Fishermen's Terminal Long-Term Strategic Plan
Final Report: Port of Seattle Fishermen's Terminal Planning Services - Contract no. P-00318449
April 28, 2016


Acknowledgments                         Table of Contents
Fishermen's Terminal Strategic         Port of Seattle                    1.0 Introduction
Objectives Steering Committee                                    2.0   Existing Conditions
Stephanie Jones Stebbins
3.0   Stakeholder Perspectives
Davie Harsila                           Joseph Gellings
Kenneth Lyles                           4.0   Planning Concepts
Pete Knudson
Warren Aakervik                      Mick Shultz                          5.0   Next Steps
Leif Pederson                           Megan Deinas
Roque Deherrera                       Marie Kurose
Pete Mills                                 Rebecca Schwan
Don Meberg                       Jefferey Utterback
John Burreson
Sue Rooney                          Consultants
Matt Gasparich
John Lockwood                        VIA Architecture
Kris Mullen                               Enviroissues
Peter Steinbrueck
Kurt Hansen

1 INTRODUCTION
INTRODUCTION             Goals of the Fishermen's Terminal Long-Term
Commercial fishing activity at Fishermen's Terminal    Strategic Plan:
(FT) generates $450 million in business revenue       Continue to grow the economic value of the fishing
annually and nearly $40 million in state and local      and maritime cluster including the number of local
taxes. As part of the Century Agenda, the Port has      jobs and business revenue.
established the goal of doubling the size of the
commercial fishing business cluster that is anchored     Improve overall financial returns to allow us to
by Fishermen's Terminal.                       fulfill the Port's commitment to the industry and
taxpayers.
To achieve this goal, the Port will develop a         Prioritize uses that support the commercial fishing
Fishermen's Terminal Long-Term Strategic Plan to       industry, with a focus on anchoring the North
prepare the uplands portion of Fishermen's Terminal    Pacific Fishing fleet.
for growth. Considerable investments have already
been made to modernize the moorage structures of     Prioritize development that maximizes utilization    Fishermen's Terminal Community 2016
Fishermen's Terminal  approximately $30 million in     of facility assets.
the last 10 years. These water-side improvements set    Recognize and enhance Fishermen's Terminal as a      6,419 Local jobs
the stage for a planning process covering the 26-      living community landmark.                     $449 million in business revenue
acre uplands area of the property. This document
provides recommendations for planning concepts and  This document helps to lay the groundwork for high       26+ acres of dry land
potential redevelopment strategies for the uplands.   level concepts for the short- (two years) to long-         21 existing buildings
term (ten year). Included in this report are the
690 parking spaces
findings from two stakeholder design workshops
Develop a long-term strategic plan for  with the Fishermen's Terminal Strategic Objectives
Committee. Conversations with the committee
Fishermen's Terminal that leverages   helped staff and the consultant design team to vet
maritime and fishing activities and   ideas, and formulate strategies that will respond
industries.            to the changing needs of both the fishing fleet, and
Seattle's changing industrial lands.


Fishermen's Terminal Planning Services, April 2016 FINAL REPORT 1

FISHERMEN'S TERMINAL BUILDINGS AND SITE MAP
Left: large fishing
vessel moored at
TENANT SPACE        NW DOCK 1 (NORTH)  NW DOCK 2 (NORTH)
Fishermen's Terminal          (SALMON BAY)
NORTHWEST DOCK
OPEN
STORAGE


UTIL.         NW DOCK 1 (SOUTH)  NW DOCK 2 (SOUTH)
21ST AVE W    HAZMAT
M-15

OPEN
STORAGE
Left: The annual
Fishermen's Fall
Festival draws a
crowd.                BIKE PATH       20TH AVE W      DOCK 9    DOCK 8   DOCK 7    DOCK 6     DOCK 5     DOCK 4    DOCK 3    DOCK 1


C-3
DOCK 10                                                             DOCK 2


WASTE          W THURMAN ST.                                    W THURMAN ST.
MANAGEMENT
C-9             TENANT
C-15 (FISHERMEN'S CENTER)    18TH AVE W FORKLIFT RENTAL                       (SEATTLE            SPACE
NET REPAIR YARD               SHIP
SUPPLY)
Left: The same area                                                     N-3       C- 15TH PL W              N-4               I-5
10         16TH AVE W
as above being used
M-4
for its main purpose
W NICKERSON ST
- net repair.                       BIKE PATH
C-15 (DOWNIE BLDG)                                                   PORT
19TH AVE W               C-2 (NORDBY BUILDING)                  I-8     UTILITIES
BIKE PATH
SILKY'S ALLEY         16TH AVE W      N-10
18TH AVE W                            N-11
C-12 (BANK)      N-8   N-7   N-6    N-5   N-9
OPEN STORAGE
W EMERSON PL

2 FINAL REPORT Fishermen's Terminal Planning Services, April 2016

FISHERMEN'S TERMINAL CONTEXT      FT 20-Year Plan Net Shed Improvement Program
Located on Salmon Bay, Fishermen's Terminal has      (2010) After investing $70 million on capital
served as a dock and home port for Seattle's         improvements, the Port conducted an assessment
Detail below
commercial fishing fleet since its dedication in 1914.     on Fishermen's Terminal building assets focused on
More than 100 years later, the North Pacific Fishing     maximizing financial return. The Port conducted
Fleet remains a key component of the commercial      stakeholder outreach to assess and document
fishing industry and the regional economy.           the dynamic needs of the fleet with particular
The Terminal provides freshwater moorage for more    attention to Net Sheds and Net Lockers.
BALLARD-INTERBAY
than 500 fishing vessels and pleasure craft, with                                                                  MANUFACTURING/
Fishermen's Terminal Redevelopment Study of C-12,                        INUSTRIAL CENTER
preference given to commercial fishing boats. In       N-7 and N-8 (Seneca Group, 2014) This report
addition to the maritime industrial and commercial      analyzed the potential for new programs; i.e.
fishing activities that constitute the heart of the         retail and office redevelopment at the gateway
DOWNTOWN
facility's operations, Fishermen's Terminal uplands       uplands sites near the entrance of the facility. The                        SEATTLE
include a mix of related programs such as office,       report focused on a single story approach, and
retail, restaurant, light industrial and warehouse uses.    analyzed the potential to subdivide lots.
The Terminal allows limited public access. It is also
DUAMISH
home to the Fishermen's Memorial, a sculpture        Fishermen's Terminal Real Estate Demand Study and
MANUFACTURING/
paying tribute to local fishermen and women who      Fishing Cluster Economic Growth Model (Madison                         INUSTRIAL CENTER
have been lost at sea, and to Fishermen's Fall         Bay Commercial, 2015). The report provides an
Festival, an annual event that showcases the cultural     overview of real estate conditions of the Terminal
and economic importance of commercial fishing in      property within the Ballard/Interbay, City of
Seattle.                                    Seattle, and regional industrial economic cluster.
A survey conducted as part of this report helped
This study draws on a variety of preceding planning    to narrow desired attributes for future on-site
initiatives:                                        investments.
Fishermen's Terminal Uplands Study (2005,          Building condition assessments and tenant             FISHERMEN'S
TERMINAL
MAKERS). This report examined industrial         improvement estimates for uplands assets,
and maritime operations and recommended       including the C-14 (Downie Building) envelope
FISHERMEN'S
Study prepared December 30, 2015                TERMINAL
improvements to upland facilities as related to
waterside tenants. The study divides the Terminal     The team also reviewed the Washington            N
into a series of character areas, and documents      Maritime Federation 2016 Legislative Priorities
the nature of seasonal work at FT.
Fishermen's Terminal Planning Services, April 2016 FINAL REPORT 3

