6b. Presentation
Item No. 6b_supp Meeting Date: February 28, 2017 South Satellite Renovation Project Authorization Request to Initiate Programming & Develop Design Alternatives 1 South Satellite in 1971 and 2016 2 Current State Built in 1970 and expanded in 1984 User experience is inefficient and congested Infrastructure has reached the end of useful life Federal Inspection Services and related space will be vacated when IAF opens. SSAT is due for a major renovation and reprogramming 3 SSAT Renovation Project History 2015 Commission commitment to airlines Plan of Finance 2016 Early studies to identify facility deficiencies Long Range Plan Planning has been underway to develop the SSAT Renovation Project 4 Interim Investments SSAT Interior Renovations (C800549) Structural Improvements (C800818) HVAC Replacement/Upgrade (C800798) Interim investments have been and continue to be made to maintain operations in the facility until a major renovation 5 Getting to Preferred Concept Gather/Validate Data Gather Detailed Requirements Develop Concepts Analyze Design Concepts Return to Commission to Review Results and Recommend Preferred Design Concept This authorization is to explore alternative renovation concepts to solidify the project definition 6 Project Timeline Project Definition Design Construction Closeout NOV 2016 September 2018 September 2018 April 2020 DEC 2016 START 2020 - Duration TBD TBD Return to Commission with IAF Beneficial Occupancy IAF Completion NSAT Completion Recommended Alternative Q4, 2017 Staff will return with a preferred alternative for design authorization 7
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.