFLECTS THAT EXTRA ITERATIVE WORK
  • AND I WANT TO THANK YOU FOR THAT
  • HAVING SAID THAT, I JUST WANT TO GO BACK ON A SMALL THING
  • ON PAGE EIGHT OF THE POWERPOINT WAS A LIST OF SOME OF THOSE ADDITIONAL INITIATIVES THAT WEREN'T IN THE FIRST DRAFT AND IN THE COMMUNITY LONG LIST OF COMMUNITY PAGE
  • WE HAD THIS ONE SMALL, I THINK, $25,000 ASK FOR A LOWER DUWAMISH SALMON STEWARD, WHICH IS A NEW INITIATIVE AS WELL
  • THAT WHILE SMALL, I KNOW, IS VERY MUCH APPRECIATED BY THE COMMUNITY, AND ALSO ONE IN WHICH WE ARE DOING A COLLABORATIVE WORK WITH KING COUNTY AND THE CITY, WHICH HONESTLY IS AS IMPORTANT AS THE DOLLAR AMOUNT IN MY BOOK
  • IN TERMS OF REALLY PULLING TOGETHER, WE'RE ALSO THE PRIMARY RESPONSIBLE PARTIES, ALONG WITH BOEING, WITH THE CLEAN UP OF THAT RIVER, THE MORE AND MORE WE WORK TOGETHER TO STEWARD THAT RESOURCE, WHICH ACTUALLY REALLY CONTINUES TO SURPRISE ME, IS ONE OF THE MOST SIGNIFICANT CHINOOK SALMON SOURCES IN THE WASHINGTON'S INTERNAL WATERS
  • AND IN FACT, JUST YESTERDAY, J AND L POD WERE SEEN ENTERING THE NORTH END OF THE ADMIRALTY INLET AREA, WHICH IS THE FIRST REALLY FORAY THIS TIME OF YEAR
  • BUT IT IS THE PREDICTABLE ARRIVAL OF THE WHALES, WHICH IS WHY I'M TRYING TO GET SOME HYDROPHONES IN THE WATER IN TIME SO WE CAN COMMUNICATE WITH THOSE SHIPS
  • BUT IT'S REALLY A FANTASTIC THING, AND THEY DON'T SHOW UP JUST FOR THE SCENIC BEAUTY
  • THEY COME IN HERE BECAUSE THIS IS WHERE THE FISH ARE
  • AND I THINK THAT'S REALLY A REFLECTION OF A LOT OF THE HARD WORK THE PORT STAFF HAVE DONE ALONG WITH OUR TRIBES AND OTHERS ALONG THE WHOLE FUGITIVE SOUTH WATERWAY
  • SO THANK YOU VERY MUCH FOR ALL THIS WORK
  • AND I THINK OUR MONEY IS BEING VERY WELL SPENT
  • AND THE TAX LEVY IS A WAY FOR EVERYBODY TO BE PART OF THAT
  • AND I DO BELIEVE ONE OTHER THOUGHT ABOUT THE LEVY IS THAT WHILE THE AIRPORT IS SELF SUSTAINING AND THAT THESE HUGE BILLION DOLLAR A YEAR INVESTMENTS ARE NOT COMING OUT OF THE LEVY, EVERYBODY IN THE REGION BENEFITS FROM THAT AIRPORT
  • BUT THERE ARE A SUBSET OF OUR COMMUNITY THAT IS DISPROPORTIONATELY IMPACTED BY THAT AIRPORT
  • AND SO I BELIEVE IT'S IN ALL OF OUR INTERESTS TO BE ABLE TO HAVE SUCH A REGIONAL ASSET REALLY UNIQUELY IN FOUR STATE AREA
  • THAT PART OF OUR PROPERTY TAX GOES TO HELP MITIGATE SOME OF THOSE IMPACTS TO THOSE COMMUNITIES WHERE A LOT OF THOSE DISCRETIONARY FUNDS ARE SPENT
  • SO I THINK NOT ONLY IS IT A SMALL AMOUNT, I THINK IT'S A JUST AMOUNT
  • AND SO I JUST APPRECIATE THAT CLARITY
  • AND THANK YOU FOR ALL THE HARD WORK YOU PUT INTO THIS AND THE CLARITY WITH WHAT YOU PRESENTED
  • DO WE HAVE ANY OTHER SPEAKERS OR QUESTIONS? I CAN CERTAINLY GO AROUND THE ROLE ONE MORE TIME IF YOU WOULD LIKE THE SHOW OF HANDS
  • YES
  • I DON'T SEE ANY CURRENTLY
  • OKAY, SO THAT WAS THE FIRST READING
  • MOVING ON HERE
  • LET'S GO AHEAD AND GET THAT VOTE IN THEN FOR INTRODUCTION, INTRODUCE YOURSELVES AND WE WILL THEN KNOW FURTHER DISCUSSION
  • PLEASE CALL THE ROLL FOR THE VOTE ON THE MOTION TO INTRODUCE RESOLUTION 37, 93
  • COMMISSIONERS, PLEASE SAY YES OR NO WHEN YOUR NAME IS CALLED AND WE'LL BEGIN WITH COMMISSIONERS STEINBRUECK
  • YES
  • THANK YOU, COMMISSIONERS CHO
  • AYE
  • THANK YOU, COMMISSIONER
  • THANK YOU, COMMISSIONERS BOWMAN
  • THANK YOU, COMMISSIONER FELLEMAN
  • AYE
  • THANK YOU
  • YOU HAVE FIVE YESSES AND ZERO NOS FOR THIS ITEM
  • WELL, THE FIRST READING OF THE DRAFT 2022 BUDGET PASSES
  • VERY EXCITING
  • SO NOW THERE'S A MOTION
  • WE NEED A MOTION IN A SECOND OR THERE IS ONE TO APPROVE INTRODUCTION OF ITEM TEN B, THE RESOLUTION SETTING 2022 REGULAR PROPERTY LEVY
  • YES
  • WE STILL NEED THE MOTION
  • AND THE SECOND ON THE FLOOR
  • IS THERE A MOTION? I'M SORRY, WAS THAT COMMISSIONER CHO? THANK YOU
  • IS THERE A SECOND 2ND? ALL RIGHT
  • MOTION HAS BEEN MOVED AND SECONDED AGAIN FOR THE PURPOSE OF DISCUSSION, WE'LL TAKE STAFF QUESTIONS AND COMMISSIONER DEBATE AT THIS TIME
  • COMMISSIONERS, PLEASE UNMUTE YOURSELVES FOR QUESTIONS, COMMENTS AND DISCUSSION
  • PRESENTERS WILL REMAIN AUDIBLE
  • CLERK HART, SO PLEASE CALL THE ROLL
  • THANK YOU FOR ANY ADDITIONAL QUESTIONS ON THIS ITEM, BEGINNING WITH COMMISSIONER STEINBRUECK
  • NO QUESTIONS
  • THANK YOU
  • THANK YOU, COMMISSIONER CHO
  • NO QUESTIONS OR COMMENTS
  • THANK YOU ALL
  • THANK YOU, COMMISSIONER CALKINS
  • NONE FOR ME
  • THANK YOU, COMMISSIONER BOWMAN
  • TWO QUESTIONS
  • THANK YOU, COMMISSIONER FELLEMAN
  • I THINK WE CONFLATED ALL OUR COMMENTS ON THE FIRST ONE
  • SO SEEING THAT NO FURTHER DISCUSSION
  • CLERK HART, PLEASE CALL THE ROLL FOR THE VOTE ON THE MOTION TO INTRODUCE RESOLUTION 37 94
  • COMMISSIONERS, PLEASE SAY YES OR NO WHEN YOUR NAME IS CALLED COMMISSIONER STEINBRUECK
  • YES
  • THANK YOU
  • COMMISSIONER CHO
  • AYE
  • THANK YOU, COMMISSIONER CALKINS
  • AYE
  • THANK YOU, COMMISSIONER BOWMAN
  • AYE
  • THANK YOU, COMMISSIONER FELLEMAN
  • AYE
  • THANK YOU
  • YOU HAVE FIVE YESSES AND ZERO NOS FOR THIS ITEM
  • WELL, THE MOTION PASSES
  • WELL, THANKS, EVERYONE
  • NEXT ON OUR AGENDA IS APPROVAL OF THE CONSENT AGENDA
  • THAT'S ITEM EIGHT ITEMS ON THE CONSENT AGENDA ARE CONSIDERED ROUTINE AND WILL BE ADOPTED BY ONE MOTION
  • ITEMS REMOVED FROM THE CONSENT AGENDA WILL BE CONSIDERED SEPARATELY IMMEDIATELY AFTER ADOPTION OF THE REMAINING CONSENT AGENDA
  • ITEMS WE'VE HEARD OF NO ITEMS TO BE PULLED TODAY FROM CONSENT
  • AT THIS TIME, THE CHAIR WILL ENTERTAIN A MOTION TO APPROVE THE CONSENT AGENDA COVERING ITEMS EIGHT A THROUGH EIGHT M
  • SO MOVED SECOND
  • WELL, THEN THE MOTION HAS BEEN MOVED
  • AND SECONDED, COMMISSIONERS, PLEASE SAY YES OR NO WHEN YOUR NAME IS CALLED CLERK HART, PLEASE CALL THE ROLL FOR APPROVAL OF THE CONSENT AGENDA BEGINNING WITH COMMISSIONER STEINBRUECK
  • YES
  • THANK YOU, COMMISSIONERS CHO
  • YES
  • THANK YOU, COMMISSIONER
  • THANK YOU, COMMISSIONER BOWMAN
  • AYE
  • THANK YOU, COMMISSIONER FELLEMAN
  • AYE
  • THANK YOU
  • YOU HAVE FIVE YESES AND ZERO NOTES THIS ITEM
  • WELL, THEN THE AGENDA PASSES
  • SO NEXT UP WE WILL GO ON TO WE'RE GOING TO SEE IF UNFINISHED BUSINESS
  • ITEM NINE
  • AND THEN WE'LL MOVE STRAIGHT INTO THE NEXT ITEM, WHICH WOULD BE LET ME JUST SEE HERE
  • THAT IS ON PAGE 35, COMMISSIONER
  • AND IT'S ITEM TEN C
  • I CAN READ IT INTO THE RECORD FOR YOU, PLEASE
  • THANK YOU
  • THAT IS NEW BUSINESS
  • ITEM TEN C
  • AUTHORIZATION FOR THE EXECUTIVE DIRECTOR TO EXECUTE A CONTRACT IN THE ESTIMATED AMOUNT OF $2,300,000 FOR A TWO YEAR AGREEMENT WITH OPTIONS FOR THREE ONE YEAR EXTENSIONS FOR ELECTRIC CART SERVICE BETWEEN THE SEA INTERNATIONAL AIRPORT MAIN TERMINAL AND SOUND TRANSIT LINK LIGHT RAIL AIRPORT STATION
  • THANKS, CLERK HART
  • COMMISSIONERS SEA HAS OFFERED ELECTRIC CART TRANSPORTATION BETWEEN THE AIRPORT'S MAIN TERMINAL AND SOUND TRANSIT AIRPORT STATION SINCE FEBRUARY 2017
  • TO DATE, THE SYSTEM HAS TRANSPORTED MORE THAN 1.3 MILLION CUSTOMERS AND PROVIDED PASSENGERS WITH AN AMENITY THAT MAKES IT EASIER TO ACCESS THE AIRPORT THROUGH PUBLIC TRANSPORTATION
  • THIS AUTHORIZATION WILL EXTEND THIS SERVICE TO SUPPORT LIGHT RAIL TRANSIT ACCESSIBILITY MOBILITY FOR ALL OF OUR CUSTOMERS
  • PRESENTERS ARE JEFF HOVETTE, SENIOR MANAGER, AIRPORT OPERATIONS, LANDSIDE OPERATIONS, AND ALSO, I BELIEVE, KATHY REUTER, DIRECTOR OF COMMUNICATIONS AND MARKETING, EXTERNAL RELATIONS
  • JEFF, THANK YOU, STEVE
  • I REALLY BELIEVE GOT OUR SLIDE PRESENTATION UP FOR US
  • AFTERNOON COMMISSIONER'S EXECUTIVE DIRECTOR METRUCK STEVE MENTIONED
  • I'M JEFF HOVETT, SENIOR MANAGER OF AIRPORT OPERATIONS AND PATRICK ROADERS WITH ME THIS AFTERNOON
  • TALK ABOUT JUST A FEW SLIDES ON THE AIRPORT'S TRAINED A PLAIN ELECTRIC CART SERVICE THAT CONNECTS SOUND TRANSIT FLIGHT RAIL TO THE AIRPORT'S MAIN TERMINAL
  • YOU'LL SEE IN THESE SLIDES THAT SOME OF THE IMAGES WE HAVE HERE THAT PEOPLE DON'T HAVE A MASK ON OR DO THE MASCOTS HAVE A MASK ON, BUT WE DO HAVE THAT IN PLACE NOW AS PART OF THE GOVERNOR'S MANDATE
  • NEXT SLIDE, PLEASE
  • AUBREE SO STEVE MENTIONED WE'VE HAD THE SERVICE IN PLACE SINCE FEBRUARY 2017
  • WE'VE BEEN OFFERING ELECTRIC CAR SERVICE TO MAKE THE CONNECTION TO THE PUBLIC MUCH EASIER
  • ENCOURAGE PASSENGERS TO UTILIZE PUBLIC TRANSPORTATION SERVICES
  • THE TRAIN TO PLANE ELECTRIC CAR SERVICE TYPICALLY OPERATES JUST AS THE FIRST TRAIN ARRIVES AROUND 05:00 A.M.
  • IN THE MORNING AND CONTINUES ALL DAY AND THEN TO MIDNIGHT
  • THE OPERATOR ADDS ADDITIONAL CARS AT PEAK TIMES TO ENSURE CONSISTENT SERVICE DERIVING AND DEPARTING CUSTOMERS
  • NEXT SLIDE PLEASE
  • THESE ELECTRIC CARS THEY TYPICALLY HOLD UP TO SIX PEOPLE
  • THAT INCLUDES THE DRIVER, AND THEY REALLY HAVE BEEN POPULAR WITH CUSTOMERS AND WRITERS
  • PRECOVID WE AVERAGE MORE THAN 30,000 PASSENGERS TRANSPORTED EACH MONTH
  • WE CURRENTLY SEE RIDERSHIP AT NEARLY 20,000 EACH MONTH, AND THAT'S RISING
  • A BIG PART OF OUR ENGAGEMENT WITH THE PUBLIC
  • AND SOUNDTRANS HAS BEEN PROMOTING THE SERVICES THAT'S THE CART SERVICES FEATURED AT BOTH THE PORT OF SEATTLE AND SOUND TRANSIT'S WEBSITE AND PORT EXTERNAL AFFAIRS HAS TOUTED THE SERVICE AND PUBLIC COMMUNICATION WITH REBRANDING OF PLANE TO TRAIN TO PLANE
  • I GET THAT MIXED UP BECAUSE I'M AN AIRPORT GUY
  • I'LL SAY PLANE TO TRAIN
  • IT REALLY IS TRAIN TO PLANE
  • PRIOR TO THIS REQUEST, OUR EXTERNAL AFFAIRS TEAM HAS PROMOTED THE TRAIN TO PLANE SERVICE IN A VARIETY OF WAYS TO KEEP THE SERVICE VISIBLE
  • THERE ARE RENEWED EFFORTS TO KEEP THE PUBLIC INFORMED THAT EXISTS
  • KATHY ROTORS WITH ME TODAY TO COVER THE NEXT FEW SLIDES
  • CATHY, THANK YOU
  • AS JEFF MENTIONED, WE HAVE DONE NEARLY ANNUAL PROMOTIONS OF THE TRAIN TO PLANE CART, ALWAYS IN PARTNERSHIP OR MOST ALWAYS IN PARTNERSHIP WITH SALE TRANSIT, AND WE'VE GOT THEM PROMOTED ON OUR WEBSITE AND THEN WE'VE DONE A COUPLE OF THINGS IN PERSON AS WELL
  • IF WE CAN COME TO OUR NEXT SLIDE IN 2018, WE DID TWO EVENTS PROMOTING LIGHT RAIL OVERALL, BUT ALSO DRIVING ATTENTION TO THE CART OUT AT THE AIRPORT
  • WE DID A BIRTHDAY PARTY FOR THE AIRPORT
  • WE HANDED OUT FREE TICKETS
  • SOUNDTRANS HAD A GRANT THAT ENABLED THEM TO HAND OUT FREE TICKETS TO PASSENGERS
  • SO WE DID AN INTERNAL GIVEAWAY OF LIGHT RAIL TICKETS
  • WE ALSO HAD A MEDIA EVENT
  • YOU CAN SEE WE HAD A REALLY FUN DAY WITH A LOT OF SPORTS MASCOTS
  • WE ALSO DID A TICKET GIVEAWAY IN PARTNERSHIP WITH SOUND TRANSIT OUT AT TERMINAL 91 AT SMITH COVE CRUISE TERMINAL WHEN WE WERE JUST LAUNCHING OUR PORT BALLET PROGRAM AND WE WANTED TO BUILD SUPPORT FOR PEOPLE TO TAKE LIGHT, DROP OFF THEIR BAGS AND THEN GO DOWNTOWN OR SOMEWHERE CLOSE AND THEN USE LIGHT RAIL TO GO OUT TO THE AIRPORT
  • SO THOSE WERE VERY EFFECTIVE PROMOTIONS THAT WE WERE USING AT THE TIME TO LAUNCH INITIATIVES
  • WE CAN GO TO THE NEXT SLIDE, PLEASE
  • IN 2019 IS WHEN WE ACTUALLY BRANDED THE CART WITH THE TRAIN TO PLANE, AND WE DID ADVERTISING CAMPAIGNS THAT YEAR
  • A LOT OF THE COMMUNICATIONS FOR THIS EFFORT FOCUSES ON FOLKS WHO ARE ALREADY LEANING TOWARDS USING LIGHT RAIL AND JUST MAYBE AREN'T USING IT YET FOR THE AIRPORT
  • SO WE WANTED PEOPLE WHO ARE INCLINED TO THINK ABOUT LIGHT RAIL AS A SOLUTION FOR THEM TO KNOW THAT WE COULD MAKE IT EASIER, MAKE THAT A QUARTER MILE WALK A LITTLE BIT FASTER AND A LITTLE BIT EASIER WITH THEIR LUGGAGE
  • SO WE HAD PROMOTIONS THAT WERE ACTUALLY ON LIGHT RAIL, BUT WE ALSO HAD THEM IN OUR OWN AIRPORT
  • IF WE CAN GO TO THE NEXT SLIDE, PLEASE
  • 2020 WAS A DIFFICULT YEAR
  • WE DIDN'T DO ANY PROMOTIONS IN 2020 JUST BECAUSE PASSENGERS AND RIDERSHIP WAS DOWN SO MUCH
  • BUT WHAT WE DID DO IN 2021, SOMETHING THAT WE'VE OBSERVED IS WE LOOK AT ANALYTICS ON OUR WEBSITE
  • OUR NEWSROOM IS THAT THIS BLOG ALL YOU EVER WANTED TO KNOW ABOUT LINK LIGHT RAIL TWO SEA AIRPORT IS ALWAYS ONE OF THE MOST VIEWED BLOGS EVERY SINGLE MONTH FOR YEARS
  • AND SO ONE OF THE THINGS WE DECIDED TO DO THIS YEAR WAS TO TRANSLATE IT INTO FIVE LANGUAGES THAT ARE HIGHLY RELEVANT TO BOTH OUR PASSENGER COMMUNITY, BUT ALSO OUR EMPLOYEE COMMUNITY
  • SINCE WE KNOW THIS IS AN AMENITY THAT'S REALLY IMPORTANT TO EMPLOYEES AS WELL
  • OUR WEBSITE IS ALREADY AVAILABLE VIA GOOGLE TRANSLATE IN ANY LANGUAGE
  • BUT ONE THING WE DO KNOW IS THAT DOING SPECIFIC TRANSLATIONS FOR CONTENT MAKES THEM MORE ACCESSIBLE AND MORE ACCURATE, AND THAT CONTINUES TO BE AN ISSUE FOR ANY TRANSLATED CONTENT
  • IT MAKES THEM LESS EVERGREEN
  • BUT SINCE THIS BLOG HAS BEEN VERY POPULAR FOR YEARS, WE DON'T CHANGE IT VERY OFTEN
  • THE CONTENT JUST NEEDS A LITTLE BIT OF AN UPDATE ON THE THREE NEW STATIONS, BUT OTHERWISE IT'S VERY RELIABLE
  • WE'VE DONE THIS WITH OTHER BLOGS AS WELL
  • WE'RE WORKING OUR WAY THROUGH THE MOST IN DEMAND CONTENT TO MAKE SURE THAT WE HAVE DIRECT TRANSLATIONS
  • LAST SLIDE
  • I THINK THIS MIGHT BE STARTING VERY SOON
  • WE WILL HAVE OUR HOLIDAY CAMPAIGN AND WE ARE PROMOTING USING LINK LIGHT RAIL TO COME TO THE PUBLIC TRANSIT TAXIS TNCS TO COME TO THE AIRPORT BECAUSE FOR CARBON EMISSIONS, ALSO BECAUSE OUR GARAGE IS PRETTY CONSTRAINED RIGHT NOW AND BECAUSE IT DIDN'T
  • SO THIS IS A CAMPAIGN THAT WILL LAUNCH VERY SHORTLY TOWARDS THE END OF NEXT WEEK
  • AND WE ARE IN TALKS WITH SOUND TRANSIT RIGHT NOW WITH THEIR MARKETING DEPARTMENT, PARTICULARLY NOW THAT THEY HAVE THESE THREE NEW STATIONS, HOW WE CAN START FOLDING INTO FUTURE PHASES OF THEIR ADVERTISING CAMPAIGNS TO BRING NEW PEOPLE INTO TRYING TO TAKE WHITE RAIL TO THE AIRPORT
  • SO THAT'S WORK THAT'S UNDERWAY RIGHT NOW
  • THANKS, CATHY CHRISTIANS
  • WE'RE EXTREMELY PROUD OF THE SERVICE AND I APPRECIATE THE BUSINESS PARTNERS THAT HAVE MANAGED THE SYSTEM WITH CONSISTENT SAFE TRANSPORTATION TO AND FROM THE AIRPORT LAKELIGHT RAIL TRAIN SYSTEM AND NOW ON TO THE REQUEST
  • THE REQUEST IS FOR AUTHORIZATION TO CONTINUE THIS SERVICE
  • WE HAVE AN INTEREST IN PURSUING A CONTRACT THAT'S ESTIMATED TO BE $2.3 MILLION FOR A TWO YEAR AGREEMENT WITH UP TO THREE ONE YEAR EXTENSIONS FOR A TOTAL THAT MAY REACH FIVE YEARS
  • SINCE INITIATING THE CARD SERVICE IN 2017
  • WE'VE CONSISTENTLY RECEIVED POSITIVE COMMENTS FROM CUSTOMERS
  • ELECTRIC CARS MITIGATES THE WALK TO AND FROM LIGHT RAIL, AND IT'S REALLY A WELCOME ADDITION FOR CUSTOMERS WITH MOBILITY CHALLENGES
  • AND YOU MAY RECALL THAT THE WALKWAY ITSELF CONNECTING LIGHT RAIL IN THE AIRPORT WAS UPGRADED IN 2016 WITH EPOXY FLOOR COVERINGS AND PLEXIGLAS WIND BREAKS TO IMPROVE THE EXPERIENCE FOR CUSTOMERS
  • WE'VE LOOKED AT ALTERNATIVES TO ELECTRIC CART SERVICE AS PART OF THIS MEMO THAT WE ISSUED FOR YOU, INCLUDING ELIMINATION THE ALTERNATIVE AND FOUND THAT THE CURRENT PRACTICE AND THE METHOD OF TRANSPORTATION TO BE OUR BEST SOLUTION
  • THERE MAY BE BETTER FUTURE SOLUTIONS TO COME LEVERAGE EMERGING TECHNOLOGY, BUT TODAY'S DEMAND IS BEST MET WITH A COMPACT ELECTRIC CART
  • OUR REQUEST TODAY IS FOR COMMISSION AUTHORIZATION FOR EXECUTIVE DIRECTOR METRUCK TO EXECUTE A CONTRACT FOR SERVICE AND INCLUDES A COMMITMENT FOR TWO YEARS WITH EXTENSION THAT COULD STAND THE AGREEMENT FOR UP TO FIVE, AS I MENTIONED, ANTICIPATE EXPENSES UP TO BUT NOT TO EXCEED $2,300,000
  • THANK YOU FOR LISTENING
  • BE HAPPY TO ENTERTAIN QUESTIONS
  • YOU MUTED, COMMISSIONER
  • I ALMOST CAUGHT MYSELF, SO THANK YOU, JEFF AND CATHY, AND I HAD NO IDEA, KATHY, THAT THAT WAS ONE OF OUR MOST IMPORTANT OR HIGHLY HIT BLOG SITES, AND WE NOW KNOW WE HAVE TAKEN ADVANTAGE OF THAT
  • I JUST HAVE TO SAY THAT WHEN I FIRST GOT TO THE PORT, COMMISSIONER BOWMAN WAS ALREADY RACING AT THIS, EVERYBODY WOULD TELL ME WHAT A WIND TUNNEL IT WAS GOING TO THE PARKING GARAGE, AND THE PORT STAFF DID A GREAT JOB OF ENCLOSING THAT AND MAKING IT MUCH BRIGHTER AND THEN MOVING