on Workforce Development, Washington State    1) There is a limited supply of industrial property
Maritime Cluster Economic Impact Study 2013.     in Seattle in general, and Ballard Interbay in
According to the study, maritime logistics and      particular, and space is subject to rising rents and
shipping was the largest job generator in the state  building sale prices. The limited supply of space has
and accounted for 29% of maritime employment.  driven demand and rents for industrial space, and
A close second was boat and shipbuilding repair   the vacancy rate of 0.6% at the end of Q3-2015 is
and maintenance with 28.6% of maritime jobs.    far below both the regional and national average.
The Port is in a position to relieve some of this
A SHIFTING ECONOMIC CONTEXT    pressure while supporting the fleet and the maritime
industrial sector by developing additional industrial
The Fishermen's Terminal Real Estate Demand Study
space in and around Fishermen's Terminal.
and Fishing Cluster Growth Economic Model (2015)
provides the context for future land development.
This action would help to offset local land pressure
The report:
to convert industrial spaces from industrial to higher
Identifies the location and facility configuration     paying uses. These are uses that may generate
drivers for the sector,                       more revenue initially, but do not support the
Recommends key leasing parameters for industrial   family-wage jobs of the maritime and commercial
Fishermen's Terminal circa 1918. Fishermen check and
facilities at Fishermen's Terminal,               fishing industries. This pressure in Ballard Interbay
mend their gill nets. MOHAI Digital Photograph Collection
is due to its locational advantages; i.e. waterfront    #1983.10.2159.1
Provides economic forecasting for the future        location, proximity to transportation and high income
economic impact of Fishermen's Terminal and the   residential areas.                         impact of the fishing cluster over the next ten years,
North Pacific fleet, and                                                            provided the Port acts boldly to protect and increase
Recommends strategies to maintain and grow       2) Fishermen's Terminal and Interbay represent a      land use for industrial purposes. One of these is
Seattle's maritime industrial cluster.             remarkable cluster unparalleled by rival Pacific      maintaining, and intensifying land for industrial and/
This study relied on a survey of North Pacific fleet    Northwest ports for the depth of its supplier and     or employment uses.
vessel owners and operators, leaders of maritime    trades network. Many of the vendors and suppliers
industrial businesses that support the fleet, as well as  expressed a strong desire to locate on or at the      Although there is some risk related to how the fishing
economic and real estate statistical data collected    terminal site, with direct access to not only to vessel   fleet will recapitalize in the future, Madison Bay
from public and private sources. Of primary        owners, but also other businesses in the cluster.      recommends focusing on expanding the number of
importance to future space planning of the sites are                                        fishing boats home-porting in Seattle through supply
the following findings:                        The Conceptual Growth Model indicates that the     and maintenance as a primary strategy. Distribution
Port will meet its goal of doubling the economic      processing of seafood plays a secondary role.

4 FINAL REPORT Fishermen's Terminal Planning Services, April 2016

2 EXISTING CONDITIONS
The following section summaries the key regulatory,
access and land use conditions at the site.
ZONING CONSTRAINTS                    A 40,000 SF allowance for
non-maritime use remains in
The regulatory constraints on the site are complex,
this area
with two bodies of code that apply. As shown at
right, FT is divided into two base zones: Industrial
General 1 (IG1) and Industrial General 2 (IG2).
A portion of the IG1 zone also falls within the
jurisdiction of the State's Shoreline Management Act.
The uplands is divided
into three areas based on
The Shoreline Management Program's Urban                        the interaction of zoning
Maritime zone (SMP-UM) applies within 200' of                              regulations.
the shoreline and requires that 80% of uses in
the SMP-UM area be water dependent. The SMP
also requires a setback for structures, and hight
TABLE 1 LAND USE REGULATIONS
limitations of 35'. With this restriction in place, an
estimated 40,000 SF of non-water dependent use     ZONE      ALLOWED USES        CONDITIONAL USES         DESIGN STANDARDS
allowance remains (however these uses must also
IG-1+    Industrial (unrestricted)                        2.5 FAR
meet the use restrictions of the Industrial General 1
SMP-UM  Marine-dependent uses   WD/WR office         1.0 FAR non-industrial
(IG 1) zone.                                      (80% of site)           Durable/general sales + service  Max height limit only buildings which
(10,000sf)                contain non-industrial uses (45')
Both IG1 and IG2 allow for unlimited industrial use                              Drinking establishments (3,000sf)
IG-1     Industrial                                  Max lot coverage 75%
and restrict non-industrial use. IG-2 is moderately                                Food (5,000sf)
Accessory office
less restrictive on non-industrial uses, while IG1                Manufacturing                                  IG-1 + SMP-UM only:
restricts the size of specific non industrial uses. as      IG-2      Warehouse             Durable/General Sales +      Shoreline setback 15' for WD, 35' for
shown in Table 1.                                  Storage              Service (25,000sf)          NWD, 50' for parking
Food processing         Office (25,000sf)
Because zoning restrictions for non-industrial areas            Laboratories            Drinking establishments (3,000sf)  IG-2 only:
are defined in terms of square footage per parcel           Heavy sales + service     Food (5,000sf)            Street trees required along Emerson
Lodging to serve industrial users  Street (IG-2 only)
rather than percentage of parcel area, potential lot
subdivisions allow for additional capacity in non-
Fishermen's Terminal Planning Services, April 2016 FINAL REPORT 5

industrial uses even under the existing zoning regime.  use regulation devised in partnership with the       degree of certainty about future development plans,
As such, it would be possible to 'reset' the allowable   City of Seattle may be warranted. The path to a     and for phased development in commercial and
capacity for different areas of the site by dividing   comprehensive land use strategy could better reflect  industrial zones. The first phase of the development
the parcel, for example, the gateway bank building   the holistic vision of the Terminal, and the significance  must also be large scale - 100,000 SF in gross
location. This option was explored by the Seneca     to the local Fishing and Maritime cluster.          building area.
Group in their 2014 study of the gateway site.
Options include:                           B. Development Agreements
Zoning has acted as a barrier to change. Due to                                         RCW Chapter 36.70B enables a tool to create more
use footprint and size restrictions, several uses       A. Major Phased Development                 flexible arrangements of entitlements as part of a
are non-compliant, they are now allowed under     Seattle's Land Use Code allows Major Phased      comprehensive package. As a voluntary contract
grandfathered rights wherein they exceed the      Developments in Commercial (23.47A.007) and     between the Port and the City, a development
current size allowance in the zoning code. For       Industrial (23.50.015) zoned areas. Since the       agreement could allow more flexibility than the
example, discussions regarding redevelopment of    adoption of the Major Phased Development        existing regime, while also narrowing the Port's
the Downie Building site must also take into account   provisions in the Land Use Code over fifteen years    policy focus on creating an active employment
that restrictions put in place after the construction of   ago, only two projects have used the process. One    focused, publicly accessible property.
this building prevent any new/replacement office    such project was for Immunex, later purchased by
space being built unless 69,000 SF is first removed.   Amgen, in the Interbay area near Terminals 90 and   The most visible recent use of DA's has been at
91, and the other was the Gates Foundation campus  Sound Transit's light rail stations. This allows for both
However, with the adoption of a clear long term     on lower Queen Anne.                      density as well as the application of specific-transit
vision in a long term strategic plan, and potential                                           oriented design guidelines.
redevelopment plan, alternative methods for land    This tool is used when property owners have a high

TABLE 2 REMAINING LAND USE CAPACITY BY PROGRAM
Office       Bars  Restaurants       Retail  Lodging**  Manufacturing*  Warehouse*  Storage*  Food Processing*  Laboratories*
Existing           94000       2640       15000          9700          0             n/a          n/a        n/a              n/a           n/a
IG2 remaining    -69000      360     -10000       15300     10000        unlimited     unlimited   unlimited         unlimited       unlimited
IG1 remaining    -84000      360     -10000         300     10000        unlimited     unlimited   unlimited         unlimited       unlimited
IG1+SMP-UM     WR   WR 360    -10000  300 material/  not allowed    repair services  material/fuel     WR         WR       WR
remaining       -84000                     fuel supplier or                            suppliers
hardware store
*office components are allowed as an accessory use / **lodging must serve users in industrial area and minimize conflicts with industrial uses / WR = Water Related

6 FINAL REPORT Fishermen's Terminal Planning Services, April 2016

MANAGED COMPATIBILITY AT THE BROOKLYN NAVY YARD CASE STUDY
One of the country's most successful projects for
new industry incubation is the 300-acre Brooklyn
Navy Yard. Shuttered in 1966, the Yard once
employed 70,000. An ownership transfer in the
1990's to the City and a nonprofit, the Brooklyn
Navy Yard Development Corp. (BNYDC), led to the
current land use strategy for affordable industrial
space and tenant diversification.
Today, the site's 40 buildings have been at near
or full occupancy for almost a decade. Average
leasable space at the Yards is 6,000 SF. The
Yard houses 330 businesses and 7,000 jobs, a      "Under the Brooklyn Navy Yard Development         BNYDC BLDG 92 (2011) $25 million
number expected to climb to 12,000 in the next     Corporation's leadership, the Navy Yard has been       LEED Certified exhibition, visitor, and job placement
five years. According to the Municipal Arts Society    transformed from the nation's largest shipbuilding facility   center. Thi building supports employment services tp
to a national model for sustainable industrial parks" EPA   directly connect job seekers with businesses in the yards.
of New York, one of the reasons companies have
Regional Administrator Judith Enk                   With a focus on sustainability, BDNYC has been successful
chosen the yard is "zoning certainty. There is no
at attracting many green manufactures to its site.
chance that the Navy Yard is turning into housing."
The BNYDC Executive Director describes the
redevelopment mission in no small terms as the
re-creation of the "pipeline" to the middle class.
For its tenants, the BDNYC provides advanced
infrastructure (including access to renewable
energy), on-site workforce training, employment
recruiting, and reduced rents.
In 2009, BNYDC financed the nation's first multi-                                                            BLDG 77 
story, multi-tenanted green industrial building.                                                                70,000 SF floorplate with 428
As of 2016, with no vacancies and a long wait list,                                                          desks, 5-meeting rooms and
the City is working to redevelop Building 77, a                                                            18-meeting spaces. The project
1940's industrial building from "passive storage"                                                          represents 1/4 of the total
to 1million SF / 3,000 jobs mixed employment                                                         Navy Yard capacity
building.                                                                                          (www.brownstoner.com)

Fishermen's Terminal Planning Services, April 2016 FINAL REPORT 7

PROGRAM CHARACTERISTICS
ON SITE USES AND PROGRAM
Ballard/Interbay is the more urban of Seattle's two
Manufacturing and Industrial Centers. At the 26-acre                                                      Covered Storage and Net Sheds
site, uses span light manufacturing, maritime, food
Open Storage
processing and support facilities for vessels, open/
covered storage, net sheds, mixed office space, retail                                                        Industrial Operations
and various support services.
Open Industrial work area
The most land-intensive uses on the site are parking                                                         Vacant
and open gear storage, followed by industrial/
operations and a mix of office spaces. Fishermen's                                                        Parking
Center anchors the site with retail and other public
Mixed office
amenities and attractions at the waterfront.
Workforce Development
Industrial uses are primarily located in the northern
and eastern portions of the site, with the most intense                                                         Active Public Use
industrial activity along the waterfront adjacent to
the docks, where cranes and work yards are located.
public waterfront access
Heavier industrial areas transition into both open
and closed storage.

TABLE 3 MARITIME USES
Fishermen's
Program Area    Total    Percent of Total              Center
SF      Capacity
Fishing Related   50,615   34%
Maritime Related  37,291   25%
Vacant        7,429    5%


8 FINAL REPORT Fishermen's Terminal Planning Services, April 2016

ACCESS AND CIRCULATION
ACCESS AND CIRCULATION
The primary roads serving the site are West Emerson
Place and 21st Avenue West. West Emerson Place                                                           Local Access Only
is a principal arterial and 21st Avenue West is a
Primary Circulation
collector. There are three vehicular access points
to the site. The primary public entrance is at the                                                                     Bike Path
southeast, with two additional access points at the
northwest and south.                                          21ST AVE W     20th AVE W                                    Public ROW
Parking
These access points connect to a central spine (20th
Ave/Nickerson Street) which provides circulation                                                                 Possible conflict
area
through the site as well as access to all of the major
parking areas. Small access streets and alleys
working waterfront access
connect to this spine and provide access to the
waterfront, docks, storage areas, and industrial
facilities.
public waterfront access
Conflicts include:
Interrupted waterfront access for industrial
movement (removable bollards designate a
stretch of the waterfront as pedestrian-only to
provide public access to the memorial),
Conflicts between public and industrial users
moving west to east across the site,                                                            W. Nickerson St
Incomplete, illegible, and fragmented bike path.
Silky's Alley
primary
public entry
West Emerson Place

Fishermen's Terminal Planning Services, April 2016 FINAL REPORT 9

EXISTING PARKING SUPPLY                                              EXISTING PARKING
Spaces allocated
The 690 unpaid parking spaces at Fishermen's                                                            by User Group
Terminal serve fishers, office workers, industrial users,
and the general public. Parking at the site is formally
controlled by time restriction. The time limit system,                                                                     Employment
however, has less bearing on where people park
Public
than general location of the lots.
Reserved
The public parks in the short-term lot adjacent to the
Fishermen's Center, as well as the large lot to the
south, between the site entrance and the Center.
Employees tend to park in smaller lots scattered
throughout the site, and closer to their work areas.Supply
Provided Spaces                  690      641      603      824

Demand - Standard Buildout
Required Spaces                  470      529      563      619
Demand Calculation (Program Square Footage - Standard Buildout)
PARKING SPACES BYExisting  2 Years  5 Years  10+ Years
Industrial                     200000    218000    286000    371000
Office   USER GROUP      77000     97000     97000     97000
Retail                        28000     33000     33000     38000
Lodging                                                10000
Workforce Development           17000     22000     22000     22000
Demand Calculation (Parking Spaces By Program - Standard Buildout)
19
Public Lot
Existing    2 Years    5 Years    10+ Years
Industrial                       100       109       143       186
Office                          77  TOTAL97       97       97
Retail                 496   56       66       66       76
Lodging                         0        0        1750        4
Workforce Development             68  69088       88       88