  • WHILE I QUICKLY JOINED COMMISSIONER BOWMAN IN ADVOCATING FOR THE MOVING SIDEWALK AND ALL BUT THIS LIGHT RAIL, THIS ELECTRIC GO KART REALLY SEEMED TO BE THE RIGHT SOLUTION AT THIS TIME
  • AND THE FACT THAT IT'S AN INCREASING NEED AND THAT LINKING IT TO THE EXPANSION OF THE LIGHT RAIL MAKES ME VERY HAPPY TO HEAR, AND I'D LIKE TO OPEN IT UP TO COMMISSIONERS FOR COMMENTS STARTING WITH COMMISSIONER BOWMAN
  • OH, THANK YOU, COMMISSIONER BOWMAN
  • I APPRECIATE THAT YOU'RE RIGHT
  • THIS HAS BEEN A PASSION OF MINE SINCE I JOINED THE PORT COMMISSION, AND I REMEMBER THE DAY THAT AS WE WERE SITTING AND HAVING A DISCUSSION ABOUT WHY IT WAS SO EXPENSIVE TO PUT IN THE MOVING WALKWAY
  • AND I SAID IF WE EVER THOUGHT OF GOLF CARTS AND DIDN'T NECESSARILY MEAN IT LIKE GO FORTH, BUT THAT'S WHAT HAPPENED
  • AND I APPRECIATE SO MUCH HOW MUCH WORK HAS BEEN DONE TO PROMOTE THIS
  • I HOPE THAT MOVING FORWARD FOR CATHY AND THE REST OF THE STAFF THAT WE CAN THINK ABOUT OR THAT YOU CAN THINK ABOUT EXTENDING THE PROMOTION OF THIS SERVICE OUTSIDE OF THOSE WHO ALREADY USE TRANSIT
  • I THINK, AS A VERY FREQUENT LIGHT RAIL RIDER MYSELF, I CLEARLY READ THE ADVERTISEMENTS WHEN I'M ON THE TRAIN
  • BUT I THINK WHAT WE'RE REALLY TRYING TO DO IS GET PEOPLE THAT AREN'T CURRENTLY USING LIGHT RAIL TO THE AIRPORT, AS OPPOSED TO THOSE THAT ARE ALREADY USING LIGHT RAIL
  • GENERALLY SPEAKING, I BRING THIS UP BECAUSE, AS I MENTIONED TO EXECUTIVE DIRECTOR METRUCK A FEW WEEKS AGO, I HAD THE OPPORTUNITY TO MAKE A PRESENTATION TO ABOUT 40 ELECTED LEADERS FROM THE EAST SIDE MAYOR'S AND COUNCIL MEMBERS FROM THROUGHOUT KING COUNTY
  • AND AS I TALKED ABOUT THE GOLF CART SERVICE AT THE AIRPORT, NOT A SINGLE ONE OF THEM HAD EVER HEARD OF IT
  • AND SO I WOULD JUST ASK FOR YOU TO REDOUBLE THE EFFORT, WHETHER IT'S THROUGH PAID ADVERTISING OR WHAT WE WOULD CALL EARNED MEDIA
  • I THINK THERE'S A LOT OF OPPORTUNITIES TO GET THAT INFORMATION OUT TO THE GENERAL PUBLIC THAT DOESN'T NECESSARILY NEED TO COST A LOT, BUT REALLY HOPING THAT YOU CAN AGAIN EXTEND THAT BEYOND THOSE THAT CURRENTLY USE LIGHT RAIL AND REALLY MAKING A BIG PUSH TO LET FOLKS, PARTICULARLY ON THE EAST SIDE, KNOW ABOUT THIS OPPORTUNITY
  • HONESTLY, THESE 40 ELECTED OFFICIALS THOUGHT IT WAS A REALLY COOL IDEA, AND SEVERAL OF THEM SAID, OH, WELL, THAT WOULD MAKE A HUGE DIFFERENCE
  • BUT WHETHER I WOULD TAKE LIGHT RAIL TO THE AIRPORT, BUT THEY SIMPLY STILL DON'T KNOW ABOUT THE SERVICE, SO I HOPE THAT CAN HAPPEN
  • MOVING FORWARD
  • THANK YOU SO MUCH
  • CLERK HART, PLEASE CALL THE ROLL FOR QUESTIONS
  • THANK YOU
  • BEGINNING WITH COMMISSIONER STEINBRUECK
  • NO QUESTIONS
  • THANK YOU, COMMISSIONER CHO
  • I THINK THIS IS A NO BRAINER
  • I WOULD LOVE FOR THE EDUCATION OF THE PUBLIC, MAYBE REALLY QUICKLY COVER WHY WE DON'T HAVE A MOVING WALKWAY THERE
  • I'M SORRY IF YOU'VE ALREADY COVERED IT, BUT MY UNDERSTANDING IS THAT YOU CAN'T TAKE UP THE CONCRETE IN THE PARKING LOT IN ORDER TO ACTUALLY PUT A WALKWAY
  • IS THAT ACCURATE? SURE
  • YEAH
  • I'LL GET TO THE COMMISSION SHOW
  • SO THE STRUCTURE ITSELF IS BUILT WITH A POST TENSION STRUCTURE
  • SO THERE ARE CABLES THAT RUN THROUGH THE CONCRETE DECKING IN ORDER FOR US TO PUT IN
  • A MOVING WALKWAY WOULD REQUIRE THAT TO BE DISTURBED
  • AND THAT'S NOT POSSIBLE WITH THAT STRUCTURE
  • SO WE'RE LOOKING DOWN THE ROAD
  • IT'S IN FUTURE PLANNING THAT MAY INCLUDE A MOVING WALKWAY TO SUPPORT ACTIVITY ALONG THAT CORRIDOR
  • IN THE INTERIM, WE'RE ASKING FOR THE ELECTRIC CAR SERVICE TO CONTINUE
  • THANK YOU FOR THE QUESTION
  • SO, IN ESSENCE, IF WE WERE TO MESS WITH THAT CABLING, YOU WOULD MESS WITH THE INTEGRITY OF THE PARKING LOT
  • CORRECT
  • CORRECT
  • ALL RIGHT
  • THANK YOU
  • THANK YOU, COMMISSIONER
  • COMMISSIONER
  • I GUESS THAT WOULDN'T PREVENT US FROM DOING A GIANT SLIP AND SLIDE UP FROM THE TERM
  • THANK YOU FOR THE PRESENTATION
  • AND, JEFF, THANKS FOR MENTIONING THE POTENTIAL FUTURE PLANS AS WELL
  • THAT WOULD REPLACE ALL OF THIS WITH AN EVEN BETTER ALTERNATIVE WHEN POSSIBLE
  • I DON'T HAVE ANY FURTHER QUESTIONS BEYOND THAT
  • THANK YOU, COMMISSIONER
  • COMMISSIONER FELONY, I JUST WANT TO SAY THANKS, AND I WOULD LIKE TO SEE US SPEAK TO THE PUBLIC AFFAIRS PROFILE THAT YOU'RE GOING TO BRING TO THIS SEEMS LIKE A FANTASTIC MOMENT WITH ALL THE ATTENTION GOING TO LIGHT RAIL RIGHT NOW AND LET'S WHOOP IT UP
  • AND IT'S A GREAT STORY
  • AND I DON'T EVEN RECALL SEEING IT REBRANDED
  • I MISSED THAT BECAUSE I WAS JUST THERE AND DIDN'T NOTE IT, AND I'M STILL CALLING ON ALASKA AIRLINES TO GIVE US FREE TICKETS FOR THE TRAVELING PUBLIC SO THAT THEY HAVE THE CLOSEST PROXIMITY
  • ANYWAY, I JUST THOUGHT I KEEP ON SAYING IT OUT LOUD
  • ALL RIGHT
  • THANK YOU VERY MUCH
  • WE'D LIKE TO SEE A MOTION AND A SECOND TO EXPAND THIS GO CART USE
  • SO MOVED, I WILL SECOND IT THEN
  • CLERK HART, WOULD YOU PLEASE CALL THE ROLL FOR THE VOTE FOR THE VOTE BEGINNING WITH COMMISSIONER STEINBRUECK? YES
  • THANK YOU, COMMISSIONER CHO
  • AYE
  • THANK YOU, COMMISSIONER
  • THANK YOU, COMMISSIONERS BOWMAN
  • AYE
  • THANK YOU, COMMISSIONER FELLEMAN
  • AYE
  • THANK YOU
  • YOU HAVE FIVE YESSES AND ZERO NOS FOR THIS ITEM
  • THE MOTION PASSES
  • CLERK HART, PLEASE READ THE NEXT ITEM INTO THE RECORD AND EXECUTIVE DIRECTOR METRUCK WILL INTRODUCE IT
  • THANK YOU
  • WE'RE JUST CLICKING ALONG HERE TODAY
  • THAT IS ITEM TEN D AUTHORIZATION FOR THE EXECUTIVE DIRECTOR TO FUND $21,500,000 FOR THE REMAINING DESIGN FOR ALL PHASES OF THE NORTH MAIN TERMINAL REDEVELOPMENT PROGRAM AT THE SEATTLE TACOMA INTERNATIONAL AIRPORT AND EXECUTION OF A SECOND TENANT REIMBURSEMENT AGREEMENT WITH ALASKA AIRLINES TO COMPLETE THE REMAINING DESIGN SCOPE
  • COMMISSIONERS, EARLIER THIS YEAR, YOU AUTHORIZED $10 MILLION TO COMPLETE THE PROGRAM DEFINITION DOCUMENT, OR PDD FOR OUR NORTH MAIN TERMINAL REDEVELOPMENT PROGRAM
  • WITH BOTH THE PROJECT DEFINITION DOCUMENT IN THE 30% DESIGN NOW COMPLETE, WE ARE BACK BEFORE THE COMMISSION TO REQUEST FUNDS FOR THE REMAINING DESIGN TO EXECUTE THE SECOND TENANT REIMBURSEMENT AGREEMENT
  • ONCE COMPLETE, THE FINISHED PRODUCT WILL REPLACE AND RENEW 1000 1980S AREA FINISHES, IMPROVE PASSENGER PROCESSING, SECURITY, SCREENING THROUGHPUT AND ENHANCE THE OVERALL PASSENGER EXPERIENCE
  • PRESENTERS THIS AFTERNOON ARE JAMES JENNINGS, DIRECTOR, AVIATION BUSINESS AND PROPERTIES, AND ALLEN OLSON, CAPITAL PROJECT MANAGER
  • I'M NOT SURE IF
  • JAMES, ARE YOU GOING FIRST? THERE I AM
  • THANK YOU
  • YEAH
  • THANKS, STEVE
  • GOOD AFTERNOON, COMMISSIONERS
  • EXECUTIVE DIRECTOR METRUCK
  • I'M HERE TODAY WITH ALAN OLSEN AS HE INDICATED, WE'RE GOING TO TALK ABOUT THE NORTH MAIN TERMINAL REDEVELOPMENT PROJECT, SPECIFICALLY REQUESTING THE 21 AND A HALF MILLION DOLLARS TO COMPLETE THE DESIGN
  • THE PORT IN ALASKA HAVE BEEN WORKING FOR A NUMBER OF YEARS IN THE DEVELOPMENT OF THIS IMPORTANT PROJECT, WHICH TOUCHES THE NORTH END OF THE TICKETING AREA, AS WELL AS SEVERAL FLOORS BOTH ABOVE AND BELOW
  • AND ALAN WILL SPEAK A LITTLE BIT MORE ABOUT THAT PROJECT SCOPE, BUT ALASKA WILL BE CONSTRUCTING THIS ON BEHALF OF THE PORT THROUGH A TENANT REIMBURSEMENT AGREEMENT, AND IT'S IMPORTANT TO KNOW THAT IT'S GOING TO BE CONSTRUCTED IN TWO PHASES AND SO NOT TOO FAR IN THE FUTURE
  • OUR STAFF WILL BE RETURNING TO REQUEST CONSTRUCTION FOR THE FIRST PHASE, BUT THE FUNDING OF DESIGN IS ESSENTIALLY WHAT WE'RE HERE TODAY TO REQUEST
  • IT'S IMPORTANT ALSO TO NOTE THAT THIS IS REALLY THE FIRST PHASE OF A LARGER PROGRAM THAT THE PORT IS ACTUALLY GOING TO BE CONTINUING THE INFRASTRUCTURE AND SOME ARCHITECTURAL IMPROVEMENTS AS PART OF A FUTURE PORT PROJECT
  • SO IT IS REALLY AN IMPORTANT PROJECT FOR THE AESTHETICS OF THE FRONT DOOR OF THE AIRPORT AND THE ARCHITECTURAL RENDERINGS AND VISION THAT LANCE HAS SHARED WITH COMMISSION MANY TIMES IN THE PAST
  • SO WITH THAT, I'LL GO AHEAD AND HAND IT OFF TO ALAN OLSON
  • HE CAN SPEAK A LITTLE BIT MORE ABOUT THE SPECIFICS
  • GOOD AFTERNOON, COMMISSIONERS AND EXECUTIVE DIRECTOR PATRICK, COULD WE HAVE THE POWERPOINT PRESENTATION, PLEASE? THANK YOU
  • THIS IS THE SAME INFORMATION THAT JJ JUST SHARED WITH YOU WITH SOME RENDERINGS
  • NEXT SLIDE, PLEASE
  • THIS IS A GENERAL OVERVIEW OF THE AREA WHERE THE WORK IS GOING TO TAKE PLACE
  • SPECIFICALLY AT THE NORTH END OF THE MAIN TERMINAL
  • ALASKA'S TICKETING AND SECURITY SCREENING CHECKPOINT NUMBER FIVE
  • NEXT SLIDE, PLEASE
  • SO THE DRIVERS FOR THIS PROGRAM ARE MANY, BUT ONE OF THE BIGGEST IS THAT THE TERMINAL NEEDS RENEWAL AND REPLACEMENT
  • WE HAVE SOME INFRASTRUCTURE SYSTEMS THAT WE NEED TO UPGRADE
  • IN ADDITION TO GETTING OUR NEW ARCHITECTURAL FINISHES THAT ARE ASSOCIATED WITH THE ARCHITECTURAL VISIONING DOCUMENT THAT JJ WAS TALKING ABOUT, THERE ARE SOME REAL PROBLEMS WITH OVERCROWDING DURING PEAK PERIODS NOT ONLY IN THE TICKETING AREA BUT AT SECURITY SCREENING CHECKPOINT NUMBER FIVE, THIS PROJECT WILL ADDRESS
  • AND IN ORDER TO ENHANCE THAT, WE'RE ALSO GOING TO BE BUILDING OUT THE CURRENTLY UNDEVELOPED PROMENADE, WHICH IS ON THE BRIDGE LEVEL
  • AS YOU'RE COMING OVER FROM THE PARKING GARAGE
  • IT'S THE UNUSED SPACE THAT'S ON EITHER SIDE AS YOU ENTER THE TERMINAL
  • ALONG WITH THAT, WE HAVE SEVERAL CODE AND SAFETY ENHANCEMENTS THAT NEED TO TAKE PLACE
  • CODE UPGRADES AND SAFETY ENHANCEMENTS, THE LARGEST OF THESE BEING SMOKE CONTROL AND FINALLY, CUSTOMER SERVICE ENHANCEMENTS THAT ARE GOING TO PROVIDE FOR INCREASED USE OF TECHNOLOGY BY PASSENGERS AND STAFF, AS WELL AS CREATING A MORE OPEN AND AREA ENVIRONMENT
  • NEXT SLIDE, PLEASE
  • SO THE HIGH LEVEL SCOPE SUMMARY IS TO, AS I SAID EARLIER, BUILD OUT THE CURRENTLY UNDEVELOPED SPACE ON THE PROMENADE AND BRIDGE LEVEL, AND THIS IS GOING TO CREATE NEW SPACE FOR ALASKA CHECKIN AND BACKDROP FOR PEOPLE WHO ARE COMING IN DIRECTLY FROM EITHER LIGHT RAIL OR FROM THE PARKING GARAGE
  • THEN THE NEXT BIG PIECE IS TO RECONFIGURE ALASKA'S TICKETING AND THE ENTIRE TICKETING SPACE THERE IN THE NORTH END OF THE MAIN TERMINAL
  • PART OF THE MEZZANINE IS GOING TO BE REMOVED ABOVE ALASKA'S TICKETING
  • THIS IS GOING TO INCREASE PASSENGER PROCESSING AND BACKDROP CAPACITY, AND IT'S GOING TO PROVIDE THE TECHNOLOGY AND OTHER UPDATES TO IMPROVE THE PASSENGER EXPERIENCE
  • PROBABLY THE BIGGEST PART OF THIS IN MANY WAYS IS ENLARGING SECURITY SCREENING CHECKPOINT NUMBER FIVE FROM FIVE TO SEVEN LANES AND ALSO PROVIDING A RECOMPOSED AREA POST SECURITY WHERE PEOPLE CAN COLLECT THEIR BELONGINGS AND HEAD OFF TO THEIR FLIGHTS
  • ANOTHER BIG PART OF THIS IS UPGRADING BUILDING SYSTEMS TO MEET CODE REQUIREMENTS AND ALSO PROVIDING NEW SYSTEMS, PRIMARILY THE SMOKE CONTROL SYSTEM THAT I DISCUSSED EARLIER
  • AND THEN ONE OF THE BIG THINGS IS TO DEVELOP ARCHITECTURAL SOLUTIONS FOR USE IN THE REST OF THE MAIN TERMINAL, ALONG WITH BUILDING SYSTEMS UPGRADES THAT WILL TAKE PLACE IN PROJECTS DURING LATER PHASES
  • NEXT SLIDE, PLEASE
  • HERE'S A HIGH LEVEL PLAN SHOWING THE END RESULT
  • YOU CAN SEE THAT THE SECURITY SCREENING CHECKPOINT IN DARK GREEN IS EXPANDED TO SEVEN LANES, AND THERE'S A MUCH IMPROVED RECOMPOSE AREA THERE TO THE RIGHT AND IN THE OLIVE GREEN COLOR, THERE IS THE RECONFIGURED ALASKA TICKETING AREA
  • NEXT SLIDE, PLEASE
  • NOW, I WOULD LIKE TO SAY UP FRONT THAT ALL OF THESE RENDERINGS ARE VERY EARLY AND MAY NOT NECESSARILY REPRESENT THE FINISHED PRODUCT
  • THIS IS WHERE WE ARE AT THE 30% DESIGN PHASE RIGHT NOW
  • SO PLEASE UNDERSTAND THAT ANYWAY, AS YOU'RE COMING IN OFF OF THE DEPARTURES DRIVE INTO THE ALASKA TICKETING AREA, THIS IS A RENDERING OF HOW THE NEW TICKETING AREA IS GOING TO LOOK WITHOUT THE MEZZANINE, AND YOU CAN SEE THAT IT IS HIGH, WIDE AND BRIGHT AND DOES NOT HAVE ANY MORE LINEAR TICKET COUNTER
  • NEXT SLIDE, PLEASE
  • HERE'S A PICTURE OF THE SECURE SIDE OF SECURITY SCREENING CHECKPOINT NUMBER FIVE SHOWING THAT RECOMPOSED AREA
  • THE GENTLEMAN IN THE LOWER RIGHT IS GETTING READY TO TAKE THE RAMP UP FROM THE SECURITY SCREENING CHECKPOINT INTO CONCOURSE D AND OFF TO YOUR LEFT IS WHERE YOU WOULD TAKE THE ESCALATORS DOWN TO THE ST LEVEL TO TAKE A TRAIN OUT TO NORTH SATELLITE
  • NEXT SLIDE, PLEASE
  • AND AGAIN, HERE'S ANOTHER PROPOSED LAYOUT FOR HOW THE PROMENADE IS GOING TO LOOK OR THE BRIDGE LEVEL AFTER IT'S BEEN TRANSFIGURED, ACTUALLY FROM ITS CURRENT STATE INTO THE NEW CHECK IN AND BAG DROP LOCATION
  • NEXT SLIDE, PLEASE
  • AND I'LL PASS IT BACK TO JJ TO DISCUSS
  • YOU BET
  • YEAH
  • SO AS STEVE SHARED IN THE BEGINNING, WE'VE ALREADY RECEIVED COMMISSION AUTHORIZATION FOR TR, A NUMBER ONE, WHICH WAS THE $10 MILLION WHICH HAS ESSENTIALLY BROUGHT US THROUGH THE PROJECT DEFINITION DOCUMENT AND 30% DESIGN
  • WE ARE SEEKING TODAY AUTHORIZATION FOR FUNDING AND TENANT REIMBURSEMENT AGREEMENT FOR THE REMAINING DESIGN, WHICH IS 21 AND A HALF MILLION DOLLARS
  • AND THEN, AS I MENTIONED PREVIOUSLY, WE WOULD ACTUALLY COME BACK TO COMMISSION IN TWO DIFFERENT CONSTRUCTION PHASES
  • THE FIRST PHASE WE'RE HOPING TO BE IN THE NOT TOO DISTANT FUTURE, ACTUALLY, AS THIS IS WELL UNDERWAY IN TRYING TO TAKE ADVANTAGE OF ALASKA'S PROGRESSIVE DESIGN BUILD METHOD, WE'LL BE RETURNING TO COMMISSION HOPEFULLY SOON ON THE FIRST PHASE OF CONSTRUCTION, WHICH IN ESSENCE IS THE ENABLING WORK PREDOMINANTLY THE PROMENADE BUILD OUT THAT HE JUST SHOWED A RENDERING IN MUCH OF THE TENANT RELOCATIONS IN SOME OF THE ASSOCIATED CODE WORK
  • AND THEN IN Q THREE OF 2022, WE WOULD ANTICIPATE OR STAFF WOULD ANTICIPATE RETURNING TO COMMISSION FOR THE FULL AUTHORIZATION OF THE MAJORITY OF THE REMAINDER OF THE CONSTRUCTION WORK THAT YOU SEE ON TICKETING AND THE REMAINING PORTION BACK TO YOU, ALLEN
  • NEXT SLIDE, PLEASE
  • THIS IS A HIGH LEVEL BREAKDOWN AND GO INTO A TREMENDOUS AMOUNT OF DETAIL, BUT IT SHOWS OUR PREVIOUS REQUEST, THIS REQUEST AND THE TOTAL REQUESTED TO DATE
  • AS JJ INDICATED, WE'VE COMPLETED THE PDD AND THE 30% DESIGN, AND NOW WE WANT TO COMPLETE THE DESIGN FOR BOTH PHASES ONE AND TWO, AND WE HAVE THE APPLICABLE PORT SOFT COSTS AND ALASKA SOFT COSTS INCLUDED IN THAT NUMBER
  • NEXT SLIDE, PLEASE
  • HERE'S A HIGH LEVEL SCHEDULE SHOWING WHERE WE ARE TO DATE
  • WE ANTICIPATE GOING TO MIII HERE WITHIN THE NEXT WEEK TO PRESENT THE OVERALL PROGRAM, AND IT SHOWS TODAY'S COMMISSION AUTHORIZATION AS WELL AS OUR HOPE FOR NEXT COMMISSIONERS AUTHORIZATION REQUEST FOR THE CONSTRUCTION FUNDING FOR PHASE ONE, AS YOU CAN SEE, IT IS A FAIRLY AGGRESSIVE SCHEDULE, BUT WE'RE CONFIDENT THAT WE CAN BE FINISHED WITH THIS WORK BOTH ALASKA AND THE PORT BY THE END OF SECOND QUARTER 2025
  • ALLEN, FOR PUBLIC CLARITY, COULD YOU PLEASE EXPLAIN THE MII PROCESS? MII IS WHEN WE PRESENT THE PROJECT TO THE AIRLINES WITH AN OVERVIEW OF WHAT THE WORK IS AND WHAT THE IMPACTS ARE GOING TO BE TO THE RATES THAT THE AIRLINES ARE CHARGED
  • AND, JJ, IF I GOT ANYTHING WRONG, PIPE UP
  • IT STANDS FOR MAJORITY IN INTEREST VOTE
  • IT'S ACTUALLY A PROVISION IN THE SIGNATORY LEASE AND OPERATING AGREEMENT WITH THE AIRLINES, AND IT GIVES THEM AN OPPORTUNITY TO SHOW THEIR SUPPORT FOR THE OVERALL PROJECT OR DELAY AT A YEAR OR DELAY AT A YEAR
  • WE'RE CONFIDENT THAT WILL NOT BE THE CASE, BUT YES, THAT IS A POTENTIAL AS WELL
  • THIS IS A SPECTACULAR NEW FRONT DOOR TO THE AIRPORT
  • SO VERY GOOD
  • ARE YOU THROUGH YET, OR ARE WE STILL GOING ONE MORE SLIDE
  • YEAH