Demand - Maximum Buildout
Required Spaces                  638      769      836     1,026
Demand Calculation (Program Square Footage - Maximum Buildout)
Existing    2 Years    5 Years    10+ Years
Industrial                    200,000    238,500    299,000    439,000
Office                       77,000     95,000    113,000    129,000
Retail                        28,000     29,000     38,000     88,400
Lodging                                                10,000
Workforce Development           17,000    40,000    40,000    40,000
10 FINAL REPORT Fishermen's Terminal Planning Services, April 2016
Demand Calculation (Parking Spaces By Program - Maximum Buildout)
Existing    2 Years    5 Years    10+ Years
Industrial                       100       119       150       220
Office                          77       95       113       129
Retail                          56       58       76       177
Lodging                         0        0        0        4
Workforce Development             68      160      160      160

OPPORTUNITY SITE IDENTIFICATION                                          OPPORTUNITY SITES
Port staff building condition assessments and
investigation of current site conditions led to the                                                                           Obvious
identification of potential opportunity sites. The                                                                           Intriguing
following pages summarize findings on site and
building condition. Opportunity sites were also                                                                        Limited
reviewed with the Fishermen's Terminal Strategic
Building
Objectives Committee.
Open Area
Sites are categorized according to the following:
5
Obvious Opportunity: Currently not used
optimally or facing significant challenges that
warrant rethinking.
Intriguing: Sites not being utilized optimally, or
building condition in question.
Limited Opportunity: Limited redevelopment,
however sites may provide complementary
solutions made on obvious or intriguing
opportunity sites.
1
4
OR
3

2    4


Fishermen's Terminal Planning Services, April 2016 FINAL REPORT 11

OPPORTUNITY SITE ANALYSIS
The most obvious sites are the two unoccupied
buildings - the Seattle Ship Supply building and the
Bank Building - as well as the Downie building which
is currently in poor condition.

1                2
The Seattle Ship Supply building (C-9) is unoccupied  The bank building (C-12) is unoccupied on a 30,000
and not leasable without significant upgrades.       square foot site. It is single purpose built, yet there
is a lack of interest in the site from the banking
The building is in poor condition, its piles are
community.
failing, and it is not up to seismic code.
The building is in poor condition with water and
With many interior columns, it is an inflexible
mold damage.
space located in an already restrictive Shoreline
Management Zone.                     Highly visible near the entrance of the facility.
The building footprint is 10,000 square feet, and     This easy access reduces impact to the industrial
it is located on the waterfront adjacent to FT's       areas of FT and would make an ideal location for
widest dock, making it a highly desirable site.       a public or workforce development oriented use.




12 FINAL REPORT Fishermen's Terminal Planning Services, April 2016

3                4                 5
The physical condition of the Downie building (C-14)  The use of net sheds is critical for fishing customers,    The west wall is currently used primarily for open
is under review. Downie is 95% occupied with a set   however, up to two net shed buildings could be      storage.
of tenants valuable to FT's mission. Some building    removed and replaced with other uses with little
systems may need extensive renewal. This is currently  impact to fleets. Port Staff log and track the use of
There is a fairly even mix of short-term storage of
being assessed by Port Engineering.             Net Storage lockers by fishers.
seasonal items and long-term storage, with some
An early estimated cost of repairs is $3.1 million.     Only up to one pair could be removed.               items inoperative for up to 20 years.
This is comparable to the cost of removing and
Each location is about 32,000 SF in area.            The site has the best access to vessels in the
constructing a new building.
terminal, as they can dock broadside to the
Pairs 3 & 4 or 7 & 8 would combine well with
Like the bank building, it is located near the                                                          waterfront.
other opportunity sites.
entrance and away from the indsutrial areas of
It also has loading cranes and access to 21st Ave.
the Terminal.                             Waterfront-adjacent net sheds are rented by
Some portion of the 82,000 SF area could be re-
the most fishing customers, with the best access to
It occupies a 10,000 SF footprint.                                                                  purposed to better suit these opportunities.
boats. These net sheds would be unlikely to be
removed unless a better or more complementary     240 feet along the south end of the west wall is
solution was found.                         also allowed for direct sales of fish from boats.


Fishermen's Terminal Planning Services, April 2016 FINAL REPORT 13

3 STAKEHOLDER PERSPECTIVES
Two design workshops with the Fishermen's Terminal   capacity analysis under the existing land use regime.
Strategic Objectives Steering Committee were held   This was followed by further discussion regarding
on 1/28/2016 and 2/11/2016. The Strategic     architectural concepts for prototypical employment
Objectives Steering Committee was notified by email  buildings, workforce development opportunities,
one month in advance with materials describing their  partnership opportunities, and long term success for
overall intent. One week before each workshop     the Terminal. Stakeholders were asked to identify
members were sent a reminder, an agenda, and     outcomes of a successfully implemented plan.
RSVP request. Six stakeholders were present at the
first workshop and ten stakeholders present at the    WHAT WE HEARD
second workshop.                       Some of the key ideas from discussions with the
Strategic Objectives Steering Committee are
Design Workshop 1 Summary                 compiled following common themes.
The first workshop presented project background
information, mission and objectives for the Long Term  Reactions to Fishing Cluster Economic Model
Strategic Plan. This included the Real Estate Demand
Study and Fishing Cluster Growth Economic Model,     Maintain industrial character
site analysis of program and operations, proposed     Segregate and balance access for public and
opportunity sites and precedents.                 industrial users, prioritizing water access and        long-term storage areas can be optimized
ground-floor facilities for industrial users
The consultant team presented preliminary ideas for                                         Support for an alternate parking system using
a robust, flexible building type.                   Ensure long term affordability for moorage         stickers to distinguish between users and visitors
tenants
Ensure thoughtful construction phasing in industrial
While concerns about displacement and loss of
industrial space were discussed, stakeholders were   Work Area Improvements                     areas
generally positive on proposed redevelopment       Vertical development and intensification is         Prefer no net loss of net shed storage space; vital
opportunities, vertical intensification, and the          acceptable                                to fishers
addition of employer-based uses, with public access
Suggest policy to ensure compatible tenants; no
areas designed to enhance public experience                                          Enhanced Public Experience
incremental loss of work areas, or function due
without interfering with commercial fishing activities.
to businesses who object to sound or messy work     Gateway development at site entrance could
Design Workshop 2 Summary                  areas                              be creatively designed to increase visibility, and
The second workshop presented a preliminary vision                                        engage the public, can try temporary or early
Storage does not need to be on ground floor,
synthesized from the previous discussion, including a                                           wins with public uses that cost little to implement
14 FINAL REPORT Fishermen's Terminal Planning Services, April 2016

INDUSTRIAL HEAT MAP
Mapping the areas of most intensive industrial activities
Heavy industrial         No industrial use
use
such as repair and
manufacturing
Support for re-branding and improved signage                                                          Moderate industrial
to enhance public and political awareness and                                             use
support of industry                                                                 such as loading and
unloading
Support from office tenants for additional
amenities to attract and retain employees
Find ways to share the story of the facility with                                                           Light industrial use
more users, build new stewards for the site and its                                             such as storage
environment
Support for mariners' hostel
Workforce Development                                                           DESIGN CONCEPT FOR DISCUSSION
Apply strategies to recruit younger people to the                                                                  Program and character area discussions in
industry and support for workforce development           MIXED EMPLOYMENT                              design workshop 2
space                                  AND PUBLIC VIEWS
Support for larger dedicated or multi-purpose
meeting space, i.e Nordby conference space is
inadequate - accommodating 100 persons would
be preferred
Workforce development could take the role of
partnerships with training centers using shared
office space                                                     INDUSTRIAL USERS +
ACCESS TO MARINE
The workshop also included a discussion of valueadded
products at FT, however, this discussion
was tabled until all necessary stakeholders could
participate
PUBLIC
INTERFACE
PARK          IMPROVED WATER ACCESS
GATEWAY             ONCE        FOR INDUSTRIAL USERS
ENTRY
PUBLIC PARKING IMPROVEMENTS

Fishermen's Terminal Planning Services, April 2016 FINAL REPORT 15

4 PLANNING CONCEPTS
The following ideas incrementally intensify land utilization, boost capacity and help the Terminal thrive as it adapts to shifting external conditions. In recent years,
the power of planning for employment clusters has become increasingly recognized. The Port, as a major land owner has the potential to build on its assets, avoid
economic displacement, and encourage the co-location of intellectual capital embodied in maritime related industrial businesses. Fishermen's Terminal can also be
designed to include targed public access, while further investing in its working waterfront.

1 ANCHOR THE INTERBAY INDUSTRIAL CLUSTER:  of existing work areas, for example, the Net Repair  purpose spaces, are policy decisions that promote
WORK AREA EXPANSIONS & IMPROVEMENTS    Yards.                        Fishermen's Terminal as a hub connecting the
maritime industry cluster.
Increasing the Port's contribution to sufficient amounts  2 ENHANCE PUBLIC EXPERIENCE
of well-designed, accessible industrial space will                                            A strong plan for workforce development at FT
help ensure that the maritime industry can continue    It is possible to enliven the public experience of      addresses complementary Port of Seattle, City of
to locate in Ballard/Interbay over the long-term.     Fishermen's Terminal without negatively impacting    Seattle, and regional goals, including sustaining the
With a short-term focus on adding to supply, the Port  industrial activity. This study recommends          long-term vitality of the Ballard/Interbay maritime
will directly respond to low vacancy and a growing   approaches for targeted, and/or time-based       industrial cluster, leveraging existing investments,
number of industrial land conversions.             improvements in the short-term, leading up to a      aligning existing resources, and strengthening culture.
long-term, inclusive program of wayfinding, signage,
This study elevates two near-term redevelopments: a  and place-based site interventions.             With existing tenants in workforce development, and
portion of the site at the west wall, and the former                                          broad interest from stakeholders, moving ahead on
Bank of America Site (C-12).                  Provided the Port negotiates a more comprehensive   workforce development is an early win.
land use entitlement regime, Fishermen's Terminal,
Identified mid-term sites (5-years) include additional  with increased intensity of employment, as well as    4 MANAGE PARKING RESOURCES
development in the west wall open storage area,     public activity, may find complementary potential for
and the Seattle Ship Supply site (C-9). In the long-    restaurants and/or related goods and services to    Any increase in land use capacity to the site will
term (10-years), provided the Port develops a more   improve on-site amenities in gateway locations, or on  require a more refined parking strategy. This study
efficient parking management strategy, additional    upper stories of buildings.                   summarized future demand, and tested an option for
development pads could become available as future                                    both on-site and off-site car storage.
building sites, intensifying the working waterfront.     3 EXPAND THE ROLE OF WORKFORCE
DEVELOPMENT                    In the long-term, a 4-story garage can be
In addition to new development, the Port also                                            developed for mixed employment and public users,
continues to work with stakeholders to understand    Concomitant to the spatial strategy of overall       while ensuring no net loss of parking.
and prioritize how to optimize the competitiveness    intensification, and building a series of robust multi-

16 FINAL REPORT  Fishermen's Terminal Planning Services, April 2016

FISHERMEN'S TERMINAL        EXISTING PROGRAM AREAS
LONG TERM GROWTH
AND PROGRAMS AREAS




FUTURE PROGRAM AREA / GROWTH









Fishermen's Terminal Planning Services, April 2016 FINAL REPORT 17

EXISTING            2 YEARS            5 YEARS            10+ YEARS

28               33                33                38
200      218      286      371
77           97            97            97
17               22                22                22

FISHERMEN'S TERMINAL PLAN IMPLEMENTATION - POTENTIAL PROGRAM GROWTH (1000's of SF)
POTENTIAL FOR CAPACITY AND GROWTH AT FISHERMEN'S TERMINAL
(1,000 SF)
INDUSTRIAL MIXED    Industrial - Mixed

OFFICE    Mixed Office

PUBLIC SERVICES    Public Services (Restaurant, Retail etc)
(RESTAURANT, RETAIL)  PROGRAM AREAS
WORKFORCE DEVELOPMENT   Workforce Development

EXISTING            2 YEARS            5 YEARS            10+ YEARS

28               33                33                38
200      218      286      371
77           97            97            97
17               22                22                22

FISHERMEN'S TERMINAL PLAN IMPLEMENTATION - POTENTIAL PROGRAM GROWTH (1000's of SF)
18 FINAL REPORT  Fishermen's Terminal Planning Services, April 2016
INDUSTRIAL MIXED

OFFICE

PUBLIC SERVICES
(RESTAURANT, RETAIL)
WORKFORCE DEVELOPMENT

CONCEPT 1: ANCHOR THE INTERBAY INDUSTRIAL CLUSTER
TABLE 4: BUILDING ATTRIBUTES FOR WORKSPACE
Fishermen's Terminal is a core element of                             2015 VENDOR AND SUPPLIER      APPLICABILITY TO REDEVELOPMENT
the northern portion of the Ballard/Interbay                                  SURVEY                      SCHEME
Manufacturing Industrial Center. As upland buildings      PROPERTY LOCATION
are renovated and eventually replaced, key           FISHERMEN'S    81% (vendors) 73% (suppliers)     Support the cluster, increase utilization as
opportunities include:                             TERMINAL       critical to be near to Fishermen's     feasible by introducing vertical development.
Terminal                     Program buildings for services that will attract
Ensure long-term stability of industrial lands and                                                         additional vessels to home port at FT.
maintain, as feasible, industrial uses at the ground
WATERFRONT   35% (suppliers) require direct     Locations can be less strongly driven by direct
level.                                          ACCESS         waterfront access for their business    water access, than need for co-location with
Craft policy to guide development, and consider                                                        other related businesses. Maintain industrial/
proactive approaches to attract synergistic users                                             maritime character adjacent to waterfront.
to the site.                                       FEATURES
SIZE OF SPACE   Combined warehouse/shop space    Create simple buildings that can be easily
Accrue compatible uses that increase local                               5,000 SF (median) Office 1,350 SF    subdivided
visibility and support additional industrial-                         (median) preferred
maritime businesses.
CEILING HEIGHT  Split Preferences; 40% of survey    Provision of ceiling heights will be appropriate
BUILDING MARITIME INDUSTRIAL WORKSPACE              respondents seek heights at/ or    to preferred program; schemes test 14' ceilings,
This study crafted a set of preliminary building                       greater than 16'               up to 24' ceilings with interior mezzanines.
prototypes that a) preserve the ground plane for the
LOADING AND  Split Preferences; 44% of survey    Note that a discussion with staff resolved that
industrial user and b) respond to attributes discussed
ACCESS      respondents seek grade level      loading docks are not a prime requirement for
in the 2015 Vendor and Supplier Survey (see Table                   loading; however, more than 50% of  site. Schemes do not propose loading docks.
4).                                                            respondents place no importance on
this.
Prototypes were discussed with stakeholders as well       TRUCK TURNING  Split Preferences: 47% of         Schemes do not place significant importance
as internal Port Staff. Schemes tested for preliminary                   respondents place no importance on   on maneuvering large trucks. Schemes maintain
costing included single, dual and multi-story                          accommodating large trucks.       existing circulation characteristics.
configurations. The relative advantages of more
intensive, vertical development were accepted by        OVERALL       Among vendors, spaces preferred    Schemes maintain work areas, potential shop
stakeholders, provided the Port also adopts related       CHARACTERISTIC  are office space (85%), shop space   spaces at ground plane. One scheme includes a
(66%), secure yard space (45%)     secure yard work area. Preserve ground plane
policies to ensure compatibility, and makes clear, its
for flexible uses, at dock level or entry on 21st
long-term commitment to grow its employment base.                                          Ave W
It was also found that while desirable, mixing uses        Source: Fishermen's Terminal Real Estate Demand Study and Fishing Cluster Economic Growth Model
vertically in one building is complicated due to          Madison Bay Commercial (12-15-2015)
Fishermen's Terminal Planning Services, April 2016 FINAL REPORT 19