  • THIS IS JUST A HIGH LEVEL BREAKDOWN OF THE PHASING THAT WE ALREADY TALKED ABOUT BUILDING OUT THE PROMENADE AND THEN THE FOLLOW ON WORK IN TICKETING AND SCREENING CHECKPOINT NUMBER FIVE AND THE VARIOUS UPGRADES THAT ARE HAPPENING TO BUILDING SYSTEMS NEXT SLIDE
  • HERE WE GO
  • EXCELLENT PRESENTATION
  • THANK YOU, CLERK HART, WOULD YOU GO AROUND THE ROOM AND SEE IF THERE'S ANY QUESTIONS FOR THE PRESENTERS? THEY'LL DO, BEGINNING WITH COMMISSIONER STEINBRUECK
  • NO QUESTIONS
  • THANK YOU, COMMISSIONER CHO QUESTIONS AT THIS TIME
  • THANK YOU
  • THANK YOU, COMMISSIONER
  • NONE FOR ME EITHER
  • THANK YOU, COMMISSIONER BOWMAN
  • NO QUESTIONS
  • JUST A COMMENT
  • I'M EXCITED THAT THE STAFF IS BRINGING US FORWARD AND I AGREE IT'S GOING TO BE A GREAT FRONT DOOR AND WONDERFUL WORK
  • THANK YOU
  • THANK YOU, COMMISSIONERS
  • COMMISSIONER FELLEMAN IN NO FURTHER QUESTIONS
  • AND I THINK IT'S A REALLY GREAT EXAMPLE OF A COLLABORATIVE PROJECT AND WITH A HUGE PRICE TAG, BUT ONE THAT I'M GLAD WE ARE ABLE TO NAVIGATE COLLECTIVELY
  • SO GREAT
  • THEN, IS THERE A MOTION IN A SECOND TO APPROVE ITEM TEN D STILL MOVE SECOND
  • I'M SORRY
  • THAT IS TEN E
  • RIGHT
  • THAT WAS D
  • I'M SORRY
  • SO THERE IS A MOTION AND A SECOND ON THE FLOOR FROM COMMISSIONER BOWMAN, SECONDED BY COMMISSIONER CHO
  • ALL RIGHT, THEN
  • CLERK HART, WOULD YOU PLEASE CALL THE ROLL FOR THE VOTE? I WILL BEGINNING WITH COMMISSIONER STEINBRUECK
  • YES
  • THANK YOU, COMMISSIONER CHO AYE
  • THANK YOU, COMMISSIONER CALKINS
  • AYE
  • THANK YOU
  • COMMISSIONER FELLEMAN
  • AYE
  • THANK YOU
  • COMMISSIONERS BOWMAN
  • AYE
  • THANK YOU
  • YOU HAVE FIVE YESSES AND ZERO NOS FOR THIS ITEM
  • VERY GOOD THEN
  • SO WE'RE GOING TO AND THE MOTION PASSES
  • I'M SORRY
  • YES, INDEED
  • THAT IS
  • I'M TRYING TO SEE WHETHER WE ARE NOW GOING TO GO BACK TO THE FIRST ITEM
  • SO OUR NEXT ITEM IS TO COMMISSION PRESIDENT IS TEN E
  • WE'LL GO BACK TO NINE AND ONE OR THREE WITH THE NEW BUSINESS SECTION
  • THANK YOU
  • AS I WAS MISSTATING AT FIRST
  • ALL RIGHT
  • VERY GOOD
  • THEN PLEASE READ THE NEXT ITEM TO THE RECORD
  • SECOND DIRECTOR METRUCK WILL THEN INTRODUCE THE ITEM
  • THANK YOU
  • THIS IS ITEM TEN E AUTHORIZATION FOR THE EXECUTIVE DIRECTOR TO ADD SCOPE THE SEATTLE TACOMA INTERNATIONAL AIRPORT MAIN TERMINAL IMPROVEMENTS PROGRAM TO COMPLETE A PROGRAM DEFINITION DOCUMENT
  • NO FUNDING IS ASSOCIATED WITH THE REQUEST, AND THE TOTAL ESTIMATED PROGRAM COST IS 800 MILLION TO $1 BILLION
  • COMMISSIONERS, GIVEN THE MAJOR REDEVELOPMENT OF OUR NORTH MAIN TERMINAL THAT YOU WERE JUST BRIEFED ON, WE BELIEVE THAT IT WOULD BE IMPORTANT TO EXPLORE MAKING UPGRADES AND ENHANCEMENTS FOR THE REST OF THE TERMINAL AS WELL
  • THE COMMISSION AUTHORIZED PRELIMINARY DESIGN FUNDS FOR THE MAIN TERMINAL INFRASTRUCTURE UPGRADE PROGRAM AT SEA LATE LAST YEAR
  • THE PRIMARY FOCUS THEN WAS TO ENSURE SAFETY COMPLIANCE WITH THOSE BUILDING CODE ENHANCEMENTS
  • THIS ACTION AUTHORIZES ADDING SCOPE TO THE PREVIOUS ACTION AND COMPLETION OF A PROJECT DEFINITION DOCUMENT BY FOURTH QUARTER OF 2022
  • THE PLAN WILL COME BACK TO COMMISSION WITH AN UPDATE AND REQUEST FOR DESIGN FUNDS FOLLOWING COMPLETION OF THE DOCUMENT IN EARLY 2023
  • PRESENTER THIS AFTERNOON IS JOHN FREEMAN FROM CAPITAL PROJECT MANAGER JOHN
  • GOOD AFTERNOON, COMMISSIONERS AND EXECUTIVE DIRECTOR METRUCK
  • SO I'M JUST GOING TO KIND OF BUILD ONTO THE PIECE THAT JJ AND ALAN JUST PRESENTED WITH THEIRS
  • SO CLERK, IF YOU COULD GO AHEAD AND BRING UP THE PRESENTATION AND NEXT SLIDE, PLEASE
  • SO A LITTLE BIT OF HISTORY BASED ON THE MAIN TERMINAL, MAJORITY OF IT, THE MAJOR BUILD ON FROM THE EXISTING 40S TERMINALS IN THE 1970S
  • THE NORTH EXTENSION THAT THE NORTH MAIN TERMINAL IS GOING TO BE DOING THEIR UPGRADE ON WAS FROM THE 80S JANUARY
  • LINDSAY HALL WAS EXTENDED TO THE SOUTH AND AROUND 2000 AND AT THAT TIME, EVERYTHING WAS UP TO DATE FOR CODE REQUIREMENTS, LIFE, SAFETY AND EVERYTHING LIKE THAT
  • NEXT SLIDE
  • SINCE THEN, CODE HAS DEFINITELY CHANGED
  • THERE'S A LOT MORE REQUIREMENTS
  • SO ALAN HAD HIS SLIDE EARLIER, KIND OF SHOWING EVERYTHING ON THE NORTH END
  • THIS PROJECT IS GOING TO TAKE CARE OF EVERYTHING ELSE
  • WITH THE EXCEPTION OF JANERY LINDSEY HALL, IT'S MUCH MORE UP TO DATE IN GML HALL, A LOT OF BETTER FINISHES AND EVERYTHING THAT WAY
  • BUT NOW WE'RE GOING TO MAKE THE REST OF THE TERMINAL LOOK SIMILAR TO WHAT THE NORTH MAIN TERMINAL IS DOING, BUT NOT MAKING IT LOOK EXACT EITHER
  • NEXT SLIDE, PLEASE
  • SO WHEN WE CAME TO COMMISSION LAST YEAR, WE BRIEFED ON ALL THE CODE ENHANCEMENTS, THE SMOKE CONTROL SPRINKLER STEM PIPES, EMERGENCY POWER UPGRADE, WHICH IS A VERY VITAL PART DOING THAT EMERGENCY POWER UPGRADE
  • IT'S NEEDED NOT ONLY FOR THE MAIN TERMINAL, BUT IT'S ALSO CONCOURSES BC AND D CURRENTLY FEEDS THE SOUTH SATELLITE, AND WE'RE ALSO LOOKING AT PROVIDING ENOUGH CAPACITY TO REMOVE THE GENERATOR FROM CONCOURSE A AND HAVING A STANDALONE EMERGENCY GENERATOR FARM FOR JUST THIS TYPE OF NEED FOR YOUR SMOKE CONTROL AND YOUR REQUIRED LOADS WITHIN 60 SECONDS OF START
  • NOW THAT THE NORTH MAIN TURBO IS MOVING FORWARD WITH EVERYTHING WE'RE COMING HERE TODAY TO REALLY LOOK AT SOME NEW SCOPE PIECES TO ADD TO THIS, TO DO A FULL PROJECT DELIVERY DOCUMENT
  • THOSE KIND OF BIG PIECES ARE THE CRITICAL RENEWAL AND REPLACEMENT BAD CLEAN DEVICES
  • MAJORITY OF THEM ARE ALL GREATER THAN 20 TO 25 YEARS OLD, STARTING TO SHOW A LOT OF WEAR AND TEAR, AND THE MAINTENANCE COSTS ARE GOING UP EVERY YEAR AS THEY'RE TRYING TO TAKE CARE OF THOSE UNITS AND KEEP THEM IN SERVICE
  • SIGNAGE IS SOMETHING THAT HAS BEEN A BIG PUSH THROUGHOUT THE WHOLE AIRPORT
  • LET'S GET THAT SIGNAGE UPDATED, HELP THE PASSENGERS GET AROUND, HELPS THE METRUCK SCORES EVERYTHING LIKE THAT FOR THE AIRPORT DOMESTIC WATER PIPING
  • THERE WAS A PROJECT A FEW YEARS BACK THAT KIND OF UPDATED THE DOMESTIC WATER PIPING FROM THE MAIN TO KIND OF THE STANDPIPES, IF YOU WOULD SAY WITHIN THE BUILDING NOW, THIS IS THE SECOND PHASE TO REALLY GET THE REST OF THAT WATER TO THE RESTROOMS, DRINKING FOUNTAINS, ALL THE OFFICES, EVERYTHING WITHIN THE MAIN TERMINAL
  • AND THE LAST KIND OF PIECE OF THIS IS THE RESTROOM RENOVATIONS
  • MOST OF THESE RESTROOMS HAVE NOT BEEN TOUCHED FOR 30 YEARS
  • THEY DON'T MEET OUR CURRENT STANDARD
  • THEIR AIR TURNOVER RATE IS VERY LOW AS COMPARED TO WHAT WE LIKE NOW
  • SO IT'S SOMETHING THAT'S DEFINITELY NEEDED
  • WE NEED TO EXPAND THE STALLS, MAKE IT MUCH MORE USER FRIENDLY FOR EVERYONE AND GET THAT AIR CIRCULATING TO MAKE THEM SMELL BETTER, CLEANER AND ALL OF THAT
  • ANOTHER NEW SCOPE ITEM THAT WE'RE WORKING IN CONJUNCTION WITH NORTH MAIN TERMINAL IS MEZZANINE SECURITY GLASS
  • THIS IS TO HELP TO REDUCE ANY POTENTIAL FOR ACTIVE SHOOTER OR ANY OF THOSE SITUATIONS
  • WE WANT TO RAISE THE SECURITY GLASS LEVEL THROUGHOUT ANYWHERE THAT THERE'S A RAISED PLATFORM SO THAT SOMEONE CANNOT STAND THERE AND HAVE THAT ABILITY TO DO SO
  • AND KIND OF THE LAST PIECE OF IT IS ENHANCING THE PASSENGER EXPERIENCE
  • SO UPDATING SOME OF THE TERMINAL INFORMATION HUBS
  • THIS WOULD BE LOCATIONS WHERE PEOPLE WOULD BE ABLE TO GO, ASK QUESTIONS, WORK WITH THE PATHFINDERS
  • IT ALSO HAS DIFFERENT DIRECTORIES HAS APPLICATIONS FOR EVERYONE TO GO USE A PHONE IF THEY NEED TO AND EVERYTHING LIKE THAT
  • AND THEN THE LAST PIECE WITH THAT IS THE ARCHITECTURAL UPGRADES
  • AND THIS WOULD MATCH ALL OF THAT VISIONING AND WANT AND DESIRE THAT THE NORTHERN MAIN TERMINAL IS GOING FOR
  • WE WANT TO MAKE IT LOOK THE SAME THROUGHOUT THE REST OF THE MAIN TERMINAL AND TIE IT TOGETHER
  • NEXT SLIDE, PLEASE SCHEDULE AT COMMISSION TODAY, AND THEN THE PLAN IS TO EXECUTE THE SERVICE DIRECTIVE IN JANUARY OF NEXT YEAR FOR THE PROJECT DELIVERY DOCUMENT
  • HAVE THAT COMPLETE IN Q FOUR
  • AND THEN WE WOULD RETURN THE COMMISSION AROUND Q ONE WITH KIND OF THE UPDATE ON WHERE WE'RE AT HAVE ALL THE RENDERINGS, MAKE SURE THAT IT'S GOING TO BE CONSISTENT, TAKE WHATEVER DESIGN AND WORK HAS BEEN DONE BY NORTH MAIN TERMINAL AND MAKE SURE THAT THE RENDERINGS TIED TOGETHER
  • SO IT'S A CLEAR PICTURE FOR THE COMMISSIONERS TO SEE WHAT THE ENTIRE TERMINAL IS GOING TO LOOK LIKE AND THEN GET THE REQUEST AT THAT POINT IN TIME FOR THE DESIGN FUNDS AND THEN START MOVING FORWARD WITH DESIGN
  • NEXT SLIDE
  • AND SO THAT'S ALL I HAVE FOR THE PRESENTATION TODAY
  • AND I'LL GO AHEAD AND OPEN UP FOR QUESTIONS
  • THANK YOU, JOHN
  • CLERK HART, PLEASE CALL THE ROLL FOR QUESTIONS BEGINNING WITH COMMISSIONERS STEINBRUECK
  • NO QUESTIONS
  • THANK YOU
  • THANK YOU, COMMISSIONER CHO
  • NONE FOR ME
  • THANK YOU
  • THANK YOU, COMMISSIONER CALKINS
  • JUST A CLARIFICATION ON HOW THE TWO PROJECTS WE'VE JUST BEEN TALKING ABOUT INTEGRATE
  • IT APPEARS AS IF THE PROJECT THAT WE'RE TALKING ABOUT RIGHT NOW COVERS A FAIR BIT WITH REGARD TO BAGGAGE CLAIM, BUT I BELIEVE THAT THE EARLIER PROJECT THAT WE WERE TALKING ABOUT DOES NOT
  • SO DOES THIS PROJECT CONTEMPLATE THE AREA BAGGAGE CLAIM UNDER THE AREA THAT IS BEING REDESIGNED AS PART OF THE NORTH MAIN TERMINAL
  • SO THE NORTH MAIN TERMINAL PROJECT WILL BE DOING THE CEILING AND LIGHTING AND BAD CLAIM ABOVE BAD CLAIMS 15 AND 16
  • AND THEN THERE'S A SEPARATE PORT PROJECT THAT WILL BE STARTING NOTEBOOK IN Q ONE OF NEXT YEAR THAT WILL ACTUALLY BE TAKING THOSE FROM THE HORIZONTAL DESIGN TO THE SLOPE PLATE DESIGN TO MATCH THE REST OF THE BAGGAGE CLEAN DEVICES
  • SO THERE'S A SEPARATE PROJECT MOVING FORWARD FOR THAT AND THEN ANYTHING ELSE THAT WE NEED TO DO FOR CONSISTENCY
  • WE WOULD USE THAT THAT WOULD BE AS PART OF THIS NEXT PROJECT TO MAKE SURE THAT'S ALL THERE
  • BUT THERE'S PIECES AND PARTS KIND OF THROUGH THREE DIFFERENT PROJECTS TO MAKE SURE IT'S ALL CONSISTENT, LOOKS THE SAME
  • AND THEN ALL OF THE EMERGENCY POWER FROM THIS PROJECT WOULD ACTUALLY FEED ALL OF THE SMOKE CONTROL FOR THE NORTH MAIN TERMINAL
  • SO IT'S SOMETHING THAT WE'RE WORKING ON WITH BOTH FIRE AND BUILDING DEPARTMENT THAT THEY WOULD HAVE TO USE KIND OF A TEMPORARY GENERATOR TO TEST IT FOR NOW AND THEN THIS PROJECT WOULD PROVIDE ALL OF THAT POWER FOR LATER ON
  • OKAY
  • THANK YOU
  • YES, SIR
  • THANK YOU, COMMISSIONERS
  • COMMISSIONER BONE
  • NO, I DON'T HAVE ANY QUESTIONS
  • THANK YOU
  • THANK YOU, COMMISSIONER FELLEMAN
  • I'D LIKE TO BUILD ON WHAT COMMISSIONER CALKINS WAS ASKING ABOUT WITH OUR ART PROGRAM THAT COMMISSIONERS STEINBRUECK HAS AND BOWMAN HAS SO MUCH BROUGHT LIFE INTO
  • WE THINK ABOUT PLACES WHERE PEOPLE CAN OBSERVE ART AT THE AIRPORT
  • AND MY EXPERIENCE OFTEN HAS BEEN ALL I COULD DO TO GET TO THE GATE AND STOP HAVING MY HEART PALPITATING
  • BUT REALLY ONE OF THE PLACES THAT YOU COULD REALLY, OF COURSE, WE WANT PEOPLE TO GET EARLY AND SPEND MONEY AT THE ADR AND RELAX IN OUR BEAUTIFUL NEW FACILITIES
  • AND PERHAPS MORE AND MORE, THAT WILL BE THE CASE
  • AND THE ART TRULY IS BEAUTIFUL
  • BUT ONE OF THE PLACES WHERE PEOPLE ARE OFTEN STUCK IS A BAGGAGE CLAIM
  • AND THAT'S WHERE YOU REALLY HAVE TIME TO SMELL THE ROSES
  • AND IT IS ONE OF THE MOST DISMAL ASPECTS OF THE AIRPORT, WITH THE LOWEST CEILINGS, THE WORST LIGHTING AND REALLY BARE WALLS
  • AND SO I'M JUST WONDERING AND JUST THE ARCHITECTURAL PIPING IS THAT DARK BROWN
  • SO EVERYTHING ABOUT THE PLACE IS CLAUSTROPHOBIC AND POORLY LIT
  • AS YOU CAN TELL, I'M A BIG FAN
  • I'M JUST WONDERING, AS PART OF THIS PROCESS, IT SEEMS TO ME THAT IT'S A REAL CHANCE TO LIGHT THE PLACE UP AND REALLY MAKE IT A GALLERY BECAUSE OF THE TIME PEOPLE HAVE TO REALLY SMELL THE ROSES
  • I SEE LANCE LITTLE HAS SOMETHING YOU MIGHT WANT TO ADD
  • YES
  • I'M NOT SURE IF HEBA IS ON THE LINE, HAD THE DISCUSSION WITH HER, ACTUALLY SEVERAL MONTHS AGO, AND SHE ACTUALLY HAS A PLAN TO LIGHTEN AND BRIGHTEN THAT ENTIRE AREA
  • AND I'M HOPING WE'LL GET AN OPPORTUNITY TO ACTUALLY SHOW YOU SOME OF THE RENDERINGS AND THE PLANS THAT WE ACTUALLY HAVE FOR THE BAGGAGE CLAIM ERA
  • WE ACTUALLY SURE YOU'RE SENTIMENT, BUT WE HAVE A PLAN TO RECTIFY THAT
  • AS JEFFREY'S HAND, HE MIGHT HAVE SOME MORE DETAILS, BUT WE SURE YOUR SENTIMENT, BUT WE ACTUALLY HAVE A PLAN TO RECTIFY THAT SITUATION
  • THANK YOU
  • IS THERE JEOPARDY HAVING SOMETHING TO ADD TO THAT? WHO IS NOW DOCTOR THE ART PROGRAM
  • THANKS FOR THE COMMISSIONER
  • ACTUALLY, TOM MCGREGOR IS GOING TO COME FORWARD
  • I THINK DECEMBER 14 MEETING FOR THE ANNUAL REPORT, AND HE'S GOING TO PRESENT MORE INFORMATION
  • ROME, BUT MAKE SURE YOU RESPOND THE QUESTION
  • BUT THE ANSWER IDEA IS TO PUT TOGETHER A FIVE YEAR PROGRAM THAT COVERS ALL THE ART OPPORTUNITIES THROUGH THE ENTIRE CAMPUS
  • AND HE REPRESENTED THAT
  • HE STARTED WORKING ON THAT
  • SO I MAKE SURE YOU RESPOND THAT QUESTION
  • PROVIDE A VISION TO YOU ON DECEMBER 14
  • THAT'S GREAT
  • YOU MIGHT WANT TO HAVE A JOIN HEATHER AS WELL
  • YEAH
  • MAKE SURE SHE JOINED
  • ARE THERE ANY OPPORTUNITIES TO RAISE THAT CEILING OR ARE WE UP INTO UTILITY WORLD? THERE IS NO OPPORTUNITIES
  • REALLY SORRY, LANDSCAPE
  • WE'RE ACTUALLY LOOKING AT OTHER OPTIONS TO MAKE THE CEILINGS ACTUALLY LOOK AS IF THEY'RE NOT LOW
  • SO WE'RE LOOKING AT THOSE OPTIONS
  • JUST PLEASE GET RID OF THE FLUORESCENT LIGHTING
  • YOU JUST CHANGE THE BULBS
  • IN THE MEANTIME, IT WILL GO GREAT DISTANCE
  • I CAN SAY THAT BOTH PROJECTS ARE WORKING AND WE ACTUALLY HAVE EVERY MONDAY AFTERNOON WE HAVE A MEETING THAT IS PURELY ON ARCHITECTURAL VISIONING AND WORKING BETWEEN HOK AND BOTH PROJECTS TO MAKE SURE THAT IT'S TIED TOGETHER FOR BRIGHTENING UP, CLEANING IT UP A LOT MORE INFRASTRUCTURE WITH THE ELECTRICAL FOR ALL THE LIGHTING AND EVERYTHING LIKE THAT
  • AND THAT HEATHER IS PUSHING FOR EVERYTHING SHE CAN TO RAISE THE CEILING WHERE POSSIBLE AND USE A LOT OF WHITES AND WOOD LOOKS AND EVERYTHING IN THAT AREA
  • SO IT'S A MONDAY MEETING THAT WE ARE STANDING ALL THE WAY THROUGH JANUARY OF NEXT YEAR BETWEEN THE PROJECTS COMMISSIONERS TO MAKE SURE THAT WE'RE WORKING THROUGH ON THAT ARCHITECTURAL PIECE
  • VERY GOOD
  • SEEMS LIKE ONE OF THOSE PLACES YOU CAN GET GREAT SATISFACTION WITH JUST A LITTLE BIT OF LOVE
  • YOU'LL SEE A LOT OF IMPROVEMENT
  • ALL RIGHT THEN
  • THANK YOU SO MUCH
  • CLERK HART, IS THERE A MOTION AND A SECOND FOR ITEM TEN E? DON'T ALL CALL OUT AT ONCE
  • IS THERE A MOTION AND A SECOND FOR TEN E
  • SO MOVED
  • SECOND, THE MOTION HAS BEEN MOVED
  • AND SECONDED CLERK HART, WOULD YOU PLEASE CALL THE ROLL FOR THE VOTE ON ITEM TEN E FOR THE VOTE ON TEN E BEGINNING WITH COMMISSIONERS STEINBRUECK
  • YES
  • THANK YOU, COMMISSIONER CHO
  • AYE
  • THANK YOU, COMMISSIONER CALKINS
  • AYE
  • THANK YOU, COMMISSIONER BOWMAN
  • THANK YOU, COMMISSIONER FELLEMAN
  • AYE
  • THANK YOU
  • YOU HAVE FIVE YESES AND ZERO NOS FOR THIS ITEM
  • VERY GOOD
  • THEN THE MOTION PASSES
  • SO AT THIS TIME, RATHER THAN GOING ON TO ITEM TEN F, WE'RE GOING TO NOW GO BACK
  • IS THAT THE PLAN? SO THE MOTION WAS THAT WE WOULD NOT GO BACK TO NINE A OR B UNTIL AT THE END OF NEW BUSINESS
  • SO WE ACTUALLY STILL HAVE F, G AND H
  • OKAY
  • MY CONFUSION
  • MY PRODUCT
  • SORRY ABOUT THAT
  • VERY GOOD
  • THEN MOVING ON TO ITEM TEN F
  • CLERK HART
  • PLEASE READ THE NEXT ITEM AND THE EXECUTIVE METRUCK WILL THEN INTRODUCE IT
  • YES
  • AND I'M SORRY
  • I DON'T KNOW IF I MISSED IT OR NOT
  • JUST NOTING THAT LAST MOTION DID PASS FOR THE RECORD
  • AND THEN TEN F IS INTRODUCTION OF RESOLUTION NUMBER 3796, A RESOLUTION AUTHORIZING THE ISSUANCE AND SALE OF GENERAL OBLIGATION AND REFUNDING BOND SERIES 2022 AND THE AGGREGATE PRINCIPAL AMOUNT NOT TO EXCEED $135,000,000 FOR THE PURPOSE OF FINANCING OR REFINANCING CAPITAL IMPROVEMENTS TO PORT FACILITIES AND REFUNDING CERTAIN OUTSTANDING OBLIGATIONS OF THE PORT AND AUTHORIZING A DESIGNATED PORT REPRESENTATIVE TO APPROVE CERTAIN MATTERS RELATING TO THE BONDS