differing codes and requirements for fire, life safety
and treatment of hazardous materials. Additionally,
mixed use (i.e. adding other uses in addition to        Sample building layout with functioning, industrial ground floors
industrial to a building) requires a zoning variance if
buildings involve non-industrial uses over 45'.
In general, future designs for robust, industrialsupportive
buildings should include the following
attributes:
Long interior spans and limited columns to
minimize piling (costs),
Load bearing floors to support industrial users,
Designs compatible with Fishermen's Terminal
architecture; for example galvanized metal
siding, or shed roofs.

FOR FURTHER RESOLUTION
Continue to craft on-going policy to ensure
industrial/maritime tenants that Port has made a
long-term commitment to its employment base and
will continue to reduce risk.                     stories. In addition to restrictions on land use         operators would be willing to pay for the use of
While IG1 and IG2 zoning has no height             sizes, exploring a more comprehensive land use       these services.
limitations on buildings that contain all industrial      strategy may better benefit the long-term vision
uses, there are 45' height limits on those with        for FT.
mixed or accessory uses. This limitation reduces     Reconcile space planning for specific programs.
opportunities for vertical intensification that         Note that while the survey showed high priority
would otherwise support FT growth, especially      for machine shop, welding, metal fabrication, staff
for revenue generating uses on second or third      surveys found that only small number of vessel

20 FINAL REPORT  Fishermen's Terminal Planning Services, April 2016

EARLY WIN: THE WEST WALL            2-STORY FLEX INDUSTRIAL
This 82,000 SF area is currently a mix of shortand
long-term storage (greater than 20-years in
some cases). The area is also used for short-term
moorage, dock side repair as well as product offloading.
While open storage is in high demand by
fishers, stakeholders agreed that long-term storage
could be re-located elsewhere. This has been in
discussion at the Port for some time. A 2005 study
noted that 15% of the west wall stores rarely used
equipment that could be consolidated, or relocated
to new locations such as under the Emerson Street
Bridge.
A multi-story West Wall building proposal was
embraced when discussed at both stakeholder
design workshops. This site also offers flexibility for
staging, and could be developed in phases with
parking provided as needed.                3-STORY INDUSTRIAL WITH ACCESSORY OFFICE
Benefits:
Takes advantage of the grade change and full
access to 21st Ave W.
Soil quality at west wall site may be better here
than elsewhere on site (per staff discussions).
Maintains industrial uses on ground plane.
Multi-level buildings provide opportunities
for flexible space and compatible accessory
programs (office, research, etc.).
Opportunity on upper levels for overlooks and
remarkable waterfront views.

Fishermen's Terminal Planning Services, April 2016 FINAL REPORT 21

CASE STUDY DESIGN ROBUST INDUSTRIAL BUILDINGS
LESS COLUMNS TO MINIMIZE NUMBER
OF PILINGS
LONGER SPANS FOR MORE FLEXIBILITY
25' CLEAR HEIGHT TO ALLOW
MEZZANINE                                              PREFABRICATED AND/OR
MODULAR,
METAL SIDING (E.G. BUTLER
BUILDINGS),
CONCRETE TILT-UP WALLS,
OR GALVANIZED METAL
SIDING,
LONG SPAN WOOD TO
SUPPORT ROOF,
SHARED FREIGHT ELEVATORS.

REPEATING BAYS






Marine Business Center, Ballard              Holgate Square, SODO
Artistic concept of a work area improvement on site.      40,000 SF flexible office/industrial space as part of      Industrial orientation-shared spaces (2008)
Here the an open ground-plane maintains its industrial     marine repair complex. (2008)                    4-building complex
character with options for interior mezzanine.           20' clear ceiling heights on ground floor, subdivided suites  1,500 SF spaces, some with mezzanine - durable Low
Office space, on site wharves                     maintenance finishes
Free parking                              Light Industrial /flexible (IG2)
Mixed tenancies

22 FINAL REPORT  Fishermen's Terminal Planning Services, April 2016

Concept 2: Enhanced Public Experience

A typical Seattle resident's exposure to Fishermen's
Terminal is likely to revolve around buying the
freshest local catch. But for some, including visitors
from out of town, a trip to the Terminal might
also incorporate walking the docks, visiting the
Fishermen's Memorial, appreciating the boats,
listening to the sounds of Salmon Bay, and observing
the daily flow of work.
Geographically, public experience is concentrated
at the Fishermen's Center with Chinooks, Salmon Bay
Cafe, The Highliner Public House, and Wild Salmon
Seafood Market, and to some extent, the Nordby
Queen's Wharf in Auckland, NZ makes use of the building facade for wayfinding and signage. This building contains multipurpose space.
Building commercial tenants.
PUBLIC OPPORTUNITIES
Enhancing public exposure to the Terminal must be
carefully balanced. As a primary goal of the Long-
Term Strategic Plan, there are clear benefits such as:
Stewardship by future generations,
Educating the public about the role of fisheries in
Puget Sound,
Increased revenues for existing and future publicfacing
businesses,
Improving partnerships between the Port of
Seattle and interested organizations, and
Increased literacy for the contributions of the
Outdoor showroom and marine chandlery with activated ground floors.
maritime industry.


Fishermen's Terminal Planning Services, April 2016 FINAL REPORT 23

PUBLIC
Additional access to the site should not be elevated   intervention, i.e. footprint, overall location,
to the detriment of industrial users, but rather        audience, time-frame etc, begin with                    CURIOSITIES
curated for specific experiences, view points and     a one-time a design challenge and/or
observations.                            collaboration in a community-based, co-              What are these buildings used
designed approach. Early win interventions                 for?
The following concepts provide a flexible framework  should be interactive, inviting and simple.
to incrementally introduce public access. The intention                                          What is the history of the site?
is to allow visitors to actively engage with the       Mid-Term: Initiate creation of a public,
Terminal, while testing the site's capacity to respond.   co-designed walking tour                    Who works in the fishing industry in
Seattle today?
Early-Win: Time-Based and/or Small-Scale       Port staff report that walking tours at the
Improvement                      site are in high demand, and tours tend       What kinds of vessels are these, where
to fill up quickly. A longer-term goal for                    do they go?
Many cities have discovered that when done well,    Fishermen's Terminal is the creation of a
small scale interventions can provide a powerful     walking tour that incorporates specific            Where does my fish come from?
foundation for creating new knowledge about place,  nodes on site. The tour could make use
as well as opportunities for hands-on engagement.    of an audio component, app, or other           How can I support local fisheries?
The design and implementation of even temporary   technology. The walking tour could also tie
interventions helps create lasting partnerships and    into braoder place-making components, or       What is the relationship between the
can uncover larger future opportunities. In the short   interior space elsewhere on the site that          Terminal and its natural context: the?
term:                                 includes rotating or permanent displays.        regional watersheds; Puget Sound, Ship
Canal, Lake Washington, and the Cedar
Long-Term: Invest or adapt multi-purpose                  River?
Pilot small scale design interventions. This approach
spaces that house public displays or
can help test the capacity of the Terminal to
exhibits                                  How do fisheries relate to 
handle additional visitors, as well as gauge
interest.                                                                                tides                   cargos
Exhibits could focus on contributions to              currents      ships      personal
research, watershed resource protection,                      piles
Interventions could highlight the Terminal's function,                                            silts, salt                histories
and community building. This would help          spawning    weather
via small detours or discoveries with even low cost                                                                waves
ensure that future generations maintain a                    navigation
applications (paint, movable furniture, curated                                              alaska               the future
strong connection to Fishermen's Terminal,                    architecture
events). After defining the parameters of the
and choose to pursue businesses in the                      other ports
maritime industry.

24 FINAL REPORT  Fishermen's Terminal Planning Services, April 2016

Leverage Partners                      Invest in Improved Wayfinding and Signage
Fishermen's Terminal is well-loved by the community,   Develop a comprehensive signage program on
and there are already a number of mission-driven   site to brand the terminal, and upgrade aesthetics.
organizations and individuals narrating aspects     Signage program elements reduce potential
of the Fishermen's Terminal "story." Initiating        conflict between user groups - public visitors, on-site
partnerships beyond the Port's boundaries with those  employees, fishing and vessel industrial operations,
in education, the environment or other fields, can     and maintenance.
leverage existing expertise. Additionally, the Port
may have internal resources gained from previous   Key design concepts discussed with staff and
projects in creative placemaking (such as the SeaTac  stakeholders:
airport artist engagement program). Competitive
Introduce large scale lettering on building
grants may supplement internal Port financing.
facades. Take advantage of structures with good
visibility; i.e 21st Ave W, Emerson Place and from
Potential Partners:
the Ballard Bridge,
SCIENCE/EDUCATION FUNDERS              Use color, material treatments or landscaping to
Private Foundations                                 designate public access areas,
Include unique elements to coordinate with public
SCHOOLS
interpretation programs such as lighting or artistic
University of Washington, Seattle Maritime Academy
Pacific Maritime Institute, Cornish School of the Arts              concepts,
Commission specific treatments for high visibility
NON PROFITS/COMMUNITY ORGANIZATIONS     areas, such as a mural on Port of Seattle history
Friends of the Cedar Watershed
or successes, or kiosk with wayfinding signage.
Northwest Fisheries, Youth Maritime Training Association
Forterra, People for Puget Sound, Sustainable Fisheries
Foundation, Puget Sound Maritime Historical Society, Museums
GOVERNMENT AGENCIES
City of Seattle, King County 4 Culture
Seattle Public Utilities, NOAA, National Science Foundation, US
Army Corps of Engineers, National Endowment for the Arts


Fishermen's Terminal Planning Services, April 2016 FINAL REPORT 25

CASE STUDY PUBLIC PROGRAMMING IDEAS



The Freedom Trail - Boston              "Mind the Gap" - Seattle
- Connects historic sites throughout Boston          - Trail/signage designed in coordination with the Mt.
- Educational signage at each location           Baker Neighborhood to inspire thinking about social
- Travel through Boston to key sites without needing   equity
a map                         - Temporary installation for Seattle Design Festival     Fort Mason Exhibit: Wind arrows made of re purposed sailboat masts graph wind shear.



"Experiments in noticing and understanding"
Exploratorium, Fort Mason Interpretative Program
- San Francisco:
Considered a "museum without walls," a series of
novel outdoor exhibits focused on interaction with
Painted Path                       "Fog Plane" - San Francisco                the public, perception of the natural world, and the
- Travel through the site on a well-marked route     - Community designed project installed for the 3-day     interconnectedness of natural systems.
Market Street Prototyping Festival                  - Temporary (3-year term) exhibits
- Funded by National Science Foundation Grant
- Displayed at Fort Mason Historic Waterfront site
- Developed in collaboration with a variety of partners
26 FINAL REPORT  Fishermen's Terminal Planning Services, April 2016

Concept 3: Expand the Role of Workforce Development

Maritime occupations include boat-based jobs,        Coordinate with existing workforce development tenants, locate gaps, and identify resources needs.
and skilled trades, such as management science,
Act as "matchmaker" with those looking for space, education and training to strengthen relationships,
vessel design and repair. According to the Seattle
and build community.
Office of Economic and Workforce Development
2013 study, Maritime, Logistics and Shipping         Increase efforts to connect with youth in schools, and consider ways to incubate learning via internships,
have a positive economic outlook. However, many      apprenticeships, and career pathways.
small businesses still struggle to find space, or pull       Explore options for a small business incubator. Incubators can be designed to support co-locating small
together the resources and workers needed to        businesses with specialized Maritime sector knowledge. Apply, lessons learned from a recent pilot
successfully design and test new approaches, or       project at Pier 91 bldg C155.
open a new office. Others small businesses need
to retool business plans, revamp marketing and
network with others.
Stakeholders are strongly supportive of an                  COMMON AREA            CLASS ROOM /LAB          CONFERENCE /EVENTS
enhanced role for workforce development at
Fishermen's Terminal as a hub of activity - this will
broaden the reach of the existing businesses, as
well as spin off new jobs with stable wages.
Workforce development has spatial implications
in tenant programing, as well as pro-active
partnerships that allocate space for conferences
and meetings, or training facilities. Key
opportunities:
Engage and attract business; create relationships
and collaborative efforts with organizations and
small businesses that expand capacity of the
fleet and fishers.
Serve as hub of partnership with other
organizations such as The Puget Sound Industrial
Excellence Center/The Center for Advanced              WORK AREA                     WORKSHOP        MEZZANINE OFFICE
Manufacturing, and the Seattle Jobs Initiative.
Illustration of buildings with functioning, industrial ground floors and upper stories in other uses.