  • COMMISSIONERS, THIS RESOLUTION AUTHORIZES THE SALE IN ISSUANCE OF GENERAL OBLIGATION BONDS
  • THESE BONDS WERE IDENTIFIED IN THE 2022 DRAFT PLAN OF FINANCE AND WILL PROVIDE FUNDING FOR PROJECTS INCLUDING COMPLETION OF THE TERMINAL FIVE
  • MODERNIZATION WILL FINANCE AND REFUND OUTSTANDING DEBT FOR DEBT SERVICE SAVINGS
  • THE PRESENTER IS ELIZABETH MORRISON, DIRECTOR OF CORPORATE FINANCE
  • ELIZABETH
  • GOOD AFTERNOON
  • AS STEVE MENTIONED, THE DRAFT PLAN OF FINANCE, PRESENTED ON OCTOBER 26, ANTICIPATED THE USE OF 292,000,000 OF GENERAL OBLIGATION BONDS TO FUND CAPITAL INVESTMENTS FOR BOTH SUPPORT AND THE NORTHWEST SEAPORT ALLIANCE
  • THIS WOULD BE THE FIRST TRANCHE OF THAT FUNDING
  • AUBREE, WOULD YOU MIND THE PRESENTATION, PLEASE? THANK YOU
  • NEXT SLIDE, PLEASE
  • AND NEXT SLIDE, PLEASE
  • SO THE BONDS WOULD ACCOMPLISH THREE THINGS
  • FIRST, IT WOULD REFUND BONDS FIRST ISSUED IN 2011 FOR DEBT SERVICE SAVINGS, AND WE ANTICIPATE THE SAVINGS WILL BE ABOUT $2 MILLION
  • WE'LL ALSO REFINANCE SOME COMMERCIAL PAPER THAT WAS ISSUED TO MAKE IMPROVEMENTS AT TERMINAL 91, AND THAT'S ABOUT $17.7 MILLION
  • AND THEN THIRD, IT WILL PROVIDE FUNDING FOR NEW CAPITAL INVESTMENTS IN AN ESTIMATED AMOUNT OF $75 MILLION
  • NEXT SLIDE, PLEASE
  • THE SPECIFIC PROJECTS WE EXPECT TO FUND WITH THESE BONDS ARE THE COMPLETION OF TERMINAL FIVE MODERNIZATION, WHICH IS CURRENTLY UNDER CONSTRUCTION
  • WE ESTIMATE ABOUT 40 TO 45 MILLION OF THE BOND PROCEEDS WILL BE APPLIED TO THIS PROJECT
  • THE REST OF THE BOND PROCEEDS MAY BE USED FOR ANY PROJECT THAT IS ELIGIBLE FOR TAX LEVY OR GEO BOND FUNDING, AND THAT LIST OF PROJECTS WAS PROVIDED IN THE OCTOBER 26 PRESENTATION ON THE TAX LEVY
  • THE MOST LIKELY CANDIDATES ARE FOUR LARGE PROJECTS THAT ARE CURRENTLY IN DESIGN, INCLUDING PIER 66, SHORE POWER, TERMINAL 91, BIRTH, SIX, AND EIGHT REDEVELOPMENT, THE TERMINAL 91 UPLANDS, PHASE ONE AND FISHERMAN'S TERMINAL MARITIME INNOVATION CENTER
  • AND JUST AS A REMINDER, THE BOND PROCEEDS OR ANY FUNDING CANNOT BE SPENT ON PROJECTS UNLESS THOSE PROJECTS HAVE BEEN PROPERLY AUTHORIZED
  • NEXT SLIDE, PLEASE
  • SO RESOLUTION 37 96 AUTHORIZES THE SALE AND ISSUANCE OF THE GENERAL OBLIGATION BONDS
  • THE RESOLUTION IS SIMILAR IN ALL MATERIAL RESPECTS WITH OTHER GEO BOND RESOLUTIONS AND DELEGATES TO EITHER THE EXECUTIVE DIRECTOR OR THE CHIEF FINANCIAL OFFICER THE ABILITY TO APPROVE THE DETAILS OF THE BOND SALE
  • WE EXPECT THE BONDS WILL BE SOLD AS TAXABLE, MEANING THAT THE INTEREST SUPPORT PAYS TO INVESTORS IS SUBJECT TO FEDERAL INCOME TAX
  • AND I'LL ELABORATE FOR A MINUTE ON THAT
  • THE POOR GENERALLY ISSUES TAX EXEMPT PRIVATE ACTIVITY BONDS
  • THAT'S A NICHE WITHIN THE TAX EXEMPT BOND MARKET FOR AIRPORTS AND DOCK FACILITIES
  • MANY OF THE PORT PORTS PROJECTS QUALIFY FOR THAT STATUS
  • WE DO HAVE A COUPLE OF PROJECTS ON OUR LIST THAT DO NOT QUALIFY SPECIFICALLY TERMINAL 91, UPLANDS AND THE MARITIME INNOVATION CENTER
  • THOSE DON'T QUALIFY FOR TAXES AND BONDS AT ALL
  • AND THEN WE'VE ALSO LEARNED OVER TIME THROUGH EXPERIENCE THAT SOMETIMES FACILITIES THAT QUALIFY AT THE BEGINNING CREATE UNDUE CONSTRAINTS AND LIMIT BUSINESS OPPORTUNITIES
  • FOR EXAMPLE, WHEN TERMINAL FIVE WAS VACANT, SOME OF THE INTERIM USES THAT COULD HAVE GENERATED REVENUES WERE NOT ALLOWABLE UNDER THE TAX CODE REGULATIONS
  • SO TAXABLE BONDS CREATE A GREAT DEAL OF FLEXIBILITY AND IN THE CURRENT MARKET ARE QUITE REASONABLY PRICED, SO WE WILL LIKELY SELL THE BONDS AS TAXABLE
  • THE RESOLUTION DOES PROVIDE THE FLEXIBILITY TO INCLUDE A TAX EXEMPT SERIES
  • AS WE GET TO THE MARKET, IT APPEARS THAT THE COST BENEFIT DYNAMICS HAVE SHIFTED AND THERE'S A BENEFIT TO DOING A TAX EXEMPT SERIES
  • RIGHT NOW, WE BELIEVE THE EFFICIENCY OF ONE SERIES SOLD ON A TAXABLE BASIS IS A GOOD BENEFIT FOR THE PORT
  • THE PROCEEDS WILL ALSO PROVIDE FUNDING FOR RELATED COST OF ISSUANCE, AND WE EXPECT THE BONDS TO BE SOLD COMPETITIVELY
  • THE BONDS CAN BE SOLD WITHIN THE DELEGATION LIMITS ESTABLISHED IN THE RESOLUTION, WITH A MAXIMUM PAR AMOUNT OF $135,000,000, MAXIMUM INTEREST RATE OF FOUR AND A HALF PERCENT, A MINIMUM SAVINGS TARGET ON THE 2011 BONDS OF 2%
  • AND THEY MUST BE SOLD WITHIN SIX MONTHS OF THE ADOPTION OF THE RESOLUTION
  • AND IF WE EXCEED ANY OF THOSE PARAMETERS, THEN WE WILL NEED TO GET COMMISSION AUTHORIZATION TO CHANGE THOSE NEXT SLIDE, PLEASE
  • NEXT STEPS ARE ADOPTION OF RESOLUTION 37 96 ON NOVEMBER 16
  • WE HAVE RATING AGENCY MEETINGS SCHEDULED FOR DECEMBER 7
  • WE ANTICIPATE SELLING THE BONDS IN MID JANUARY, AND WE'RE TARGETING THAT TIME FRAME BECAUSE IT'S A TIME WHERE THERE'S LIMITED BOND ISSUANCE, AND SO THE SUPPLY DEMAND DYNAMICS TEND TO FAVOR ISSUERS DURING THAT TIME PERIOD
  • SO WE'RE HOPING TO GET TO MARKET
  • THEN WITH THAT, I'M HAPPY TO ANSWER ANY QUESTIONS
  • OKAY, COMMISSIONERS, PLEASE UNMUTE YOURSELF
  • AND OF COURSE, WE HAVE A GREAT FEELING OF QUESTIONING OF ELIZABETH'S CANTER WITH US
  • I'M SURE WE HAVE ALL SORTS OF REASONS TO QUESTION HER INSIGHTS AND GUIDANCE AS ALWAYS
  • THANK YOU SO MUCH FOR YOUR DUE DILIGENCE AND GUIDING US THROUGH THIS ORNATE PROCESS
  • SHALL WE SAY, PLEASE CALL THE ROLL FOR QUESTIONS PER CARD
  • THANK YOU
  • BEGINNING WITH COMMISSIONER STEINBRUECK
  • NO QUESTIONS
  • THANKS
  • THANK YOU, COMMISSIONER CHO
  • I DON'T HAVE ANY QUESTIONS
  • I ALSO WANT TO ECHO THE SENTIMENTS OF COMMISSIONER FELLEMAN
  • THANK YOU, ELIZABETH, FOR ALWAYS BEING A GUIDING HAND ON WHAT IS OFTENTIMES VERY COMPLICATED MECHANISM THAT WE DEAL WITH
  • SO THANK YOU
  • THANK YOU, COMMISSIONER CHO
  • COMMISSIONER CALKINS
  • NO QUESTIONS FOR ME
  • THANK YOU
  • THANK YOU, COMMISSIONER BOWMAN
  • NO QUESTIONS
  • JUST A COMMENT
  • ALSO, ELIZABETH, THANK YOU SO MUCH FOR ALL OF YOUR WORK OVER THE YEARS
  • IT'S BEEN A PLEASURE TO WORK WITH YOU
  • AND I'VE ALWAYS HAD JUST AN EXTRAORDINARY AMOUNT OF CONFIDENCE IN YOUR ABILITY
  • YOU JUST HAVE SUCH A LEVEL HEAD
  • YOU HAVE DONE YOUR HOMEWORK
  • YOU'VE REALLY GUIDED THE PORT OVER MANY YEARS
  • AND I JUST WANTED TO SAY HOW MUCH I APPRECIATE THAT
  • AND THANK YOU FOR YOUR WORK ON THIS ISSUANCE AS WELL
  • THANK YOU, COMMISSIONERS BOWMAN
  • MOVING TO COMMISSIONER FELLEMAN
  • NO FURTHER QUESTIONS
  • I'M JUST CONCERNED IF SHE EVER WANTED TO TRICK US
  • WE HAVE SUCH BUILT THAT SHE'S BUILT SO MUCH FAITH WITH US THAT WE FEEL VULNERABLE
  • SO IS THERE A MOTION IN A SECOND FOR THE APPROVAL OF ITEM TEN? F INTRODUCTION OF RESOLUTION NUMBER 37 96
  • SO IF THERE'S NO FURTHER DISCUSSION, CLERK HART, PLEASE CALL THE ROLL FOR THE VOTE
  • THANK YOU
  • BEGINNING WITH COMMISSIONER STEINBRUECK
  • YES
  • THANK YOU, COMMISSIONER CHO
  • AYE
  • THANK YOU, COMMISSIONER CALKINS
  • AYE
  • THANK YOU, COMMISSIONER BOWMAN
  • AYE
  • THANK YOU, COMMISSIONER FELLEMAN
  • AYE
  • THANK YOU
  • YOU HAVE FIVE YESES AND ZERO NOS FOR THIS ITEM
  • WELL, THEN THE MOTION PASSES AS ALWAYS
  • THANK YOU, ELIZABETH
  • THANK YOU
  • SO PLEASE READ THE NEXT ITEM INTO THE RECORD AND EXECUTIVE METRUCK WILL THEN INTRODUCE IT
  • THANK YOU
  • THIS IS ITEM TEN G AUTHORIZATION FOR THE EXECUTIVE DIRECTOR TO SPEND ENVIRONMENTAL REMEDIATION FUNDS FOR 2022 IN THE AMOUNT OF $16 MILLION AND APPROVE A FIVE YEAR SPENDING PLAN FOR $114,000,000 FOR THE ENVIRONMENTAL REMEDIATION LIABILITY PROGRAM FOR 2022 THROUGH 2026, OF WHICH AN AMOUNT ESTIMATED NOT TO EXCEED $30 MILLION WILL BE OBLIGATED DURING 2022 TO BE SPENT IN FUTURE YEARS
  • COMMISSIONERS, THIS IS ANOTHER AUTHORIZATION YOU SEE ON A YEARLY BASIS
  • ENVIRONMENTAL REMEDIATION PROJECTS DEFINE AND MINIMIZE THREATS TO THE ENVIRONMENT CAUSED BY THE EFFECTS OF HISTORIC INDUSTRIAL ACTIVITY PROPERTIES ACQUIRED BY THE PORT PRIOR TO PORT OPERATIONS AND PRIOR TENANT OPERATIONS
  • THE PORT IS INVESTING HEAVILY IN QUITE A FEW PROJECTS TO IMPROVE THE ENVIRONMENT AND ADDRESS IMPACTS FROM AN INDUSTRIAL ACTIVITY
  • TODAY WE SEEK YOUR APPROVAL FOR A FIVE YEAR SPENDING PLAN TO ADDRESS THE NUMBER OF THESE CLEAN UP ACTIVITIES
  • THE PRESENTERS THIS AFTERNOON ARE CATHY BONNET, SENIOR MANAGER, ENVIRONMENTAL PROGRAMS AND MEGHAN KING, SENIOR ENVIRONMENTAL PROGRAMS MANAGER
  • KATHY
  • GOOD AFTERNOON, COMMISSIONERS AND EXECUTIVE DIRECTOR METRUCK
  • I'M KATHY BONNIC AND I'M HERE WITH MEGAN KING, AND WE'RE HERE TODAY TO ASK FOR THE ANNUAL BUDGET AUTHORIZATION FOR THE ENVIRONMENTAL REMEDIATION LIABILITY PROGRAM
  • WE'RE ASKING TO AUTHORIZE $16 MILLION FOR 2022
  • THE PURPOSE OF THIS PROGRAM IS TO ADDRESS LEGACY CONTAMINATION ON POOR PROPERTY
  • IT'S NOT PART OF A COMPLIANCE PROGRAM THAT MANAGES CURRENT OPERATIONS, SUCH AS THE STORMWATER PROGRAM BUT ADDRESSES HISTORIC CONTAMINATION
  • IT'S AN ANNUAL BUDGET WHICH IS NEEDED BECAUSE THIS WORK FALLS UNDER EXPENSE, EVEN THOUGH THE PROJECTS ARE MULTIYEAR PROJECTS THAT CAN LAST FOR DECADES
  • THE SCOPE OF THE WORK AND CONTRACTING IS AUTHORIZED UNDER SEPARATE AUTHORIZATIONS, AS MOST OF THE WORK IS PERFORMED UNDER THE OVERSIGHT OF OUR REGULATORY AGENCY, SUCH AS EPA OR ECOLOGY, AND OUR LEGAL AGREEMENTS, WHICH WE HAVE TO GO TO COMMISSION TO GET AUTHORIZATION TO SIGN, AND MANY OF THEM ALSO INVOLVE COST SHARING AGREEMENTS WITH OTHER RESPONSIBLE PARTIES
  • THE PORT IS INVOLVED, LIKE STEVE SAID IN MOST OF THESE PROJECTS DUE TO OUR OWNERSHIP OF THE PROPERTY AND MANY OF THE PROPERTIES WERE CONTAMINATED BEFORE PORT OWNERSHIP, AND THE PORT PURCHASED THEM AS PART OF A BROWNFIELD DEVELOPMENT IN WHICH UNDERUTILIZED CONTAMINATED PROPERTIES WERE PUT BACK INTO ECONOMIC USE, AND IT SUPPORTED THE CLEANUP OF THE PROPERTIES
  • THIS WAS THE CASE FOR THE EXPANSION OF TERMINAL FIVE AND TERMINAL 18 IN THE PAST BECAUSE MOST OF THE CONTAMINATION WAS CAUSED BY OTHERS, COST RECOVERY IS IMPORTANT, BUT TO RECOVER COSTS, WE NEED TO PERFORM THE WORK FIRST
  • THE LARGEST COST THAT WILL BE INCURRED IN 2022 UNDER THIS PROGRAM IS THE CONTINUATION OF THE DESIGN WORK FOR BOTH THE UPPER AND THE MIDDLE REACH OF THE LOWER DUWAMISH RIVER, WHICH IS A FIVE MILE SECTION OF RIVER BETWEEN THE TURNING BASIN AND THE WEST SEATTLE BRIDGE
  • AND WE'RE DOING THIS WORK WITH OUR PARTNERS, THE CITY, COUNTY AND BOEING
  • ANOTHER ONE IS THE COMPLETION OF THE HABITAT PROJECT AT THE FORMER TERMINAL 117 CLEANUP SITE
  • THIS HABITAT AND PUBLIC ACCESS SITE IS LOCATED IN THE SOUTH PARK COMMUNITY, AND IT SHOULD BE DONE THIS YEAR OR IN 2022
  • THE ENVIRONMENTAL REMEDIATION LIABILITY SITES ARE AT VARIOUS STAGES OF INVESTIGATION AND OR CLEAN UP, AS WAS DESCRIBED IN THE COMMISSION DEMO A NUMBER OF THESE SITES
  • ABOUT HALF OF THE SITES ARE LOCATED ALONG THE DUWAMISH WATERWAY 7TH SITE OR THE EAST WATERWAY 7TH SITE
  • A NUMBER OF THEM ARE IN VARIOUS STAGES
  • LIKE WE SAID, WE'VE GOT SOME GOOD NEWS AND THAT SOME OF THEM ARE COMING TO COMPLETION
  • WE COMPLETED THE CLEANUP AT TERMINAL 30 AND AT LAURA LAKE THOSE SITES
  • AND WE'VE ALSO GOT SOME NEW SITES LIKE TERMINAL 25 SOUTH, WHERE WE'LL BE COMING BACK TO YOU IN THE FIRST QUARTER OF 2022 TO ASK FOR AUTHORIZATION TO SIGN IN ORDER TO DO THE INVESTIGATION FOR A CLEANUP AT THAT SITE
  • WITH THAT, DO YOU HAVE ANY QUESTIONS, SANDRA? DO YOU HAVE ANY QUESTIONS? ANYTHING YOU'D LIKE TO ADD TO THIS? NO
  • THIS IS AN IMPORTANT PROGRAM FOR THE PORT TO ENGAGE IN, AND WE PLAY A LARGE ROLE IN THE REGION AND HELPING CLEAN UP THESE CONTAMINATED SITES
  • SO APPRECIATE YOUR SUPPORT
  • THAT WAS MY SENTIMENT
  • EXACTLY
  • IF ANYBODY THOUGHT THAT A PORT WAS A POLLUTION GENERATOR, WHEN YOU LOOK AT THE AMOUNT OF MONEY WE SPEND ON CLEANING UP OFTEN OTHER PEOPLE'S PROBLEMS, I'M ALWAYS IMPRESSED
  • AND IN FACT, IT'S THIS PRICE TAG THAT REALLY LED ME TO CHAMPION THE IDEA OF THE PORT HAVING GREEN JOBS AS BEING PART OF OUR MISSION
  • IN THAT WHEN YOU SEE, OBVIOUSLY, SOME CONTRACTORS ARE MAKING A LOT OF MONEY DOING THIS WORK
  • AND SO I SEE THIS SORT OF BASIC, FUNDAMENTAL ROLE OF BEING A PORT IS SUPPORTING THIS KIND OF EFFORT
  • AND I'M GLAD WE SEE KAREEM JOBS AS BEING VERY MUCH IN OUR PORTFOLIO
  • SO VERY GOOD
  • THEN, CLARKE, WOULD YOU PLEASE CALL THE ROLE FOR QUESTIONS ON THIS ITEM? YES
  • BEGINNING WITH COMMISSIONER STEINBRUECK
  • NO QUESTIONS
  • THANK YOU
  • THANK YOU, COMMISSIONER
  • COMMISSIONER CHO, I'M GOOD
  • THANK YOU SO MUCH FOR ALL YOUR GREAT WORK
  • THANK YOU, COMMISSIONER
  • TO COMMISSIONER CALKINS
  • NO QUESTIONS
  • THANK YOU, COMMISSIONER BOWMAN
  • I JUST TAKE A MINUTE TO GET A COMMENT JUST TO THANK THE STAFF
  • I THINK THIS IS COMMISSIONER BOWMAN STARTED TO ALLUDE TO THIS IS ONE OF THE REALLY GREAT STORIES ABOUT THE PORT OF SEATTLE THAT SEEMS TO CONTINUE TO GET NOT TOLD
  • AND I WOULD SAY THIS IS ONE OF THE YEARS IN PARTICULAR, THERE'S BEEN QUITE A BIT OF CRITICISM OF THE PORT PUBLICLY WHERE PEOPLE HAVE ACTIVELY SAID THAT THE PORT COURT IS INACCURATELY, CLAIMED THAT THE PORT WAS THE BIGGEST POLLUTER IN THE STATE OF WASHINGTON
  • THAT IS NOT ACCURATE AND ALSO THAT WE ARE NOT COMMITTED TO ENVIRONMENTAL CLEANUP, WHICH IS NOT ACCURATE AS WELL
  • I THINK THAT THIS ANNUAL ALLOCATION AND IT IS NOT THE ONLY THING THAT WE DO
  • BUT THE ANNUAL ALLOCATION FOR THE EARLY PROJECTS, AS THEY'RE KNOWN, IS REALLY THE PORT'S COMMITMENT TO AGAIN, ENVIRONMENTAL REMEDIATION AND MAKING SURE THAT WE ARE DOING OUR PART
  • SO OVER THE YEARS, I'VE REALLY APPRECIATED THE STAFF'S DILIGENCE IN BRINGING THESE PROJECTS FORWARD
  • IN SOME CASES, HAVING TO DO A LOT OF LEGAL EXPLORATION IS TO MAKE SURE THAT THE COST SHARE IS FAIR
  • IN MANY OF THESE CASES, THIS IS A LEGACY INDUSTRIAL CONTAMINATION OF WHICH THE PORT WAS ONLY ONE PARTY
  • SO ALL THAT SAID, YOU ALL CAN CONTINUE TO GET OUT THE STORY ABOUT THE GOOD WORK THAT OUR ENVIRONMENTAL TEAM DOES AND THE HUNDREDS OF MILLIONS OF DOLLARS THAT HAS BEEN INVESTED BY THE PORT OF SEATTLE TO CLEAN UP THE LAND AND WATER AROUND OUR OPERATIONS
  • AGAIN, I THINK IT'S JUST A REALLY IMPORTANT STORY TO TELL
  • AND WHILE THIS IS JUST A DOLLAR AMOUNT, IT REALLY DOES HAVE AN IMPACT ON THE QUALITY OF LIFE, PARTICULARLY FOR THOSE THAT LIVE AROUND OUR FACILITIES
  • SO THANK YOU ALL FOR YOUR GOOD WORK
  • THANK YOU, COMMISSIONERS BOWMAN
  • COMMISSIONERS FELLEMAN, I HAVE NO FURTHER QUESTIONS, BUT I WOULD JUST LIKE TO RESTATE THE REQUEST HERE TO SPEND ENVIRONMENTAL REMEDIATION FUNDS FOR 2022 IN THE AMOUNT OF $16 MILLION AND APPROVE A FIVE YEAR SPENDING PLAN FOR $114,000,000 FOR THE ENVIRONMENTAL REMEDIATION LIABILITY PROGRAM FOR 2022 TO 2026, OF WHICH AN AMOUNT ESTIMATED NOT TO EXCEED $30 MILLION WILL BE OBLIGATED DURING 2022 TO BE SPENT IN FUTURE YEARS
  • NOW, OBVIOUSLY, WE'RE NOT NECESSARILY GOING TO SPEND ALL THAT MONEY, BUT WE ARE AUTHORIZING THAT TO SHOW THAT WE ARE PREPARED TO DO OUR PART REGARDLESS, YET TO BE DEFINED WHAT THAT IS
  • BUT THIS IS NOT CHUMP CHANGE
  • THANK YOU FOR YOUR HELP IN LETTING US CONTINUE TO BE A RESPONSIBLE OPERATOR IN OUR WATERWAYS
  • CLERK HART, PLEASE CALL THE ROLL FOR THE VOTE
  • DO WE HAVE A MOTION ON THE FLOOR? I DON'T KNOW THAT WE HAVE A MOTION, DID WE? NO QUESTIONS
  • FIRST, MY BAD
  • PLEASE CALL
  • DO I HAVE A MOTION AND A SECOND, PLEASE? SECOND
  • THANK YOU
  • SO, CLERK HART, PLEASE CALL THE ROLL
  • THANK YOU
  • BEGINNING WITH COMMISSIONER STEINBRUECK
  • YES
  • THANK YOU
  • COMMISSIONER CHO
  • YES
  • THANK YOU
  • COMMISSIONER CALKINS
  • AYE
  • THANK YOU
  • COMMISSIONER BOWMAN
  • AYE
  • THANK YOU, COMMISSIONER FELLEMAN
  • AYE
  • THANK YOU
  • YOU HAVE FIVE GUESSES AND ZERO NOS FOR THIS ITEM
  • THE MOTION THEN PASSES
  • THANK YOU SO MUCH FOR YOUR EFFORTS
  • WE'RE GOING TO MOVE ON NOW TO ITEM TEN H
  • ALL RIGHT
  • SO I'M SORRY, I CAN GO AHEAD AND READ THIS INTO THE RECORD, MR COMMISSION PRESIDENT
  • AND THEN WE HAVE INTERIM CHIEF OF STAFF AARON PATRICK AVAILABLE TO INTRODUCE THE ITEM
  • THANK YOU
  • SO I'LL READ IT INTO THE RECORD
  • THIS IS ITEM TEN H ORDER NUMBER 2020 111
  • IN ORDER ENDORSING THE EXECUTIVE DIRECTOR'S ADOPTION OF POLICY HR 34, REQUIRING PORT EMPLOYEES TO BE FULLY VACCINATED AGAINST COVID 19
  • THANK YOU, COMMISSIONERS AND EXECUTIVE DIRECTOR METRUCK BACK ON SEPTEMBER 28, COMMISSIONERS EXPRESSED THEIR SUPPORT FOR THE EXECUTIVE DIRECTOR'S ISSUANCE OF HR 34
  • THEY MADE VACCINATIONS AGAINST COVID-19 THE CONDITION OF EMPLOYMENT FOR ALL PORT EMPLOYEES
  • THE EXECUTIVE DIRECTOR'S ADOPTION OF HR 34 FALLS SQUARELY WITHIN THE EXECUTIVE DIRECTOR'S DELEGATED AUTHORITY TO MANAGE PORT STAFF AND ADOPT ADMINISTRATIVE OR OPERATIONAL RULES AND PRACTICES
  • THE ORDER TODAY STATES THAT IN RECOGNITION OF THE URGENCY OF THE ACTION NEEDED TO ADDRESS COVID-19, THE PORT COMMISSION HEREBY FORMALLY ENDORSES THE EXECUTIVE DIRECTOR'S IMPLEMENTATION OF HR 34, REQUIRING ALL POOR EMPLOYEES TO BE FULLY VACCINATED AGAINST COVID-19 OR BE SEPARATED FROM EMPLOYMENT UNLESS THEY APPLY AND QUALIFY FOR RELIGIOUS OR MEDICAL EXEMPTIONS THAT CAN BE REASONABLY ACCOMMODATED
  • THAT CONCLUDES MY PRESENTATION TODAY
  • I'LL TURN IT OVER TO YOU
  • COMMISSION PRESIDENT
  • THANK YOU, AARON CLARK
  • BEFORE WE CALL THE ROLL FOR QUESTIONS, I'D LIKE TO SAY A COUPLE OF THINGS HERE
  • AS EXPRESSED IN OUR SEPTEMBER 28 MEETING, THE COMMISSION STRONGLY SUPPORTED THE EXECUTIVE DIRECTOR'S DECISION TO REQUIRE ALL IMPORTANT EMPLOYEES TO BE VACCINATED AGAINST COVID-19 BY NOVEMBER 15, THIS POLICY HAS ALREADY PROVEN TREMENDOUSLY EFFECTIVE, IMPROVING THE PORT REPORTED EMPLOYEE VACCINATION RATE FROM JUST 56% WHEN THE POLICY WAS ANNOUNCED ON SEPTEMBER 14% TO 85% TODAY, WITH NEARLY A WEEK STILL TO GO BEFORE THE DEADLINE, THE COMMISSION HOPES AND EXPECTS THIS NUMBER TO END UP EVEN HIGHER
  • THE COMMISSION RECOGNIZES THAT A VERY SMALL NUMBER OF PEOPLE HAVE ADVERSE REACTIONS TO THE VACCINES, AND OTHERS MAY HAVE SINCERELY HELD RELIGIOUS BELIEFS AND OBJECTIONS TO THEM
  • THAT IS WHY THE EXECUTIVE DIRECTOR'S POLICY APPROPRIATE ALLOWS FOR EXEMPTIONS FOR EMPLOYEES, PROVIDED THAT A REASONABLE ACCOMMODATION IS POSSIBLE
  • AS MANY ARE AWARE, ONE OF THE UNION IS REPRESENTING SOME IMPORTANT EMPLOYEES THAT FILED THE LAWSUIT CHALLENGING THE VACCINATION POLICY
  • WHILE THIS IS, OF COURSE THEY'RE RIGHT, THE COMMISSION VERY MUCH DISAGREES WITH THE LAWSUITS ASSERTIONS
  • SPECIFICALLY, THE VACCINATION POLICY IS WELL WITHIN THE EXECUTIVE DIRECTOR'S POWERS UNDER THE BROAD AUTHORITY
  • THIS COMMISSION IS DELEGATED TO HIM TO MANAGE THE PORT, AND IT'S CRITICAL TO PROTECTING THE HEALTH AND WELL BEING OF PORT EMPLOYEES AND THEIR FAMILIES, PORT CONTRACTORS, CUSTOMERS AND GUESTS AS WELL AS THE COMMUNITY AT LARGE
  • THERE'S NO NEED FOR US TO AMEND THE DELEGATION BECAUSE IT ALREADY AFFORDS THE EXECUTIVE DIRECTOR AUTHORITY TO ISSUE WORKPLACE HEALTH AND SAFETY RULES LIKE THE VACCINATION POLICY
  • THEREFORE, THE ORDER THE COMMISSION IS CONSIDERING TODAY DOES NOT ALTER THE DELEGATION IN ANY WAY
  • RATHER, IT SIMPLY REITERATES THE COMMISSION'S WHOLEHEARTED SUPPORT FOR THE EXECUTIVE DIRECTOR'S DECISION TO ADOPT THE VACCINATION POLICY
  • SIR
  • CART, WOULD YOU PLEASE CALL THE ROLL FOR COMMENTS ON THIS POLICY? THANK YOU FOR QUESTIONS OR COMMENTS BEGINNING WITH COMMISSIONERS STEINBRUECK
  • NO COMMENTS
  • THANK YOU
  • THANK YOU
  • COMMISSIONER CHO
  • YEAH
  • I JUST WANT TO REITERATE THAT
  • I DON'T BELIEVE, ACTUALLY THAT THIS MOTION IS NECESSARY
  • I THINK IT'S WELL WITHIN THE RIGHTS OF OUR EXECUTIVE DIRECTOR TO DO THIS, BUT UNFORTUNATELY, DUE TO THE CIRCUMSTANCE, WE ARE VOTING ON THIS AND I WILL BE VOTING IN FAVOR OF IT
  • IT'S ALSO UNFORTUNATE THAT THE ISSUE OF VACCINES HAS BEEN POLITICIZED TO THE EXTENT THAT IT HAS AND I WOULD BE REMISS IF I DIDN'T REMIND EVERYONE THAT IF YOU EVER ATTENDED PUBLIC SCHOOLS
  • YOU ARE SUBJECT TO VACCINE MANDATES YOUR ENTIRE K THROUGH TWELVE EDUCATION
  • SO IT'S TRULY UNFORTUNATE THAT THIS ISSUE HAS BECOME A WEDGE ISSUE FOR MANY PEOPLE
  • AND WITH THIS IS THAT I PERSONALLY BELIEVE THAT EVERYONE HAS THE RIGHTS TO DO WHATEVER THEY WANT WITH THEIR BODY
  • I WOULD BE A HYPOCRITE IF I DIDN'T ENDORSE THAT PRINCIPLE
  • HOWEVER, WHEN THE DECISIONS YOU MAKE START TO INFLUENCE OR AFFECT THE LIVES OF OTHERS, THAT'S WHEN YOU CROSS THE LINE
  • AND THIS VACCINATION ISSUE IS NOT SO MUCH ABOUT WHETHER OR NOT YOU HAVE THE RIGHT TO CHOOSE TO GET A VACCINE OR NOT, BECAUSE YOU STILL DO
  • BUT THERE ARE CONSEQUENCES TO OUR DECISIONS AS HUMANS, AS MEMBERS OF THE COMMUNITY AND AS EMPLOYEES OF THE PORT OF SEATTLE
  • AND SO I WOULD HOPE THAT PEOPLE WOULD THINK ABOUT THE CONSEQUENCES OF THEIR DECISIONS
  • AND IN THIS CASE, IF YOU DON'T GET VACCINATED, YOU ARE JEOPARDIZING THE HEALTH OF YOUR COLLEAGUES, YOUR FAMILY AND YOUR LOVED ONES
  • AND I WOULD ASK THAT THOSE WHO ARE RESISTING THE VACCINATION TO THINK ABOUT IT THROUGH THE LENS OF HOW YOU'RE AFFECTING OTHER PEOPLE'S LIVES AS WELL
  • WITH THAT, I WILL END MY COMMENTS AND I LOOK FORWARD TO GOING IN FAVOR OF THIS
  • THANK YOU, COMMISSIONERS
  • COMMISSIONER
  • NO FURTHER COMMENTS
  • THANK YOU, COMMISSIONER
  • COMMISSIONER BOWMAN
  • NO COMMENTS
  • THANK YOU
  • COMMISSIONERS FELLEMAN
  • NO FURTHER COMMENTS
  • SO IS THERE A MOTION AND A SECOND TO APPROVE ITEM TEN H? THE MOTION HAS BEEN MOVED
  • AND SECONDED, CLERK HART, WOULD YOU PLEASE CALL THE ROLL FOR THE VOTE? YES
  • BEGINNING WITH COMMISSIONER STEINBRUECK
  • YES
  • THANK YOU
  • COMMISSIONERS CHO
  • AYE
  • THANK YOU, COMMISSIONER CALKINS AYE
  • THANK YOU, COMMISSIONER BOWMAN
  • AYE
  • THANK YOU, COMMISSIONERS FELLEMAN
  • AYE
  • THANK YOU
  • THERE ARE FIVE YESSES AND ZERO NOS FOR THIS ITEM, SO THE MOTION PASSES
  • NOW WE GET TO GO BACK TO ITEM NINE OF UNFINISHED BUSINESS
  • I BELIEVE
  • YES
  • AND IF YOU LIKE, I CAN GO AHEAD AND READ NINE A INTO THE RECORD, PLEASE
  • THIS IS AGENDA ITEM NINE, A AIRPORT GROUND TRANSPORTATION ACCESS PLAN ROADMAP
  • AND THIS IS ASSOCIATED WITH ITEM NINE B
  • THERE YOU GO
  • THANK YOU, CLERK HART, COMMISSIONERS
  • THERE'S NO ACTION ASSOCIATED WITH THIS ITEM
  • HOWEVER, WE BELIEVE IT WOULD BE HELPFUL TO PRESENT OUR GROUND TRANSPORTATION ACCESS PLAN ROADMAP TO PROVIDE SOME CONTEXT FOR THE AUTHORIZATION IMMEDIATELY FOLLOWING THIS PRESENTATION, I'LL HAVE MORE TO SAY ON THAT ITEM AFTER THIS BRIEFING
  • BASED ON YOUR QUESTIONS AT THE LAST MEETING, THE AIRPORT STAFF HAS PREPARED THIS OVERVIEW OF OUR EFFORTS TO CARRY OUT THE COMMISSION'S POLICY DIRECTION ON AIRPORT GROUND TRANSPORTATION
  • THIS INCLUDES REDUCING EMISSIONS, REDUCING PRIVATE VEHICLE USE, AND INCREASING HIGH OCCUPANCY VEHICLE AND TRANSIT USE
  • PRESENTERS THIS AFTERNOON ARE PETER LINDSAY, AIRPORT OPERATIONS DEVELOPMENT MANAGER AND LESLIE STAN, SENIOR MANAGER, AVIATION ENVIRONMENT AND SUSTAINABILITY
  • PETER, THANK YOU
  • EXECUTIVE METRUCK AND GOOD AFTERNOON, COMMISSIONERS
  • PETER LINDSAY, LANDSIDE DEVELOPMENT MANAGER
  • I WANT TO INTRODUCE MY COLLEAGUE, LESLIE STANTON, ENVIRONMENTAL PROGRAM MANAGER
  • AND BEFORE I BEGIN MY COMMENTS, I DO WANT TO GIVE MANAGING DIRECTOR LANCE
  • LITTLE A CHANCE TO SAY IF YOU WERE AS WELL
  • THANK YOU, PETER
  • GOOD AFTERNOON
  • EXECUTIVE DIRECTOR METRUCK COMMISSIONERS AT THE SEPTEMBER 20 FULL COMMISSION MEETING, A NUMBER OF YOU HAD ASKED SEVERAL QUESTIONS REGARDING HOW THE WIDENING ARRIVALS PROJECT RELATES OVER DRAWN TRANS STATION GOES AND HOW THE PROJECT SUPPORTS THOSE GOALS
  • COMMISSIONERS, MOST OF YOU ARE AWARE THAT WE HAVE DONE A WHOLE LOT OF WORK WITH REGARDS TO THE GTOP OR THE GROUND TRANSLATION ACCESS PLAN
  • HOWEVER, WE STILL HAVE A LOT OF WORK TO DO, AND WE STRUGGLE A BIT IN THE LAST MEETING TO EXPLAIN HOW THE WIDE AND THE RIVALS DRIVE PROJECT INTEGRATES WITH THE GTAP EFFORTS AND ALSO ANSWERING THE MORE TECHNICAL QUESTIONS RELATED TO THE PROJECT SCORE, SUCH AS DEDICATED LANDS FOR HIGH OCCUPANT VEHICLES AND DEVELOPMENT OF THE STAMP FOR SUSTAINABILITY MASTER PLAN
  • SO WE'RE HOPING THAT WE CAN RECTIFY THAT
  • TODAY WE DEVELOP TWO COMPLEMENTARY PRESENTATIONS FOR YOU
  • ONE, DESCRIBE A STEP BY STEP APPROACH TO MEETING THE DRONE TRANS STATION GOALS ESTABLISHED BY THE RESOLUTION
  • THIS IS OUR GTA ROADMAP AND TO ANSWER SPECIFIC SCOPE RELATED QUESTIONS ABOUT THE WIDES ARRIVALS PROJECT, YOU ALL SHOULD HAVE RECEIVED A WRITTEN MEMO WITH DETAILED RESPONSES TO YOUR QUESTIONS
  • IT IS IMPORTANT TO KEEP IN MIND THAT TO MEET THE TRANSLATION, FOR EXAMPLE, 50% REDUCTION IN GREENHOUSE GAS 30% PRIVATE VEHICLE MODE HERE WILL REQUIRE A MULTIFACETED APPROACH TO PROBLEM SOLVING THAT AFFECTS AIRPORT OPERATIONS, COMMERCIAL MANAGEMENT, AND OUR CAPITAL INVESTMENTS SUCH AS THE WIDE AND ARRIVAL PROJECT
  • I WILL NOW TURN OVER TO PETER, LINDSAY AND LESLIE STANTON TO KICK OFF THE FIRST AGENDA ITEM
  • PETER, THANK YOU, LANCE
  • CLERK HART, IF YOU COULD BRING UP THE PRESENTATION AND AS LANCE MENTIONED AND EXECUTIVE METRUCK, WE'RE HERE TO SET SOME CONTEXT AROUND THE GROUND TRANSPORTATION ACCESS PLAN
  • REALLY, TO LET THE COMMISSION KNOW WHERE WE'VE BEEN AND WHERE WE'RE GOING TO REVIEW OUR MULTI YEAR PLAN AND DEVELOP OUR WORK PROGRAM
  • WE ALSO WANT TO SHARE WITH YOU HOW WE ORGANIZE OUR WORK AND GIVE YOU SOME DETAIL ABOUT THE RELATIONSHIP BETWEEN THE GOALS THAT YOU'VE PASSED AND OUR CAPITAL INITIATIVES
  • NEXT SLIDE, PLEASE
  • SO THERE'S SOME LEVEL SETTING
  • AS LANCET JUST MENTIONED, WE HAVE SPECIFIC GOALS THAT WERE DEVELOPED IN THE RESOLUTION 37, 59
  • IN PARTICULAR, THE 50% REDUCTION IN SCOPE, THREE EMISSIONS AND ALSO THE DECREASE IN PASSENGER PRIVATE VEHICLE USE
  • AND THEN, OF COURSE, WE HAVE A CUSTOMER SERVICE CALL 15 MINUTES TO THE TOWER TO THE CURB SIDE
  • THAT'S HERE AT THE AIRPORT
  • WE ALSO IN THE INTERVENING HERE SINCE THESE WERE PASSED, HAD A NUMBER OF COMMISSION PRIORITIES EMERGING OUR CONVERSATIONS, INCLUDING INCREASING HOV MODES SUCH AS TRANSIT, AND THAT'S BOTH FOR PASSENGERS AND EMPLOYEES AND MINIMIZING PRIVATE VEHICLE DEMAND ON OUR CURB SIDE FOR THAT LOADING AND UNLOADING ACTIVITY, ALL WITH THE EYE OF MAKING SURE THAT EQUITABLE OUTCOMES ARE INSURED FOR OUR COMMUNITIES EITHER AROUND THE AIRPORT OR THOSE WHO ARE ACCESSING OUR FACILITIES
  • NEXT SLIDE, PLEASE
  • SO JUST TO GET A SENSE OF WHAT OUR ACCOMPLISHMENTS HAVE BEEN, AND AS LANCE HAD MENTIONED, WE'VE BEEN DOING A LOT OF WORK, ESPECIALLY AROUND TRANSPORTATION NETWORK COMPANIES, USING CONTRACTS TO INCENTIVIZE A GREENER FLEET THERE AND BETTER ENVIRONMENTAL PERFORMANCE FOR THOSE VEHICLES
  • OF COURSE, RENEWABLE NATURAL GAS WAS PASSED BY THE COMMISSION, AND THOSE CONTRACTS BEEN USED AS A DROP IN FUEL FOR OUR PORT BUS FLEET, BOTH IN EMPLOYEE PARKING AND FOR OUR RENTAL CAR FLEET AND THEN PROVIDING ELECTRIC VEHICLE CHARGING AT THE CELL PHONE LOT
  • WE'VE INCLUDED THOSE IMPROVEMENTS AS WELL FOR 160 PROJECT AND LOOKING AT INCLUDING ELECTRIC VEHICLE CHARGING FOR A NORTH EMPLOYEE PARKING LOT, TOO
  • SO THOSE ARE SOME OF THE KEY AREAS WE'VE SEEN ELECTRIC VEHICLE AND ELECTRIFICATION BEING IMPORTANT FOR OUR INITIATIVES
  • WE INVESTIGATED THE ACCESS FEE CONCEPT AND UNDERSTANDING THAT WE HAVE HAD SOME FAVORABLE OPINIONS ABOUT THE THE PORT'S ABILITY TO INVOKE AN ACCESS FEE TO CHANGE BEHAVIOR, INCENTIVIZE AND MODE SHIFT, AND ALSO DEVELOPING THE AIRPORT'S TRANSPORTATION MANAGEMENT ASSOCIATION, A WAY OF ENCOURAGING DIFFERENT COMMUTE MODES TO THE AIRPORT
  • AND WITH THAT, I WILL TURN IT OVER TO MY COLLEAGUE LESLIE STANTON, WHO'S GOING TO KIND OF WALK THROUGH OUR ROADMAP AND HOW WE GET TO THESE GOALS
  • THANKS, PETER
  • SO CAN JUST MOVE TO THE NEXT SLIDE
  • THANK YOU
  • IN ORDER TO SET THIS UP FOR THE MAJOR QUESTION, WHICH WAS, HOW DOES OUR GROUND TRANSPORTATION ACCESS PLAN INTEGRATE WITH OUR CAPITAL DEVELOPMENT? IT'S IMPORTANT TO KNOW, IN ADDITION TO THE BACKGROUND THAT PETERS LAID OUT, THAT THE WAY THAT WE THINK ABOUT THIS IS THERE ARE TWO WAYS TO KIND OF REDUCE EMISSIONS, AND THAT IS, WE CAN PROVIDE CLEANER VEHICLE TECHNOLOGIES
  • THESE ARE THINGS LIKE ELECTRIC VEHICLES FOR OUR GROUND TRANSPORTATION FOLKS, OR WE CAN ALSO PROMOTE THOSE MODES, WHICH IS CHANGING PASSENGER BEHAVIOR AND CHANGING PEOPLE'S BEHAVIOR
  • THE THIRD AREA THAT WE'RE INTERESTED IN IS ALSO OUR SUSTAINABLE COMMUTE
  • SO WE HAVE OVER 20,000 EMPLOYEES THAT COME TO AND FROM THE AIRPORT EVERY DAY
  • SO THAT'S AN IMPORTANT CATEGORY FOR US AS WELL TO TRY TO MEET OUR GREENHOUSE GAS GOALS
  • BUT I JUST WANT TO SET UP THIS FRAMEWORK FOR YOU TO THINK ABOUT THE REASON WE HAVE THESE TWO OPPORTUNITIES IN TERMS OF NEW TECHNOLOGIES AND THEN CHANGING BEHAVIOR
  • THEN THAT'S ON THE LEFT, ON THE RIGHT HAND SIDE ARE THOSE KEY MODES THAT WE KNOW WE NEED TO INCREASE IN ADVANCE IN ORDER TO MEET OUR 2030 GOAL
  • SO THIS IS SOME PRELIMINARY WORK THAT WAS DONE BY ADRIAN DOWN, OUR SUSTAINABLE TRANSPORTATION PROGRAM MANAGER ON OUR TEAM, AND IT'S JUST TO LET YOU KNOW THAT THESE ARE THE FOUR MODES LOW CARBON MODES THAT WE'RE FOCUSED ON AS WE LOOK AT THE WORK PLAN THAT WE'RE WORKING ON IN THE NEXT COUPLE OF YEARS AND THEN ALL THE WAY TO 2030, I'LL LAY OUT JUST ONE OF OUR NEAR TERM WORK PLAN ITEMS OR LONGER TERM WORK PLAN ITEMS AND THEN AT THE END, I'LL SHOW YOU HOW ALL OF THAT WORK INTEGRATES WITH OUR CAPITAL DEVELOPMENT WORK ON OUR ROADWAYS NEXT SLIDE
  • SO AGAIN, STAYING WITH THESE THREE CATEGORIES, WHERE WE'RE INCENTIVIZING CLEAN VEHICLE TECHNOLOGIES, THAT'S, OF COURSE, MOVING TO A CLEAN TECHNOLOGY FUTURE AS WELL AS PROMOTING THOSE LOW CARBON MODES, AND THAT'S OUR BEHAVIOR CHANGE
  • AND THEN AGAIN, OUR SUSTAINABLE COMMUTING
  • OF COURSE, FOR THE NEXT TWO YEARS, WE WANT TO LOOK AT CONVENING A BROAD STAKEHOLDER ENGAGEMENT PROCESS WITH OUR GROUND TRANSPORTATION SERVICE PROVIDERS
  • THOSE ARE OUR TNCS TAXIS, AIRPORTERS, OTHER FOLKS THAT PROVIDE SERVICES ON THE GROUND TRANSPORTATION TO AND FROM THE AIRPORT, AND THEN WORKING WITH OUR GOVERNMENT PARTNERS AROUND THE REGION AND STATEWIDE TO UNDERSTAND WHAT'S THEIR ROLE IN
  • THIS IS THEIR FUNDING AVAILABLE? WHAT ARE THE FINANCIAL BARRIERS? HOW DO THESE CHANGES IMPACT OUR DRIVERS AND OTHER FOLKS? AND THEN AT THE END OF THAT, WE'D RECOMMEND POLICIES AND PARTNERSHIPS TO SUPPORT THAT TRANSITION TO CLEANER VEHICLES FOR GROUND TRANSPORTATION SERVICE PROVIDERS
  • AND OBVIOUSLY, THAT WOULD PROBABLY INVOLVE, AS WE WOULD HOPE, SOME PARTNERSHIPS WITH REGIONAL GOVERNMENTS AND OTHER PARTNERS, THEN ON THE LOW CARBON PROMOTING THOSE LOW CARBON MODES AND THAT BEHAVIOR CHANGE PIECE
  • THIS IS WORK WE'VE TALKED ABOUT QUITE A BIT, WHICH IS COMPLETING OUR WORK ON ACCESS FEES AND MODE CHOICE
  • THAT'S THE WORK THAT WE'RE DOING WITH NREL, THE NATIONAL RENEWABLE ENERGY LABORATORY, LOOKING AT
  • WHAT WOULD IT TAKE TO CHANGE FOLKS BEHAVIOR COMING TO AND FROM THE AIRPORT? ONCE WE UNDERSTAND THOSE ISSUES AND WHAT IT TAKES TO CHANGE BEHAVIOR, WE WOULD PUT THAT INFORMATION INTO A TRAFFIC MODEL AND UNDERSTAND, HOW DOES THAT IMPACT OUR ROADWAYS COMING TO AND FROM THE AIRPORT? WHAT DOES THAT LOOK LIKE IN FOLKS TRYING TO GET TO OUR FACILITIES? IN ADDITION, WE ARE GOING TO BE WORKING ON SOME OTHER PILOT PROJECTS THAT WE HAVE ONE FOR TRANSIT TICKETS
  • WE'VE BEEN TALKING ABOUT THAT A BIT, CONTINUING TO WORK WITH OUR EAST SIDE BUSINESS PARTNERS AND OTHER PARTNERS TO THINK ABOUT WAYS THAT WE CAN GET FOLKS TO AND FROM THE EAST SIDE IN A MORE LOW CARBON WAY
  • AND THEN, OF COURSE, DEVELOPING A TRANSIT STRATEGY
  • WE RECOGNIZE THAT TRANSIT IS CENTRAL TO GETTING FOLKS TO AND FROM THE AIRPORT
  • AND WE WANT TO UNDERSTAND THERE ARE A NUMBER OF BARRIERS TO CHANGING THAT ISSUE
  • WE NEED TO TAKE SOME TIME TO UNDERSTAND THAT OVER THE NEXT COUPLE OF YEARS
  • AND THEN AGAIN, WE'VE BEEN WORKING WITH OUR TRANSPORTATION MANAGEMENT ASSOCIATION, THIS IDEA, AND WE'RE GOING TO BE IMPLEMENTING THAT AS WE'RE SPENDING THIS YEAR DEVELOPING IT
  • AND WE'LL BE IMPLEMENTING THAT IN THE NEXT COUPLE OF YEARS
  • SO THAT'S THE NEAR TERM
  • LET ME JUST GO TO THE LONGER TERM ITEMS HERE AND WHAT WOULD HAPPEN IS, FOR THE LATER PART, GETTING TO 2030
  • NEXT SLIDE, PLEASE
  • GREAT
  • SO AGAIN, AFTER WE SPEND QUITE A BIT OF TIME LOOKING AT OUR GROUND TRANSPORTATION SERVICE PROVIDER STRATEGY, LOOKING AT THAT STAKEHOLDER ENGAGEMENT, FINDING OUT THOSE BARRIERS, DEVELOPING SOME KEY STRATEGIES WE START TO IMPLEMENT
  • THAT THE SAME WITH OUR PROMOTING THE LOW CARBON MODE CATEGORY, WHERE WE CONTINUE TO LOOK AT, HOW CAN WE INCREASE TRANSIT TO AND FROM THE AIRPORT? WHAT DOES IT LOOK LIKE TO INTEGRATE ANY KIND OF INFRASTRUCTURE WE WOULD NEED TOWARDS THOSE GROUND TRANSPORTATION GOALS? AND THEN AGAIN, AS WE'VE TALKED ABOUT COMPLETING OUR OTHER ROADWAY CAPITAL DEVELOPMENT PROJECTS AND THEN, OF COURSE, CONTINUING TO OPERATE THE TRANSPORTATION MANAGEMENT ASSOCIATION OF THE TMA TO UNDERSTAND HOW WE CAN HELP OUR EMPLOYEES GET TO AND FROM THE AIRPORT IN LOW CARBON MODE IN A WAY THAT WORKS FOR THEM
  • SO JUST PULLING ALL OF THIS TOGETHER, JUST GO TO THE LAST SLIDE
  • NEXT SLIDE, PLEASE
  • THIS IS KIND OF THE END HERE TO SAY IN THE NEXT COUPLE OF YEARS
  • AGAIN, WE'RE GOING TO BE LOOKING AT OUR ACCESS FEES AND TRAFFIC MODELING IN 2022 AND PROBABLY A BIT INTO 2023, BUT WE DON'T KNOW WHAT THE OUTCOME OF THAT ANALYSIS IS GOING TO LOOK LIKE
  • SO IT'S REALLY NOT CLEAR AT THIS POINT WHAT WE WOULD BE WORKING ON WILL BE ISSUES THAT WE WOULD COME TO YOU WITH TO SAY THESE ARE THE TRADE OFFS
  • THIS IS WHAT WE FOUND
  • AT THE SAME TIME, HEATHER IS GOING TO TALK ABOUT THE WIDE ARRIVALS ROADWAYS AND THEN CONTINUING ON WITH OUR GROUND TRANSPORTATION SERVICE TRANSITION, WHICH AGAIN IS WORKING WITH THOSE PARTNERS AROUND THE REGION LOOKING AT FUNDING BARRIERS, LOOKING AT FUNDING OPPORTUNITIES AND PLANNING ALL OF THAT IN 2022 AND THEN IMPLEMENTING THAT OVER THE NEXT SEVERAL YEARS
  • AGAIN, SOME OF OUR CAPITAL PROJECTS, SUCH AS AND WE DON'T KNOW IF THESE PROJECTS WILL BE APPROVED OR NOT TO MOVE FORWARD
  • BUT IF WE HAD ROADWAYS IMPROVEMENT AND OUR GROUND TRANSPORTATION FACILITY, THAT PLANNING WOULDN'T EVEN BEGIN UNTIL 2022 IF IT BEGINS AT ALL
  • AND THEN IT'S UNCLEAR IF WE WOULD ACTUALLY BE DEVELOPING THOSE
  • BUT IF THEY DID, IT WOULD COME QUITE A BIT LATER AND AGAIN FOCUSING ON OUR TRANSIT ACCESS STRATEGY
  • THAT IS WHAT WE WILL BE DOING NEXT YEAR AND PROBABLY A BIT INTO 2023, AND THEN WE'D BE IMPLEMENTING THAT IN THE 2024 2020 TIME FRAME
  • SO I'LL STOP THERE AND SEE IF WE HAVE QUESTIONS
  • CLERK HART, WOULD YOU LIKE TO CALL THE ROLL FOR QUESTIONS OF LESLIE FOR QUESTIONS BEGINNING WITH COMMISSIONER STEINBRUECK
  • THANK YOU
  • NO QUESTIONS
  • THANK YOU, COMMISSIONER CALKINS
  • I'M GOING TO HOLD MINE UNTIL THE NEXT ITEM
  • THANK YOU, SIR
  • COMMISSIONER BOWMAN
  • YEAH, I'VE ALREADY HAD A BRIEFING FROM THE STAFF ON THIS, AND I DO APPRECIATE LESLIE DIDN'T TALK TOO MUCH ABOUT IT IN THIS PRESENTATION, BUT REALLY DIVING DEEP INTO WHERE PEOPLE ARE COMING GEOGRAPHICALLY TO THE AIRPORT AND WHAT MODE OF TRANSPORT THEY'RE USING
  • AND SO I JUST HOPE THAT MOVING FORWARD THERE WILL BE CONTINUED OUTREACH, PARTICULARLY TO THOSE THAT ARE FURTHEST FROM THE AIRPORT TO FIND WAYS, NOT JUST ENCOURAGE THEM TO USE TRANSIT OR A RIDE SHARE BY ADVERTISING, BUT REALLY UNDERSTANDING WHAT THE BARRIERS ARE FOR THEM TO DO
  • SO IF YOU LIVE OUT IN TAKING UBER TO THE AIRPORT WOULD BE WELL OVER $100 IF YOU LIVE IN SNOW CALL ME
  • YOU'RE JUST NOT GOING TO TAKE SEVERAL BUSES TO GET TO LIGHT RAIL TO GO TO THE AIRPORT
  • I REALIZED WE CAN'T SERVE ALL OF OUR CONSTITUENTS IN AN EQUAL WAY
  • I DO HOPE THAT WE CAN WORK IN SORT OF CONCENTRIC CIRCLES AND FIGURE OUT THOSE CLOSEST TO LIGHT RAIL
  • WHAT MORE CAN BE DONE TO ENCOURAGE THEM TO USE IT THOSE THAT HAVE BUS RAPID TRANSIT, SAME THING
  • AND THEN FROM THERE GOING OUT AND UNDERSTANDING WHAT THE BARRIERS ARE AND HOW WE MIGHT LOOK AT NEW WAYS OF CONNECTING PEOPLE TO TRANSIT TO GET TO THE AIRPORT AT THE END OF THE DAY, I KNOW THAT WE ALL SHARE THE VALUES AND WOULD AGREE WITH THE SENTIMENT THAT WHAT WE NEED TO DO MORE THAN ANYTHING ELSE, IS TO REDUCE SINGLE OCCUPANCY TRIPS TO THE AIRPORT
  • I WOULD ACTUALLY ADD ON TO THAT, THOUGH THE RIDE SHARE COMPANIES ARE I DON'T REMEMBER WHAT OUR LATEST NUMBERS ARE, BUT IT'S SUBSTANTIAL, OR AT LEAST IT CERTAINLY WAS BEFORE THE PANDEMIC IN TERMS OF THE VEHICLE TRIPS COMING TO THE AIRPORT
  • AND WHILE I KNOW THAT THAT'S ONE OF THE CONSIDERATIONS THE STAFF TAKES IS WEIGHING WHEN YOU'RE MAKING THESE DECISIONS, HOW DO WE REDUCE EMISSIONS BUT ALSO REDUCE THE ACTUAL NUMBER OF VEHICLES COMING IN? THOSE TWO CONCEPTS ARE FREQUENTLY AT ODDS WITH ONE ANOTHER
  • BUT I WOULD SAY IF EVERY SINGLE VEHICLE THAT CAME INTO THE AIRPORT, EVERY SINGLE RIDE SHARE, FOR EXAMPLE, WAS AN ELECTRIC VEHICLE HAS ZERO EMISSIONS, WE WOULD STILL HAVE A HUGE PROBLEM ON OUR HANDS BECAUSE IT WOULD MEAN THAT WE HAVE TOO MANY VEHICLES ON THE ROAD AND OUR ROADWAYS CAN'T HANDLE IT
  • AND I DON'T MEAN JUST AT THE AIRPORT
  • SO I HOPE THAT EQUAL EMPHASIS CAN BE TAKEN MOVING FORWARD ON THOSE TWO GOALS, NOT ONE NECESSARILY OVER THE OTHER
  • SO AGAIN, SORRY, JUST MORE OF A COMMENT
  • AND THEN I'VE GOT SOME QUESTIONS AS WE MOVE ON TO THE NEXT ITEM
  • THANK YOU
  • THANK YOU, COMMISSIONERS BOWMAN
  • COMMISSIONER FELLEMAN
  • WELL, I DO APPRECIATE COMMISSIONER BOWMAN'S COMMENT ABOUT THAT
  • I SAW THE GOAL BEING A DOUBLING OF THE TNC TAXI GOAL, AND I ASSUME THE PROPORTION I ASSUME THAT'S ASSUMING THAT WE'RE DEALING WITH NO DEAD HEADING
  • RIGHT
  • THAT'S THE ASSUMPTION THAT WE'RE TAKING PEOPLE COMING AND GOING AS WELL AS LOWER EMISSION VEHICLES
  • IS THAT PART OF THE STORY? YES
  • THAT'S CORRECT
  • THAT WOULD BE INCONSISTENT WITH OUR EKPI, WHICH IS WHAT WE ARE USING FOR OUR TNCS, AND CONTINUING TO DO THAT WITH OUR TAXI CONTRACTS WOULD BE TO LOOK AT WAYS TO REDUCE THAT HEADING
  • ABSOLUTELY
  • THAT'S VERY CONSISTENT WITH THAT
  • SOMETIMES ADD ON QUICKLY, COMMISSIONER
  • WE ALSO HAVE THE REMATCH PROGRAM, WHICH IS PART OF OUR TNC ACTIVITY AND OPERATIONS
  • SO THAT'S AN IMPORTANT ELEMENT OF THAT IS CONNECTING THOSE RIGHTS AT THE DROP OFF TO THE PICK UP
  • I GUESS THAT IS JUST THE MECHANISM BY WHICH YOU REDUCE DEAD HEADING
  • THAT'S CORRECT
  • AND IT SEEMS TO ME, THOUGH, THAT THE METHOD BY WHICH YOU MAKE THEM MANDATORY IS REALLY JUST DOUBLING
  • THE GOAL OF DOUBLING TNCS AND CABS IS REALLY ONLY USEFUL, IF THAT'S THE REQUIREMENT OF COMING, BECAUSE OTHERWISE, AS COMMISSIONER BOB WAS SAYING, YOU GET A LOT OF CLEAN CARS, BUT YOU STILL GET A LOT OF CARS
  • THAT'S RIGHT
  • YEAH
  • THE OTHER THING IS WHEN WE TALK ABOUT DEDICATED LANES, AND I'M SURE GET INTO NEXT IS I'VE ALWAYS WONDERED WHAT WAS THE THINKING ABOUT HAVING THAT BASICALLY HALF THE SPACE ON THE UPPER ROADWAY BEING AIR AND NOT ROAD
  • I JUST ALWAYS THOUGHT THAT IF WE WANTED TO JUST KEEP THE CURB CLEAR OR REALLY PRIORITIZE CURB USE, WE REALLY CAN'T AFFORD TO GET RID OF THAT LANE
  • BUT COULDN'T WE ADD TWO LANES IF INDEED, THAT WAS OUR GOAL OF REALLY PRIORITIZING THE NEAR? IT WOULD PROBABLY BE EXTRAORDINARILY EXPENSIVE
  • BUT AREN'T THERE ABOUT IS IT ONE OR TWO LANES OF SPACE THAT IS JUST OPEN AIR? YES, I CAN ATTEST TO THAT VERY PLAN, ACTUALLY, COMMISSIONER, BECAUSE IN PREVIOUS ITERATIONS AT THE AIRPORT HAVE LOOKED AT EXPANDING THE DEPARTURES DRIVE OVER THAT SPACE
  • WHEN TRA DESIGNED THE TERMINAL, THEY DESIGNED FOR A CERTAIN LEVEL OF ACTIVITY, 25 MILLION ANNUAL PASSENGERS IS OFTEN QUOTED
  • AND THAT WAS AN AREA OF POTENTIAL EXPANSION
  • BUT AS YOU'VE ALSO FIGURED HERE, IT'S VERY EXPENSIVE TO ADD THAT KIND OF ELEVATED ROADWAY AND SUPPORT STRUCTURE TO THAT EXISTING STRUCTURE
  • IT'S CERTAINLY POSSIBLE
  • IT'S SOMETHING THAT CAN BE DONE BUT HAS SOME EXPENSE AND SOME TECHNICAL CHALLENGES
  • AND I WOULD JUST ADD TO THAT
  • PETER, THAT ONE OF THE THINGS THAT'S IMPORTANT TO KEEP IN MIND WHEN I HAD THE PREVIOUS SLIDES SHOWING THE INCREASE IN THE PERCENTAGE AND THE MODE SPLIT, FOR EXAMPLE, WE WENT FROM TRANSIT FROM 6% TO 10%, EVEN THOUGH IT'S ONLY YOU'D SAY IT'S LESS THAN THE DOUBLING
  • IF YOU LOOK AT THE NUMBER OF PEOPLE THAT ARE TAKING THOSE MODES, IT'S WELL PASSED MORE THAN DOUBLING IT BECAUSE WE KNOW WE'RE GOING TO SEE EXPANSION, AN INCREASED NUMBER OF FOLKS COMING TO AND FROM THE AIRPORT IN THE FUTURE
  • WE HAVE TO HAVE STRATEGIES TO DEAL WITH THAT
  • SO EVEN THOUGH THE NUMBERS CAN LOOK A LITTLE BIT MINIMAL ON THAT TABLE, THEY ARE NOT WE ARE PLANNING FOR A LOT OF MORE FOLKS TO BE COMING TO AND FROM THE AIRPORT
  • SO WE'RE GOING TO NEED THAT EXTRA CAPACITY
  • WELL, I MEAN, TO THAT POINT, IT WOULD BE GOOD TO SHOW NOT JUST THE PERCENTAGE OF THE MODE SPLIT, BUT THE PERCENTAGE OF THAT REPRESENTING NUMBERS OF PEOPLE
  • AND BECAUSE OBVIOUSLY A SMALL PERCENTAGE OF THE MASS TRANSIT IS GOING TO BE A MUCH NUMBER ANYWAY, I WOULD LIKE TO KNOW ABOUT BECAUSE I KNOW ALL MY COLLEAGUES HAVE ALWAYS SPOKEN ABOUT DEDICATED LANES PRIORITIZING CURB ACCESS, AND IT'S PRETTY MUCH A MESS OUT THERE WITH CURB ACCESS AND MAKE THE POLICE'S JOB THAT MUCH HARDER
  • AND SO I'M SURE IT'S EXPENSIVE
  • BUT RIGHT NOW WE ARE IN A VERY CONSTRAINED WAY, AND I WOULD JUST LIKE TO KNOW IN THE COURSE OF THIS VISIONING THING OF WHAT WE'RE DOING WITH THE WIDENING OF THE ROAD
  • IS THERE SOME WAY WE CAN TALK ABOUT WHAT IT WOULD TAKE TO? I MEAN, THE SPACE IS THERE
  • IT'S NOT LIKE THIS IS A TECHNOLOGICAL IMPOSSIBILITY
  • OF COURSE
  • EVERYBODY'S GOING TO JUMP ON ME AND SAY, WHAT ARE YOU TALKING ABOUT? BUILDING MORE ROADS
  • BUT I'M ACTUALLY TALKING ABOUT BUILDING MORE ROADS BY EXCLUDING, REALLY, THE CURB ALMOST
  • IT'S JUST LIKE MAKING THAT A VERY LOW USE, HIGH PRIORITY ACCESS ROAD
  • ANYWAY, WITH THAT SAID, LET'S HEAR ABOUT WIDENING ROADWAYS NEXT, MR COMMISSIONER, PASSING
  • I CAN GO AHEAD AND READ THAT INTO THE RECORD
  • AND THEN EXECUTIVE DIRECTOR METRUCK CAN GIVE HIS INTRODUCTION
  • THANK YOU
  • THANK YOU
  • THIS IS ITEM 90, AUTHORIZATION FOR THE EXECUTIVE DIRECTOR TO ADVERTISE AND AWARD A MAJOR PUBLIC WORKS CONTRACT FOR THE EARLY DEMOLITION OF THE FOURTH FLOOR BRIDGE TO THE MAIN PARKING GARAGE
  • TO AMEND THE EXISTING SERVICE AGREEMENT FOR AIRPORT REDWAY DESIGN SUPPORT SERVICES WITH HNTB THE AMOUNT OF $3,100,000 WITH A NEW CONTRACT TOTAL OF 8000 $700,000 TO ENTER INTO REIMBURSABLE AGREEMENT WITH THE FEDERAL AVIATION ADMINISTRATION AND TO AUTHORIZE AN ADDITIONAL 6000 $900,000 FOR A TOTAL PROJECT AUTHORIZATION OF 15,000 $500,000 FOR THE WIDEN ARRIVALS ROADWAY PROJECT AT SEATTLE TACOMA INTERNATIONAL AIRPORT
  • COMMISSIONERS
  • THIS ITEM WAS ORIGINALLY BROUGHT BEFORE YOU AT SEPTEMBER 28 COMMISSION MEETING AS MANAGING DIRECTOR
  • LITTLE DISCUSSED DURING THAT MEETING, YOU ASKED FOR ADDITIONAL ANALYSIS TO MAKE THE CASE FOR THIS PROJECT
  • WE'RE HERE BEFORE YOU TODAY TO PROVIDE THAT ANALYSIS
  • THE WIDE ARRIVALS PROJECT IS A PROJECT CRITICAL TO RELIEVING HIGH LEVELS OF CONGESTION ON THE MAIN ACCESS TO SEA
  • ALL OF US ARE FAMILIAR WITH THE FREQUENT TRAFFIC BACKUPS THAT OFTEN EXTEND BACK TO STATE ROAD 518
  • AS WE DISCUSSED IN THE PREVIOUS BRIEFING, WE'RE ON A CLEAR PATH TO ADDRESS THE COMMISSION'S PRIORITIES TO REDUCE EMISSIONS, PRIVATE VEHICLE USE WHILE ALSO INCREASING TRANSIT USE
  • WIDENING RIVALS PROJECT PROVIDES FLEXIBILITY TO PROVIDE FOR PREFERENTIAL HIGH OCCUPANCY VEHICLE ACCESS IN THE FUTURE, WHILE ALSO EASING THE VERY SERIOUS TRAFFIC CONGESTION THAT EXISTS TODAY
  • WE BELIEVE WE CAN AND SHOULD PURSUE OUR CRITICAL ENVIRONMENTAL PRIORITIES AS WE ALSO ADDRESS IMPORTANT CUSTOMER SERVICE NEEDS GOING FORWARD
  • THIS IS NOT A ZERO SUM GAME TO RECAP THE COMMISSION APPROVED INITIAL DESIGN WORK FOR THIS PROJECT IN 2019
  • IT IS BEFORE YOU TODAY AS THE SCOPE HAS INCREASED AND TO PROVIDE FOR EARLY DEMOLITION OF AN OBSOLETE RAMP INTO THE GARAGE
  • I WANT TO REITERATE THAT THE WIDENING ARRIVALS PROJECT IS NOT PART OF THE SUSTAINABLE AVIATION MASTER PLAN NEAR TERM PROJECTS, IT WILL BE BUILT REGARDLESS OF THE SAMPLE APPROVAL
  • THE PROJECT IS BEING DESIGNED SO IT DOES NOT CONFLICT WITH THE SAMPLE PROJECTS
  • IF THE COMMISSION APPROVES THOSE PROJECTS IN THE FUTURE
  • IN THIS UPDATED PRESENTATION, STAFF WILL ADDRESS THE CURRENT AND FUTURE ROADWAY LEVEL OF SERVICE
  • WHAT CONGESTIONS MAY LOOK LIKE OVER TIME, HOW LANE FLEXIBILITY HAS BEEN INTEGRATED WITH THE DESIGN EFFORT, ENVIRONMENTAL REVIEW, AND HOW THIS RELATES TO THE SAMPLE
  • AS A REMINDER, WE ARE SEEKING APPROVAL FOR DESIGN ONLY TODAY, NOT CONSTRUCTION AUTHORITY
  • IT IS IMPORTANT TO DO THIS TO WORK SO WE CAN MOVE FORWARD TO INCORPORATE THE COMMISSIONER'S PRIORITIES AS WE MOVE FORWARD
  • THE PRESENTERS ARE HEATHER BORN, HORSE CAPITAL PROJECT MANAGER STEVE REIFOLD, SENIOR ENVIRONMENTAL PROGRAM MANAGER, AND I DON'T KNOW IF OUR MANAGING DIRECTOR FOR AVIATION, LANCE LITTLE, HAD ANY INTRO INTO THIS ITEM BEFORE WE BEGIN
  • HEATHER, OR DO I TURN IT OVER TO YOU? LANCE, DO YOU HAVE SOME THINGS TO SAY? NO MORE
  • THANKS, LANCE
  • THANK YOU, EXECUTIVE DIRECTOR, METRUCK AND LANCE AND GOOD AFTERNOON, COMMISSIONERS
  • MY NAME IS HEATHER BOURNEHORST, AND I'M THE LANDSIDE PROGRAM MANAGER IN THE AVIATION PROJECT MANAGEMENT GROUP
  • MY COLLEAGUE STEVE REBELT AND I ARE HERE TODAY TO PROVIDE ANSWERS TO THE QUESTIONS YOU RAISED ON SEPTEMBER 28
  • CAN YOU START THE PRESENTATION, PLEASE, AND PROCEED TO SLIDE, TOO? THANK YOU
  • YOU HAD QUESTIONS ABOUT CURRENT AND FUTURE ROADWAY LEVEL OF SERVICE AND CONGESTION, ABOUT LANE FLEXIBILITY AND THE APPLICABILITY OF HOV LANES, THE PROJECT'S ENVIRONMENTAL REVIEW EFFORT, AND HOW THIS PROJECT RELATES TO THE SUSTAINABLE AIRPORT MASTER PLAN
  • WE PLAN TO WALK YOU THROUGH THOSE QUESTIONS AND IF NEEDED, WE CAN ALSO REVIEW INFORMATION PRESENTED IN SEPTEMBER
  • NEXT SLIDE, PLEASE
  • SO LET'S TALK ABOUT LEVEL OF SERVICE
  • LEVEL OF SERVICE IS A TERM USED TO QUALITATIVELY DESCRIBE THE OPERATING CONDITIONS OF A ROADWAY BASED UPON FACTORS SUCH AS SPEED, TRAVEL TIME, MANEUVERABILITY, DELAY AND SAFETY
  • THE LEVEL OF SERVICE OF A FACILITY IS DESIGNATED WITH A LETTER A TO F WITH A REPRESENTING THE BEST OPERATING CONDITION AND F THE WORST FROM A ROADWAY DESIGN PERSPECTIVE
  • THE AMERICAN ASSOCIATION OF STATE HIGHWAYS AND TRANSPORTATION OFFICIALS, ALSO CALLED ASHTO, RECOMMENDS THAT WE DESIGNED TO A LEVEL OF SERVICE D CONDITION
  • LEVEL SERVICE IS TYPICALLY MEASURED DURING THE PEAK PERIOD OF ACTIVITY FOR THIS PORTION OF THE AIRPORT ROADWAY SYSTEM
  • THE PEAK PERIOD IS THE EVENING PEAK, WHICH TYPICALLY OCCURS BETWEEN 08:00 P.M
  • AND 11:00 P.M
  • AT NIGHT FOR A TYPICAL AUGUST SUMMER DAY IN 2019, WHICH CORRESPONDS TO AN OVERALL AIRPORT ACTIVITY LEVEL OF NEARLY 52 MILLION ANNUAL PASSENGERS
  • THE LEVEL OF SERVICE WAS AT F FOR A FUTURE YEAR CONDITION WITH AN OVERALL AIRPORT ACTIVITY LEVEL OF 61 MILLION ANNUAL PASSENGERS
  • THE LEVEL OF SERVICE REMAINED AT F WITHOUT ANY IMPROVEMENTS
  • IF WE IMPLEMENTED THE PROJECT, THE LEVEL OF SERVICE IMPROVED TO D
  • NEXT SLIDE, PLEASE
  • THE NEXT QUESTION YOU ASKED WAS ABOUT ROADWAY CONGESTION AND HOW THAT CHANGED OVER TIME
  • THE GRAPHICS YOU SEE ON THE LEFT ARE CALLED HEAT MAPS
  • THEY DEPICT TIME ACROSS THE TOP AND TRAVEL SPEED OVER THE LENGTH OF THE ROADWAY SEGMENT DOWN THE SIDE AND VISUALLY SHOW THE DEGREE OF ROADWAY CONGESTION
  • AT THE TOP OF THE HEAT MAP IS THE TRAVEL SPEED AT THE ENTRANCE TO THE TERMINAL CURB
  • SIDE AT THE BOTTOM IS THE INTERCHANGE WITH STATE ROCK 518, AND THERE ARE OTHER LOCATIONS MARKED FOR YOUR REFERENCE, INCLUDING THE ARRIVALS, DEPARTURES DECISION POINT, THE SOUTH 170TH STREET BRIDGE, THE RETURN TO TERMINAL LOOP RAMP AND THE SOUTH 160TH STREET BRIDGE
  • THESE GRAPHICS SHOW THE QUEUE LINKS FOR THE MORNING, NOON AND EVENING PEAK PERIODS FOR AN AVERAGE AUGUST DAY IN 2019
  • IN THE MORNING AND NOONING PEAK PERIODS, THE QUEUE EXTENDS BACK TO THE SOUTH 170 STREET BRIDGE AREA, WHICH IS ADJACENT TO THE CELL PHONE LOT
  • IN THE EVENINGS
  • THE CONGESTION IS WORSE AND EXTENDS PAST THE RETURN TO TERMINAL LOOP RAMP MERGE, BUT NOT QUITE TO THE SOUTH 160 TH STREET BRIDGE, WHICH IS ADJACENT TO THE CLOCK TOWER
  • NEXT SLIDE, PLEASE
  • THIS SLIDE SHOWS THE HEAT MAPS FOR THE EVENING PEAK CONDITION FOR EXISTING AND FUTURE YEAR, NO BUILD, AND WITH PROJECT CONDITIONS WITH NO IMPROVEMENTS, THE CONGESTION IS MUCH WORSE
  • THIS IS DEPICTED IN THE MIDDLE HEAT MAP WITH QUEUING BACK TO NEARLY THE I FIVE INTERCHANGE
  • WITH THE PROJECT IMPROVEMENTS, THE LEVELS OF CONGESTION ARE SIGNIFICANTLY REDUCED
  • THIS IS DEPICTED IN THE FAR RIGHT HEAT MAP WITH QUEUING BACK TO THE DEPARTURE'S ARRIVALS DECISION POINT
  • NEXT SLIDE ONE OF THE GOALS FROM RESOLUTION 37 59
  • THE GRAND TRANSPORTATION POLICY DIRECTIVE IS TO MAINTAIN A MAXIMUM 15 MINUTES TRAVEL TIME FROM THE CLOCK TOWER TO THE THERMAL CURBSIDE OR PARKING GARAGE
  • WE HAVE PROVIDED THE AVERAGE TRAVEL TIMES FOR THE AUGUST AVERAGE DAY EVENING PEAK PERIOD FOR EXISTING AND FUTURE YEAR
  • NO BUILD AND WITH PROJECT CONDITIONS, AS YOU CAN SEE, WITHOUT THE IMPROVEMENTS, THE AVERAGE TRAVEL TIMES WILL EXCEED 15 MINUTES, AND WE WILL NOT MEET THAT GOAL IN THE FUTURE
  • NEXT SLIDE PLEASE THE NEXT QUESTION YOU ASK DEALT WITH LANE FLEXIBILITY AND SPECIFICALLY THE APPLICATION OF HOV LANES, WHICH ARE ALSO CALLED PREFERENTIAL LANES
  • THE REVISED CODE OF WASHINGTON CURRENTLY LIMITS THE USE OF PREFERENTIAL LANES TO PUBLIC TRANSPORTATION MOTORCYCLES, PRIVATE VEHICLES WITH A SPECIFIED NUMBER OF PASSENGERS, WHICH FOR MOST OF THE REGION IS TWO OR MORE AND COMMERCIAL GROUND TRANSPORTATION SERVICES THAT HAVE THE CAPACITY TO CARRY EIGHT OR MORE PASSENGERS
  • NEXT SLIDE, PLEASE
  • WHEN THE PROJECT WAS ORIGINALLY DEFINED IN 2018, THE UTILIZATION OF PREFERENTIALIZED WAS NOT IDENTIFIED FOR CONSIDERATION
  • HOWEVER, GIVEN THE QUESTIONS THAT YOU ASKED, WE ASKED OUR DESIGN TEAM TO EVALUATE HIV LANES, AND WE HAVE NOTED SOME CHALLENGES
  • THE REGIONAL TRANSPORTATION SYSTEM INCLUDES A NETWORK OF PREFERENTIAL LANES THAT SUPPORTS HIV MODES
  • THE SYSTEM CURRENTLY ENDS AT THE I FIVE INTERCHANGE, AND THERE ARE CURRENTLY NO PLANS TO EXTEND THEM INTO THE STAIR UP TO 518 CORRIDOR
  • IF HIV LANES WERE PROVIDED ON THE AIRPORT ROADWAY SYSTEM, ADDITIONAL WORK WOULD BE REQUIRED TO CONNECT THEM INTO THE LARGER REGIONAL NETWORK
  • HV LANES ARE TYPICALLY DEFINED AS TWO OR MORE PASSENGERS IN THE REGION
  • THE MAJORITY OF PRIVATE VEHICLES ENTERING THE AIRPORT CURRENTLY MEET THAT DEFINITION, THUS REDUCING THE BENEFIT OF AN OCCUPANCY RELATED PREFERENTIAL LANE
  • THE EXISTING TERMINAL ROADWAY SYSTEM IS CURRENTLY CONSTRAINED BY THE LIGHT RAIL GUIDEWAY ON THE EAST AND AIRCRAFT GATES ON THE WEST
  • THERE IS ONLY ENOUGH ROOM TO PROVIDE SIX TRAVEL LANES AND FUTURE CONDITIONS
  • MODELING HAS SHOWN THAT WE NEED TO BALANCE LANE CAPACITY WITH FACILITY CAPACITY TO ENSURE SAFE AND EFFICIENT OPERATIONS
  • AND LASTLY, THE AIRPORT TERMINAL ROADWAY SYSTEM IS COMPLEX WITH RAMPS ON BOTH SIDES OF THE ROADWAY
  • BECAUSE OF ALL THE MERGING, DIVERGING AND WEAVING SECTIONS, A CONTINUOUS, PREFERENTIAL LANE IS NOT FEASIBLE
  • AN EXAMPLE OF THIS IS WHEN THE STATE FIRST IMPLEMENTED THE RIGHT HAND HOV LANES ON STATE ROUTE 520
  • AT EACH INTERCHANGE
  • THE HOV LANES WERE SUSPENDED SO THAT TRAFFIC COULD THEN MERGE INTO THE RIGHT LANE AND USE THE HOV LANE TO EXIT THE HIGHWAY AND THEN DO THE REVERSE WITH THE ON RAMP WHERE THEY WOULD MERGE INTO THAT HOV LANE AND THEN CHANGE ANOTHER LANE TO GET INTO THE GENERAL PURPOSE LANE
  • TRAVEL WAS ALSO DELAYED IN THE HOV LANES GIVEN THE QUEUEING OF TRAFFIC WAITING TO MERGE INTO THE ADJACENT GENERAL PURPOSE LANES DURING PEAK PERIODS
  • NEXT SLIDE, PLEASE
  • THIS SLIDE SHOWS THE LANE CONFIGURATION OF THE EXISTING ROADWAY SYSTEM AS YOU TRAVEL FROM STAY ROUTE 518 TO THE TERMINAL
  • STAY ROUTE 518 IS LOCATED ON THE RIGHT SIDE OF THE EXHIBIT AND THE TERMINAL IS ON THE LEFT SIDE OF THE EXHIBIT
  • AT THE BEGINNING WE HAVE ONE LANE COMING FROM EASTBOUND STATE ROUTE 518 AND TWO LANES FROM WESTBOUND STATE ROUTE 518 THAT PROVIDE A TOTAL OF THREE TRAVEL LANES ENTERING THE AIRPORT AT THE NORTH
  • AS YOU TRAVEL A LITTLE FURTHER SOUTH, WE THEN HAVE TWO LANES BEING ADDED ON THE RIGHT HAND SIDE FROM THE RETURN TO TERMINAL LOU RAMP
  • THESE TWO LANES THEN MERGE INTO ONE LANE, PROVIDING A TOTAL OF FOUR LANES CONTINUING SOUTH
  • WE THEN HAVE A LEFT HAND OFF RAMP TO SOUTH ON 70TH STREET WITH ONLY THREE TWO LANES THEN CONTINUING TO THE TERMINAL
  • SHORTLY AFTER THAT, WE THEN HAVE A RIGHT HAND ON RAMP FROM AIR CARGO ROAD THAT ADDS A LANE FOR A TOTAL OF FOUR TRAVEL LANES THAT CONTINUE TOWARDS THE DEPARTURES, ARRIVALS AND PARKING DECISION POINT
  • AT THAT POINT THE ROADWAY SPLITS WITH TWO LANES CONTINUING TO DEPARTURES AND TWO LANES CONTINUING TOWARDS ARRIVALS AND PARKING
  • IF YOU CONTINUE ALONG THE PATH TO ARRIVALS, THERE IS ALSO LEFT HAND EXITS TO PARKING AND THEN SHORTLY AFTER THAT TO THE GROUND TRANSPORTATION CENTER
  • GIVEN THE COMBINATION OF LEFT AND RIGHT HAND RAMPS, AIRPORT TRAFFIC IS CHANGING LANES ACROSS ALL TRAVEL LANES FROM THE SOUTH 160TH STREET AREA TO THE DEPARTURES, ARRIVALS AND PARKING DECISION POINT
  • A CONTINUOUS PREFERENTIAL LANE FROM, SAY, ROCK 518 IS NOT FEASIBLE WITH THIS COMPLEX OF A ROADWAY SYSTEM
  • ONE QUESTION YOU MAY ASK IS CAN A PREFERENTIAL LANE BE IMPLEMENTED WITH THE FUTURE ROADWAY SYSTEM PROPOSED AS PART OF THE SUSTAINABLE AIRPORT MASTER PLAN, THE PROPOSED FUTURE ROADWAY SYSTEM WOULD STILL HAVE A NUMBER OF THE COMPLEXITIES OF THE EXISTING ROADWAY SYSTEM THAT I JUST REVIEWED WITH YOU, BUT WE CAN EVALUATE THAT FURTHER DURING THE COMING YEAR AS WE ARE CURRENTLY WORKING ON THE PROJECT DEFINITION DOCUMENT FOR THAT PROJECT
  • NEXT SLIDE, PLEASE
  • THE BEST OPTION THE DESIGN TEAM COULD FIND FOR A PREFERENTIAL LANE WOULD BE TO PROVIDE ONE STARTING AT THE DEPARTURES, ARRIVALS AND PROJECT DECISION AND PARKING DECISION POINT
  • THE PREFERENTIAL LANE WOULD PROVIDE ACCESS FOR PUBLIC TRANSIT, AIRPORTERS AND RENTAL CAR BUSES TO THE ARRIVALS CURBSIDE
  • THIS EXHIBIT SHOWS THIS CONCEPT WITH SOUTH 170 TH STREET ON THE RIGHT AND THE TERMINAL PARKING GARAGE ON THE LEFT
  • FOR THIS CONCEPT, WE WOULD STILL WIDEN THE AIRPORT ROADWAY SYSTEM TO SIX LANES IN THE ORANGE TRANSITION ZONE AND THEN MAINTAIN TWO LANES OF DEPARTURES THAT ARE DEPICTED IN GRAY
  • WE WOULD PROVIDE ONE PREFERENTIAL LANE TO ARRIVALS AS DEPICTED IN GREEN AND TWO LANES, TWO ARRIVALS AND THE GROUND TRANSPORTATION CENTER AS DEPICTED IN BLUE AND ONE LINE TO PARKING AS DEPICTED IN PURPLE
  • NEXT SLIDE, PLEASE
  • WE THEN EVALUATED THIS CONCEPT FOR THE FUTURE CONDITION
  • THE HEAT MAPS PROVIDED ARE FOR FUTURE AUGUST EVENING PEAK CONDITION AND DEPICT THE NO BUILD CONDITION ON THE LEFT
  • THE PREFERENTIAL LANE CONCEPT I JUST SHARED WITH YOU IN THE MIDDLE AND THE WITH PROJECT IMPROVEMENTS ON THE RIGHT
  • AS YOU CAN SEE FROM THE RESULTS, THE PREFERENTIAL LANE CONCEPT SHOWS SOME MINOR IMPROVEMENT OVER THE NOBLE CONDITION AND QUEUING WOULD EXTEND BACK ON TO STAY RIGHT 518 TOWARDS THE I FIVE INTERCHANGE
  • I KNOW ONE OF THE COMMENTS MADE BY THE COMMISSIONERS DURING OUR MEETING IN SEPTEMBER WAS TO LOOK AT SOME AVI VIDEOS OF THE TRAFFIC MODELING OF THESE SCENARIOS, AND UNFORTUNATELY, WE WEREN'T ABLE TO INCLUDE THEM IN THIS PRESENTATION DUE TO TECHNOLOGY LIMITATIONS, BUT THEY WERE FORWARDED TO YOU THIS MORNING VIA EMAIL, AND SO YOU SHOULD HAVE HAD ACCESS TO THEM
  • NEXT SLIDE PLEASE SO GIVEN THE COMPLEXITY OF THE EXISTING ROADWAY SYSTEM, PREFERENTIAL LENGTH MAY NOT BE THE BEST TOOL IN OUR TOOLBOX TO MEET OUR GROUND TRANSPORTATION GOALS
  • HOWEVER, THE PROJECT IS PROVIDING PREFERENTIAL ACCESS, WHICH DOES SUPPORT OUR GROUND TRANSPORTATION GOALS
  • THE CAPACITY IMPROVEMENTS ARE PROVIDING A DEDICATED LANE TO PUBLIC PARKING AS SHOWN IN PURPLE AND GROUND TRANSPORTATION AS SHOWN IN GREEN WHILE STILL MAINTAINING THE TWO LANES, TWO ARRIVALS AS SHOWN IN BLUE AND THE TWO LANES TO DEPARTURES AS SHOWN IN GRAY
  • THIS ALLOWS US TO INCREASE THE UTILIZATION OF THESE MODES, WHICH, AS YOU HEARD IN THE PREVIOUS PRESENTATION, IS ESSENTIAL TO OUR GROUND TRANSPORTATION GOALS
  • THESE ROADWAY IMPROVEMENTS ALSO BALANCE LANE CAPACITY WITH FACILITY CAPACITY
  • AS THE ACCESS FEE AND TRAFFIC MODELING WORK IS COMPLETED NEXT YEAR, WE CAN CONSIDER FUTURE DECISIONS REGARDING PREFERENTIAL CURBSIDE ACCESS AND THE LANE CAPACITY IS THEN AVAILABLE TO SUPPORT THOSE DECISIONS
  • NEXT SLIDE, PLEASE
  • THE NEXT TWO QUESTIONS THAT YOU ASKED ARE ASSOCIATED WITH THE PROJECT'S ENVIRONMENTAL REVIEW AND THE SUSTAINABLE AIRPORT MASTER PLAN
  • MY COLLEAGUE STEVE RIVAL, A SENIOR ENVIRONMENTAL PROGRAM MANAGER FROM THE AVIATION ENVIRONMENTAL PROGRAM GROUP, WILL ADDRESS THOSE QUESTIONS
  • THANKS, HEATHER
  • GOOD AFTERNOON, COMMISSIONERS
  • I WANTED TO PROVIDE AN OVERVIEW OF THE ENVIRONMENTAL REVIEW THAT WAS CONDUCTED FOR THE WIDENED ARRIVAL'S ROADWAYS PROJECT
  • THE PORTFOLIO SEPARATE REQUIREMENTS IN A REVIEW OF THE PROJECT, INCLUDING THE DEVELOPMENT OF A STEEPA CHECKLIST PUBLICATION OF A DRAFT DETERMINATION OF NON SIGNIFICANT AND PROVISION FOR PUBLIC COMMENT
  • THE CHECKLIST WAS COMPLETED IN MAY, CONSIDERED POTENTIAL CONFLICTS WITH LAND USE PLANS AS WELL AS AN EXPLORATION OF POTENTIAL TRANSIT IMPACTS IN THIS CASE
  • AND WHAT IS IN FRONT OF YOU TODAY? A PROJECT THAT WOULD MODIFY A PORTION OF THE EXISTING ROADWAY AND ACCESS TO THE TERMINAL AND GARAGE TO RELIEVE EXISTING CONGESTION
  • THE CHECKLIST NOTES THE SERVICE THE ARRIVALS DRIVE PROVIDES TO MULTIPLE TRANSPORTATION MODES TO ACCESS THOSE FACILITIES
  • THE PUBLIC COMMENT PERIOD YIELDED ONE COMMENT FROM THE DEPARTMENT OF ECOLOGY IDENTIFYING THE POTENTIAL OF SOIL CONTAMINATION RELATED TO THE HISTORIC ASARCO SMELTER
  • WE RECEIVED THIS COMMENT ON MOST AVIATION PROJECTS
  • IN JUNE, THE PORT ISSUED A DETERMINATION OF NON SIGNIFICANCE BASED ON THE REVIEW OF THE SEAFOOD CHECKLIST AND THE OUTCOME OF THE PUBLIC COMMENT PERIOD
  • NEXT SLIDE, PLEASE
  • CAN I INTERRUPT THIS AGAIN? ARE WE TALKING ABOUT A ASARCO DOWN AT RUSTON WAY? YOU'RE CORRECT, COMMISSIONER FELLEMAN
  • THERE'S NOT ANOTHER ONE
  • WOW
  • HAVE WE EVER FOUND POLLUTION FROM? I DON'T BELIEVE SO, BUT I'D BE HAPPY TO GET BACK TO YOU ON THAT QUESTION, BUT YOU SAY ECOLOGY TELLS US TO LOOK FOR IT
  • EVERY SINGLE SEPA CHECKLIST THAT WE DO, WE HAVE A COMMENT FOCUSED ON THE HISTORIC CONTAMINATION
  • YES
  • INTERESTING
  • LONG DISTANCE
  • THANK YOU
  • YEAH
  • A QUESTION AROSE ON HOW THIS PROJECT RELATES TO THE CURRENT SUSTAINABLE AIRPORT MASTER PLAN
  • NEAR TERM PROJECTS ENVIRONMENT REVIEW THE WIDENED ARRIVALS ROADWAYS IS INDEPENDENT OF THE STAMP NEAR TERM PROJECTS AS THE PROJECT ADDRESSES EXISTING DEMAND, WHEREAS THE ST NEAR TERM PROJECT ADDRESSES FUTURE DEMAND
  • THE PROJECT IS NEEDED WITH OR WITHOUT THE STAMP NEAR TERM PROJECTS
  • AS THE STAMP NEAR TERM PROJECTS WERE DEVELOPED, THE WIDE RIVALS ROADWAYS PROJECT AND THE NORTH AIRPORT EXPRESSWAY RELOCATION
  • A SAM NEAR TERM PROJECT SHOWED AN OPPORTUNITY FOR CONSTRUCTING THE PROJECTS TOGETHER AND WAS INCLUDED WITHIN THE SAM NEAR TERM PROJECT ENVIRONMENT REVIEW
  • ORIGINALLY IN ADDITION, A PROPOSED EXPANDED UTILITY CORRIDOR, AN INFRASTRUCTURE ASSOCIATED WITH SAM NEAR TERM PROJECTS, WAS CONSIDERED WITHIN THE WINE ARRIVALS ROADWAY PROJECT DUE TO DELAYS IN THE NEAR TERM PROJECTS
  • PLANNING AND ENVIRONMENT REVIEW AND THE DETERMINATION THAT THE PROPOSED EXPANDED UTILITY CORRIDOR WOULD NOT BE PART OF THIS PROJECT
  • IT WAS REMOVED FROM THE SAM NEAR TERM PROJECT
  • ENVIRONMENT REVIEW THIS PROJECT IS NEEDED TO ADDRESS EXISTING DEMAND AS IDENTIFIED IN THE PREVIOUS SLIDE
  • ONCE IT WAS REMOVED, AN INDEPENDENT ENVIRONMENT REVIEW WAS COMPLETED AND THE PORT ISSUED A DETERMINATION OF NON SIGNIFICANCE
  • I'LL NOW TURN IT BACK TO HEATHER UNLESS THERE ARE ANY QUESTIONS, PLEASE RAISE YOUR HAND
  • IF THERE ARE QUESTIONS, OTHERWISE WE'LL JUST CONTINUE
  • I DON'T SEE ANY CURRENTLY
  • IN SUMMARY, OUR REQUEST TODAY INCLUDES THE FOUR ITEMS AUTHORIZATION TO ADVERTISE AND AWARD A MAJOR PUBLIC WORKS CONTRACT FOR THE EARLY WORK BRIDGE DEMOLITION AUTHORIZATION TO AMEND AN EXISTING SERVICE AGREEMENT TO PROVIDE DESIGN SUPPORT SERVICES THROUGH THE CONSTRUCTION OF THE PROJECT
  • AUTHORIZATION TO ENTER INTO A REIMBURSEABLE AGREEMENT WITH THE FEDERAL AVIATION ADMINISTRATION AND AUTHORIZATION OF AN ADDITIONAL 6.9 MILLION TO COMPLETE DESIGN AND THE EARLY WORK BRIDGE DEMOLITION EFFORT
  • BASED UPON OUR PROJECT SCHEDULE, WE DO NOT ANTICIPATE OR WE DO ANTICIPATE
  • EXCUSE ME, A FUTURE AUTHORIZATION REQUEST IN EARLY 2023 THAT SUPPORTS THE CONSTRUCTION OF THIS PROJECT
  • SO WITH THAT, I WILL END OUR PRESENTATION AND ASK IF THERE'S ANY INFORMATION PRESENTED ON SEPTEMBER 28 THAT NEEDS TO BE REVIEWED OR IF THERE'S ANY ADDITIONAL QUESTIONS FROM THE COMMISSION
  • CLERK
  • HART, PLEASE CALL THE ROLL FOR QUESTIONS
  • THERE IS NO VOTE ON THIS MATTER
  • YES, THERE WOULD BE A VOTE ON THIS PARTICULAR MATTER
  • IT IS FOR APPROVAL
  • I'M SORRY
  • ALL RIGHT, SO WE'LL GO AHEAD AND START WITH GO AHEAD
  • I'M SORRY
  • QUESTIONS ROLL FOR THE QUESTIONS, PLEASE
  • YES
  • FOR QUESTIONS BEGINNING WITH COMMISSIONERS STEINBRUECK
  • NO QUESTIONS JUST TO SAY THANK YOU FOR YOUR DUE DILIGENCE AND YOUR CONSIDERABLY IMPRESSIVE EFFORTS TO ADDRESS THE QUESTIONS RAISED IN THE PREVIOUS MEETING
  • I FEEL SATISFIED WITH MY QUESTIONS AND CONCERNS HAVE BEEN ANSWERED
  • I HAVE NEVER BELIEVED THAT IF YOU BUILD IT THAT YOU WILL RELEASE CONGESTION, BUILDING MORE ROADWAY RELIEVES CONGESTION
  • BUT I THINK THIS IS A FAR MORE COMPLICATED CHALLENGE HERE WITH REGARD TO THE ACCESS ROADWAY
  • IT'S NOT AS SIMPLE AS A FREEWAY OR HIGHWAY PLAN WITH AN HOV LANE TO INCENTIVIZE HIGHER OCCUPANCY VEHICLES
  • IT'S MUCH MORE COMPLICATED THAN THAT
  • AND I FEEL CONVINCED AND CONFIDENT THAT OUR ENVIRONMENTAL STAFF ARE DOING EVERYTHING POSSIBLE TO BE RESPONSIVE TO THE COMMISSION POLICY DIRECTIVE ON GROUND TRANSPORTATION ACCESS, AND THAT WE ARE WORKING TOWARDS THOSE GOALS TO REDUCE LOW OCCUPANCY PRIVATE VEHICLES TO AND FROM SEATAC, INCLUDING EMPLOYEES AND TRAVELERS, AND TO INCREASE ALL OTHER MODES TO SUPPORT OUR TRANSPORTATION GOALS AND TRIP REDUCTION GOALS AND CARBON EMISSION REDUCTIONS
  • THANK YOU VERY MUCH
  • THANK YOU COMMISSIONER STEINBRUECK, COMMISSIONER CALKINS
  • THANK YOU, CLERK HART
  • SO I HAVE A SERIES OF QUESTIONS HERE, AND I TOO, REALLY APPRECIATE THE GREAT DETAIL WITH WHICH YOU BRIEFED US EARLIER THIS MONTH AND ALSO THE CLARITY OF THE PRESENTATION TODAY FOR THE GENERAL PUBLIC AS WELL
  • MY FIRST QUESTION IS BEYOND THE EXIT RAMP TO THE THIRD FLOOR OF THE GARAGE
  • HOW MANY LANES ARE THERE? WE WOULD BE PROVIDING TWO LANES INTO THE ARRIVALS PER SIDE PAST THE THIRD FLOOR ENTRANCE
  • OKAY
  • SO THAT, FOR ME, WAS ONE OF THE KIND OF CONFOUNDING THINGS ABOUT THIS PROJECT
  • IT IS NOT, IN FACT, WIDENING ARRIVALS PER SE ARRIVALS IS UNTOUCHED BY THIS
  • IT'S LEADING UP TO THAT COURTESY VEHICLE LANE THAT LEADS TO THE THIRD FLOOR WHERE SHUTTLE BUSES AND TNCS AND OTHERS ARE EXITING THE AIRPORT DRIVE BEFORE IT SPLITS
  • TWO ARRIVALS IN THE GARAGE
  • CORRECT
  • THAT IS CORRECT
  • THE TWO LANES THAT ARE CURRENTLY TRAVELING TO ARRIVALS ARE MAINTAINED
  • WE ARE NOT PROVIDING ADDITIONAL LANE CAPACITY FOR THAT PURPOSE
  • OKAY
  • SO THERE WAS A GREAT DEAL OF CONCERN BROUGHT TO ME ABOUT THE NOTION THAT IF WE COMPLETE THIS PROJECT, WE WILL ACTUALLY INDUCE MORE DEMAND AMONGST THE VERY MODE OF TRANSPORTATION THAT WE'RE MOST INTERESTED IN REDUCING AT SEA TAC, WHICH IS THE PRIVATE VEHICLE PICK UP AND DROP OFF AT THE AIRPORT, AND PARTICULARLY ON ARRIVALS, BECAUSE THE STAFF TAUGHT ME OVER THE LAST MONTH
  • ARRIVALS IS PARTICULARLY PRONE TO CONGESTION BECAUSE THE TIME THAT A PRIVATE VEHICLE SPENDS CURBSIDE IS SIGNIFICANTLY GREATER THAN A DEPARTURE
  • IF YOU'RE COMING TO DROP A LOVED ONE OFF, YOU DROP THEM OFF AND THEY GO IF YOU'RE COMING TO PICK THEM UP, THERE MAY BE SOME DISCONNECT BETWEEN WHEN PASSENGER DISEMBARKS A PLANE GETS THEIR BAG AND IS ABLE TO GET THE CURB SIDE
  • AND SO THERE'S A MUCH LIKELIER CHANCE OF CONGESTION ON ARRIVALS
  • CORRECT
  • I DO BELIEVE THAT THE DWELL TIME ON ARRIVALS ARE LONGER THAN DEPARTURES, BUT I HAVEN'T SEEN THOSE METRICS IN A WHILE
  • OKAY, SO AS I HAVE BEEN MAKING MY DECISION ON THIS, WHICH HAS BEEN A PRETTY TOUGH DECISION BECAUSE IT INITIALLY FELT TO ME LIKE A DECISION IN WHICH WE WERE COMPELLED TO PRIORITIZE TWO VERY IMPORTANT VALUES TO US, THE VALUES AROUND ENVIRONMENTAL SUSTAINABILITY AND THE VALUES AROUND THE NEED FOR THIS AIRPORT TO RUN SMOOTHLY AND EFFICIENTLY AND FOR US TO HAVE AN EXCELLENT PASSENGER EXPERIENCE
  • WHAT I CAME TO REALIZE THAT IN FACT, I DON'T BELIEVE THIS IS A SOPHIE'S CHOICE FOR US
  • I BELIEVE THAT THIS SERVES BOTH GOALS, PROVIDED THAT ONE OTHER THING HAPPENS, WHICH IS THAT ALL OF THE ITEMS THAT WE TALKED ABOUT IN THE FIRST BRIEFING RUN CONCURRENTLY AND ARE CARRIED OUT SUFFICIENTLY AT THE SAME TIME AS THIS PROJECT IS CONDUCTED, AND UNFORTUNATELY, WE CAN'T WED THESE TWO THINGS
  • WE CAN'T PASS THIS ONE ON THE CONDITION THAT ALL OF THOSE OTHER THINGS HAPPEN IN PART BECAUSE THE TIMELINES DON'T ALIGN, BUT ALSO BECAUSE MUCH OF WHAT WE NEED TO DO TO REDUCE OUR PASSENGERS USE OF THE LEAST EFFICIENT MODE, PRIVATE VEHICLE DROP OFF AND PICK UP REQUIRES A GREAT DEAL OF STUDY AND ADDITIONAL TIME BEFORE WE DETERMINE WHICH METHODS ARE BEST AT REDUCING THE USE OF PRIVATE VEHICLES TO PICK UP AND DROP OFF THINGS LIKE ACCESS FEE OR A TMA OR MASSAGE INCENTIVES, ET CETERA
  • THOSE THINGS
  • I AM AT THE POINT WHERE I HAVE A LOT OF TIME WITH STAFF ON THIS PARTICULAR ISSUE
  • I'M CONVINCED THAT STAFF IS NOT SIMPLY PROVIDING THESE OPTIONS AS A MEANS OF GETTING THIS VOTE THROUGH, BUT BECAUSE STAFF EARNESTLY BELIEVES THAT IF WE DO NOT REDUCE THE PERCENTAGE OF PASSENGERS COMING TO SEE TACK IN PRIVATE VEHICLES, WE WILL NOT HAVE CAPACITY
  • WHETHER WE BUILD THIS OR NOT, WE REALLY DO NEED TO SHIFT PEOPLE TO MORE EFFICIENT MODES
  • AND SO I THINK OUR MOTIVES ARE ALIGNED HERE, AND FOR THAT REASON, I INTEND TO VOTE FOR THIS
  • SO THANKS FOR THE PRESENTATION
  • THANK YOU, COMMISSIONER
  • MOVING TO COMMISSIONER BOWMAN
  • GREAT
  • WELL, THE STAFF ANSWERED A LOT OF THE QUESTIONS THAT I HAD
  • I'M HOPING THAT I CAN GET A LITTLE BIT MORE INFORMATION
  • I BELIEVE THAT COMMISSIONERS JOE RECUSED HIMSELF OF VOTING ON THIS ITEM, AND I RECALL WHEN WE BROUGHT IT UP IN SEPTEMBER
  • I DON'T REMEMBER REFUSAL BACK THEN
  • AND SO COMMISSIONER CHOKE, YOU COULD MAYBE PROVIDE A LITTLE BIT MORE DETAILS ABOUT YOUR RECUSAL FOR THIS
  • AND IF LEGAL HAD WEIGHED IN ON THAT BACK IN SEPTEMBER WAS NOT REGARDING THE APPROVAL OF ANYTHING
  • IT WAS REGARDING WHETHER OR NOT WE WOULD POSTPONE IT
  • SO THERE'S TWO DIFFERENT MATTERS
  • NO, I APPRECIATE THAT
  • I JUST DIDN'T REMEMBER
  • AND PERHAPS I'M NOT REMEMBERING CORRECTLY
  • I JUST DON'T REMEMBER ANY CONCERNS YOU HAD IN SEPTEMBER
  • AM I REMEMBERING CORRECTLY THAT THIS ISSUE WAS NOT BROUGHT UP IN SEPTEMBER? I'M SORRY
  • I DON'T UNDERSTAND YOUR QUESTION WHEN THE STAFF BRIEFED US ABOUT THIS ISSUE AND WE'RE GETTING READY TO VOTE ON IT IN SEPTEMBER AND I ASKED FOR IT TO BE DELAYED
  • I DON'T REMEMBER DURING THAT DISCUSSION THAT YOU HAD BROUGHT UP YOUR EMPLOYMENT AS A REASON TO RECUSE YOURSELF FROM TALKING ABOUT THIS ISSUE
  • I'M WONDERING, DID I REMEMBER THAT CORRECTLY? THIS IS THE FIRST TIME I REMEMBER HEARING ABOUT YOUR RECUSAL, IF I COULD
  • MICHELLE, YES, PLEASE
  • THIS IS AARON PRITCHARD, INTERIM CHIEF STAFF
  • WHEN THIS ITEM FIRST CAME UP, WE DID NOT BRING UP THE QUESTION AROUND SAM'S RECUSAL
  • IT WAS THE SORT OF INTEGRATION OF THE DISCUSSION AROUND THE GROUND TRANSPORTATION POLICY THAT RAISED THE ISSUE OF COMMISSIONER CHOSE REFUSAL BECAUSE OF THE ISSUE AROUND A POTENTIAL FOR SOME SORT OF PREFERRED LANE OR SOMETHING THAT MIGHT PROVIDE A HIGHER BENEFIT TO TNCS
  • THAT WAS THE QUESTION THAT WE SUBMITTED TO OUR COUNCIL TO CONSIDER FOR RECUSAL, AND HE SUPPORTED THAT HE SHOULD RECUSE HIMSELF BECAUSE OF THOSE TWO ISSUES COMING TOGETHER
  • THE ORIGINAL ISSUE DIDN'T RAISE THAT SAME QUESTION
  • THANKS
  • GOT IT
  • THANK YOU, ERIN
  • THAT'S SUPER HELPFUL
  • THANKS
  • I WAS REMEMBERING THAT CORRECTLY, AND I DIDN'T HAVE THAT BACKGROUND AS TO WHY THAT WAS HAPPENING NOW
  • OKAY, WELL, I WANT TO SAY I AGREE WITH MR STEINBRUECK AND COMMISSIONERS AS WELL, BUT IT DOES SOUND LIKE THIS IS A VITALLY IMPORTANT PROJECT JUST FOR THE GENERAL OPERATION OF CTC
  • THAT SAID
  • AND I APPRECIATE SO MUCH THAT THE STAFF CALLED OUT THAT THERE WAS EXACTLY ONE COMMENT DURING ENVIRONMENTAL VIEW, AND IT REALLY HAD ACTUALLY NOTHING TO DO WITH THE PROJECT ITSELF
  • BUT I DON'T WANT US TO TAKE THAT AS THOUGH THE PUBLIC DOESN'T CARE, BECAUSE I KNOW THAT CERTAINLY IN THE LAST COUPLE OF MEETINGS, MAYBE SOMEBODY CAN MEET THEMSELVES IN THE LAST COUPLE OF MEETINGS
  • WE'VE HAD THE PUBLIC WEIGH IN ON THIS PROJECT, AND I DON'T BELIEVE THAT THEY REALLY UNDERSTAND THERE HASN'T BEEN A CLEAR EXPLANATION OF AGAIN, THE REAL NEED FOR IT
  • IT DOES SEEM AS THOUGH ALL WE'RE DOING IS BUILDING MORE CONCRETE TO THE AIRPORT, THEREFORE ALLOWING MORE VEHICLES TO COME IN, WHICH WOULD FURTHER CONGEST THE OTHER ROADWAYS AND INCREASE THE ENVIRONMENTAL INJUSTICE FOR THOSE COMMUNITIES AROUND THE AIRPORT
  • AND SO I'M JUST WEIGHING IN HERE AS MY TIME ON THE COMMISSION OVER MANY YEARS, I'M GOING TO ASK, I DON'T THINK IT'S GOING TO HAPPEN BUT I WOULD ASK THAT WE ALLOW THE NEWLY ELECTED COMMISSIONERS TO WEIGH IN ON THIS
  • THEY HAVE STRONG VIEWS ABOUT THE FUTURE OF THE AIRPORT, AND I THINK THAT THIS PARTICULAR PROJECT IS ONE THAT THEY SHOULD GET UP TO SPEED ON
  • WELL, I KNOW THAT THE STAFF WILL SAY IF I MIGHT CONTINUE WELL, I KNOW THAT THE REQUEST IS ONLY TO AUTHORIZE DESIGN
  • WE ALL KNOW THAT ONCE MONEY IS SPENT ON DESIGN, IT REALLY IS PRETTY MUCH A GO WITH THE PROJECT
  • AND SO I REALLY CAN'T EVEN RECALL IN MY YEARS ON THE COMMISSION A SIGNIFICANT TIME WHEN WE HAVE SPENT MONEY ON DESIGN AND THEN LATER SAID, MADE THE DECISION TO NOT MOVE FORWARD WITH THE PROJECT AND GIVEN HOW CRITICAL IT IS TO THE FUTURE OF THE AIRPORT, I JUST WANT TO AGAIN BE CLEAR
  • I SUPPORT THE CONCEPT
  • SO I'M NOT ASKING FOR A DELAY OF 60 DAYS IN ORDER TO NOT HAVE THIS GO THROUGH
  • I'M ASKING FOR A DELAY BECAUSE I DO THINK THAT IT WOULD BE IN THE RIGHT SPIRIT OF DISCLOSURE FOR THE NEW COMMISSIONERS TO BE ABLE TO HAVE AN OPPORTUNITY TO BETTER UNDERSTAND THIS BEFORE IT MOVES FORWARD AND TO GIVE THEIR THOUGHTS ON IT, GIVEN THEIR THOUGHTS ON THE FUTURE OF THE AIRPORT
  • AGAIN, I UNDERSTAND
  • AND WHEN I ASKED THE STAFF TO BE CLEAR WHEN I ASKED WHAT THE DELAY WOULD COST, WHAT I WAS TOLD WAS IT WOULDN'T THE BRIDGE DEMOLITION
  • THERE'S NOT AN ISSUE WITH THAT
  • AND IT WOULD JUST BE THE COST OF DELAY
  • WELL, THE COST OF DELAY WOULD BE 60 DAYS
  • AND I JUST DON'T SEE THAT AS BEING SUCH A BARRIER THAT WE WOULDN'T GIVE NEW COMMISSIONERS AN OPPORTUNITY TO WEIGH IN
  • THANK YOU
  • THANK YOU
  • COMMISSIONERS FELLEMAN, QUESTIONS OR COMMENTS FOR STAFF ON THIS ITEM
  • IS THAT A MOTION, COMMISSIONER BOWMAN OR NOT? I DIDN'T HEAR THERE WAS A MOTION
  • I CAN MAKE IT INTO MOTION
  • I MEAN, I DON'T ANTICIPATE YES, I'LL MAKE IT INTO MOTION
  • I DON'T ANTICIPATE IT
  • OKAY
  • I'LL SECOND IT FOR THE PURPOSE OF DISCUSSION
  • MR COMMISSION PRESIDENT THE COMMISSIONERS PRESIDENT TO THE COMMISSIONERS
  • LET'S GET THE MAIN MOTION ON THE FLOOR FIRST, AND THEN IF THERE'S A MOTION TO POSTPONE TO A TIME CERTAIN IT WOULD BE IN ORDER AT THAT TIME
  • MR COMMISSIONERS, I'LL MAKE A MOTION FOR THE ORIGINAL PASSAGE
  • MICHELLE, THANK YOU, COMMISSIONER BOWMAN, BEFORE WE GO THERE, MR COMMISSION PRESIDENT, DID YOU HAVE ANY QUESTIONS OR COMMENTS FOR STAFF? I BELIEVE HER REQUEST IS JUST TO POSTPONE USUALLY WOULD BE TO A DATE CERTAIN
  • AND THAT COMMISSIONER STEINBRUECK SECOND DIGIT
  • SO I DON'T HAVE ANY QUESTIONS ABOUT THE DISCUSSION AT HAND
  • THE PRESENTATION WAS VERY ACCURATE AND OR CLEAR, AND I BELIEVE MOST OF THE QUESTIONS HAVE BEEN ADDRESSED
  • I STILL THINK THAT THERE ARE EXPENSIVE THINGS THAT COULD BE DONE IN TERMS OF GETTING INTO THE AIRPORT AND WORKING WITH THE STATE HIGHWAYS, LOOKING AT A MORE LONG TERM PLAN
  • BUT IN THE MEANTIME, IT SOUNDS LIKE WE'RE WORKING WITH THE CARS THAT WERE DEALT
  • AND I THINK IT'S THE PLANNING NOW WORKING WITH WHAT WE'VE GOT IS GOING TO BE THE CHALLENGE IN FRONT OF US
  • SO I'M PREPARED TO SUPPORT THIS
  • THANK YOU, MR COMMISSION PRESIDENT
  • LET'S GO AHEAD AND GET THE MAIN MOTION ON THE FLOOR
  • WE SHOULD ALSO HEAR FROM EXECUTIVE DIRECTOR METRUCK IF HE HAS ANY COMMENTS IN THIS REGARD AFTER THE MAIN MOTION IS ON THE FLOOR, AND THAT IS A MOTION TO ADOPT ITEM NINE
  • THE COMMISSIONER BOWMAN, WERE YOU THE SECOND ON THAT? SURE
  • I'LL BE THE SECOND ON IT
  • THANK YOU
  • EXECUTIVE DIRECTOR METRUCK, DID YOU WANT TO SPEAK TO A POTENTIAL POSTPONEMENT? YES, SIR
  • THANKS, CLERK HART
  • THANKS, COMMISSIONERS
  • AND THANK YOU FOR YOUR DEEP CONSIDERATION THIS AND YOUR THOUGHTFUL COMMENTS
  • ALL THE COMMISSIONERS ON THIS, I WOULD NOT SUPPORT A DELAY, AS I STATED IN THERE
  • AND EVEN THOUGH I KNOW COMMISSIONER BOWMAN ADDRESSED IT, THIS IS FOR DESIGN MOVING FORWARD
  • AND I THINK THAT'S IMPORTANT
  • I THINK A FUTURE COMMISSION WHEN CONSTITUTED, EVEN THOUGH WE SAY THAT WE HAVEN'T DONE THAT, I DON'T KNOW IF THAT'S TRUE IF WE'VE MOVED TO DESIGN AND WE'VE NOT MOVED FORWARD, BUT THAT IS ACTUALLY THE ACTION HAS TO BE TAKEN IN ORDER TO MOVE FORWARD, ANSWERING ANY QUESTIONS THEN
  • SO AT THIS TIME, I SUPPORT NOT SUPPORT DELAYING THIS FOR FURTHER CONSIDERATION TO DIFFERENT COMMISSION THROUGH THE COMMISSION PRESIDENT TO COMMISSIONER BOWMAN
  • COMMISSIONER BOWMAN, IF YOU WANTED TO MAKE A MOTION TO POSTPONE AT THIS TIME, IT WOULD BE IN ORDER
  • OKAY
  • WELL, I'M GOING TO MAKE A MOTION TO POSTPONE THIS ITEM UNTIL THE FIRST MEETING OF THE COMMISSION IN 2022, AND THE DATE ON THAT WOULD BE YOU HELP ME OUT THERE, MICHELLE
  • I THINK THAT'S GOING TO BE JANUARY 11
  • IT WOULD NORMALLY WE'RE LOOKING TO ACTUALLY CHANGE THAT MEETING DATE TO THE FIRST WEEK, SO THAT'S STILL IN THE WORKS
  • SO I WOULD PROPOSE JANUARY 4 FOR YOUR MOTION TO RESPOND TO A TIME CERTAIN AT THIS POINT
  • ALL RIGHT
  • SO TIME CERTAIN WOULD BE JANUARY 4
  • THANK YOU
  • MOTION
  • AND THEN, MR COMMISSION PRESIDENT, WE CAN RUN THROUGH THE ROLE
  • WE HAVE A MOTION TO POSTPONE TO A TIME CERTAIN OF JANUARY 4 ON THE FLOOR
  • THE MOTION IS DEBATABLE ONLY TO THE TIME CERTAIN OF POSTPONEMENT
  • I'M SORRY
  • IT'S AMENDABLE TO THE TIME CERTAIN OF POSTPONEMENT, AND THAT IS THE EXTENT OF IT
  • SO DO YOU WANT ME TO GO AHEAD AND RUN THROUGH THE ROLE ON THE MOTION TO POSTPONE TO A TIME CERTAIN, PLEASE
  • THANK YOU
  • BEGINNING WITH COMMISSIONER STEINBRUECK
  • NO COMMENTS
  • THANK YOU
  • THIS IS FOR THE VOTE ON THE MOTION TO POSTPONE TO A TIME CERTAIN IT IS DEBATABLE AS WELL
  • OKAY
  • LET'S TAKE QUESTIONS FIRST AND THEN WE'LL GO THROUGH A VOTE
  • LET'S DO IT THAT WAY
  • COMMISSIONER CALKINS, ANY QUESTIONS ON OR COMMENTS ON A MOTION TO THE TIME CERTAIN
  • NO QUESTIONS
  • THANK YOU
  • COMMISSIONER BOWMAN
  • ANYTHING FURTHER ON THE MOTION TO THE PHONE THAT YOU'D LIKE TO SPEAK TO
  • NO
  • AGAIN, I JUST WANT TO SAY I APPRECIATE ALL THE WORK FROM THE STAFF AND IT'S NOT AN INDICTMENT ON THE PROJECT AT ALL
  • I JUST WANTED TO PROVIDE AN OPPORTUNITY FOR THE NEW FOLKS TO WEIGH IN
  • SO I THINK IT'S IMPORTANT
  • THANK YOU
  • THANK YOU, COMMISSIONER FELLEMAN
  • QUESTIONS OR COMMENTS ON THE MOTION TO POSTPONE TO A TIME CERTAIN
  • NO FURTHER QUESTIONS
  • OKAY, THEN LET'S GO TO THE MOTION TO THE VOTE ON THE MOTION TO POSTPONE TO A TIME CERTAIN BEGINNING WITH COMMISSIONER STEINBRUECK
  • COMMISSIONER STEINBRUECK ON THE MOTION TO POSTPONE TO A TIME
  • NO
  • YOU DO NOT WANT TO PROCEED
  • THANK YOU, COMMISSIONER
  • THAT'S A NO FROM YOU, SIR
  • CORRECT? YEAH
  • LET'S PLAY AROUND
  • THANK YOU
  • MAYBE FOLKS CAN MEET THEIR PHONES
  • THANKS
  • I'M VOTING ON MY MOTION
  • THANK YOU
  • THANK YOU
  • COMMISSIONERS FELLEMAN, ON THE MOTION OF THE PHONE TO A TIME CERTAIN
  • THE MOTION OF THE PHONE TO A TIME CERTAIN FAILED
  • AND NOW WE ARE BACK TO THE MOTION TO APPROVE ITEM NINE
  • B
  • WOULD YOU LIKE ME TO RUN THROUGH THE ROLE, PLEASE? THANK YOU ON THE MOTION TO APPROVE ITEM 9D
  • AND THEN
  • THANK YOU, COMMISSIONER FELLEMAN
  • ALL RIGHT
  • THANK YOU
  • AND THAT MOTION PASSES WITH A FOUR YESS AND ZERO NOS
  • VERY GOOD MOTION THEN PASSES
  • SO I BELIEVE THAT BRINGS US TO THE END OF THIS MEETING
  • IF THAT WAS THE FIRST TWO THAT WAS SUPPOSED TO BE DISCUSSED
  • SO I THINK WE'RE NOW AT THE POINT OF ANY FINAL COMMENTS BY EXECUTIVE METRUCK
  • AND THEN WE'LL GO AROUND TO THE COMMISSIONERS
  • NO
  • THANK YOU, COMMISSIONERS
  • WE HAD A VERY PRESENTATION AND ITEMS THAT WE WENT THROUGH
  • THANKS FOR YOUR ATTENTION AND YOUR THOUGHTFUL FEEDBACK ON ALL THESE IMPORTANT ISSUES
  • THANK YOU
  • THANK YOU
  • AND THEN, MR COMMISSION PRESIDENT, I CAN RUN THROUGH THE ROLE FOR FINAL CLOSING COMMENTS
  • THANK YOU
  • THANK YOU
  • BEGINNING WITH COMMISSIONER STEINBRUECK
  • NO CLOSING COMMENTS
  • THANK YOU
  • THANK YOU, COMMISSIONER CHO
  • NONE FOR ME
  • THANK YOU
  • THANK YOU, COMMISSIONER CALKINS
  • NONE FOR ME EITHER
  • THANK YOU, COMMISSIONER BOWMAN
  • NO COMMENTS
  • THANK YOU
  • THANK YOU, COMMISSIONER FELLEMAN
  • I JUST ASK EVERYBODY TO GET HOME SAFELY
  • THERE'S QUITE A STORM OF BLOWING THROUGH HERE
  • ONE SQUALL AFTER THE NEXT
  • HAVING SAID THAT I WOULD LIKE TO DECLARE THIS COMMISSION MEETING CLOSED ON NOVEMBER 9
  • THE TIME NOW WE'RE 328
  • VERY GOOD
  • WE ARE RETURNED
  • THANK YOU, COMMISSIONERS
  • THANKS.

Limitations of Translatable Documents

PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.