Fishermen's Terminal Planning Services, April 2016 FINAL REPORT 27

A NEW TERMINAL GATEWAY
The C-12/ Former Bank Building site has been
explored as a potential location for a "hybrid
building", with industrial components as well as
public facing or accessory uses such as workforce
development.
2nd level
On the edge of FT, and at its most public exposure
view deck
this site avoids impacts to the working waterfront,
and offers good visibility for new commercial tenants.
Potential programs include:                                     Industrial work yard
or interpretive space                      Use            SF
Public exhibit area; maps, and information,                               (6,888 SF)
Industrial         23,317
Showroom for maritime retail on the ground floor,
Office/flex         9,369
Potential multi-purpose room,
Retail            5,300
Workforce development space,
Total:            38,576
Incubator or offices on upper stories,
Options for shared shops spaces,
Secure outdoor work area and industrial space
with access via an interior courtyard,
Accessory lodging specific to maritime users,
New structure aligns
Possible location for maritime artifacts, such as an                   with existing net-sheds,
retired ship, anchor, or other materials on display.                and matches net-shed
width and spacing
Four massing models explored potential programs
at the Gateway. Options included both a phased
approach (keeping the existing building on-site while
constructing adjacent), and full-site redevelopment.
The option shown at right was selected for
preliminary costing. Note that parking associated                                                   Office lobby
Retail at entry corner
with retail could be accommodated at the site, while                                                 on Emerson Place
28 FINAL REPORT  Fishermen's Terminal Planning Services, April 2016

parking for other uses would be located elsewhere
on the terminal or in a future parking garage.
Gateway Design Concepts
Prioritize public use at entry, pedestrian
orientation
Use the street edge facade as billboard and
opportunity for compelling signage
Ensure designs are compatible with industrial
maritime architecture
Make the maritime character of the site visible
Consider industrial compatible characteristics such
as:
Secure yard or outdoor work area
Higher ceilings on ground floors
Hydraulic freight elevator connecting the two
levels of Industrial space 
Hydraulic elevator connecting office level with
ground level
Note: Demountable (removable or temporary)
buildings for the site were embraced by stakeholders
as a way to quickly improve the location, but without
overcommitting to a program.
A mix of industrial /
maritime buildings
provide ideas for
the design of the
gateway site.
Fishermen's Terminal Planning Services, April 2016 FINAL REPORT 29

Existing     2 Years     5 Years    10+ Years                                                PARKING BALANCE
Industrial                        200000     218000     286000     371000                                 1000
Office                          77000     97000     97000     97000                                900
800
Retail                           28000      33000      33000      38000
700
Lodging                                                10000                            600
Workforce Development           17000     22000     22000     22000                           500
Concept 4: Manage Parking ResourcesTotal             322000  370000  438000  538000                400
300
added                            48000    68000    100000
200
100
Provided Spaces                   690      641      603      824                               0
Required Spaces                   470      529      563      619                                  EXISTING     2 YEARS     5 YEARS    10+ YEARS
As development intensifies, the relationship betweenparking required full b/oassociated with new redevelopment sites. Diagrams469.5     600.75leasable spaces (office, walk-in trade or other) on667     857.8     slips = 337                    POTENTIAL SUPPLY        DEMAND (STANDARD BUILDOUT)
parking supply and demand must be well balancedparking requirement calculatorbelow illustrate one example of how existing surface100      109select frontages.143     185.5                               DEMAND (MAXIMUM BUILDOUT)
across the different user groups with new strategies   parking supply might shift. In this case, parking77       97        97       97
PARKING SITE GAIN AND LOSS                        PARKING SPACES: POTENTIAL ALLOCATION
to avoid conflict.                             is accommodated via a year-ten investment in a56        66ACCESS AND PARKING STRATEGIES66        76
Existing     2 Years     5 Years    10+ Years                                   0         0  PARKING BALANCE                                           PROVIDED PARKING SPACES
centralized parking garage. This would only be      The balance of parking supply and demand must0        4
Industrial                        200000     218000     286000     371000  necessary if parking issues cannot be mitigated100068EXISTING CONDITIONS88        88        88        2 YEAR TIMEFRAME              500
PARKING SUPPLY AND DEMAND                                   be considered for the duration of the plan. Key
Office                                                                                           900                                                           450
Parking demand at Fishermen's Terminal is driven77000     97000     97000     97000  through off-site solutions.                    opportunities are listed following:
800                                                     400
Retail                      by two factors - programmed area and boat slips.28000      33000      33000      38000Employment                        421       402       364       475
700
Lodging                                                10000Public                                     Including measures to monitor utilization to                350
However, as programmed area increases, so do the   The parking garage is shown at the current location175600     175      175      285
300
Workforce Development           17000     22000     22000     22000Leased                       75       45 understand current/pr        45       ojected demand,
required number of parking spaces. The supply and  of net shed 7 & 8. This location was selected for the      500                       45                           250
Total                     demand graph on the next page shows spaces for a322000    370000    438000    538000Reservedfollowing reasons:                19400       19  Initiating demand reduction via time restrictions                           19        19   -49 SPACES       ,              200
300
added                 "standard build-out" assuming simple, low industrial48000    68000    100000total check (1)                   1 690 SPACES 1 and reconsidering space devoted to on-terminal                      1       1  641 SPACES                 150
Near the entr ance to reduce traffic through the     200
100
West Wall buildings. The "maximum build-out"                                100         space to 3-day parking,
site,
Provided Spaces             assumes 55' tall West Wall buildings with added690      641      603      824                               0                                                       50
Impr oving connections to adjacent parcels (if off-                            Existing      2 Years      5 Years     10+ Years                                                        PARKING BALANCE
0
Required Spaces             mixed use capacity.470      529      563      619    Centr ally located, non-intrusive area with regards  EXISTING     2 YEARS     5 YEARS    10+ YEARS                                          PARKING BALANCE   PARKING BALANCE
Industrial Existing   site parking, or shared parking in satellite lots is                                  2 Years     Existing     5 Years   200000  10+ Years2 Years218000   5 Years   286000  10+ Years371000      EXISTING     2 YEARS      5 YEARS 1000 10+ YEARS
parking required full b/o              469.5     600.75       667      857.8    to industrial use and public experience.                           slips =Industrial337                Industrial POTENTIAL SUPPLY         DEMAND (STANDARD BUILDOUT)
Office      200000 initiated), and      218000     286000     200000    77000    37100021800097000     286000    97000     37100097000            1000                1000
EMPLOYMENT  PUBLIC  LEASED  RESERVED900
parking requirement calculator    The Terminal will lose allocated surface parking100       109       143      185.5                           Office   DEMAND (MAXIMUM BUILDOUT)
Office               Retail       77000     97000     97000    77000    28000     970009700033000     9700033000     9700038000             900                 900800
77      97      97      97  The parking garage could be designed with         Highlighting and separ                                                   800
Retail                Retail    Lodging      28000      33000      33000    28000  ating public access areas.    - Location defines parking usage, except in the case of leased and reserved spaces               800                  700
PARKING SITE GAIN AND LOSS                                                          3800033000    33000    3800010000
700
56      66      66      76                 PARKING SPACES: POTENTIAL ALLOCATION                      - Categories are counted exclusively (i.e., Fishermen's spaces that are also employment are only counted as Fishermen's)                         700              600
Lodging             Lodging     Workforce Development    PROVIDED PARKING SPACES      17000     1000022000     22000 - Reserved parking spaces will be relocated to ensure no net loss of spaces                         1000022000
600               600500
0       0       0       4                                                                  - Employment category includes required marina slip parking
SURFACE PARKING SPACE CHANGES OVER TIME        Workforce Development  Workforce Development             Total     17000    22000
500                      322000    22000    17000    3700002200022000    43800022000    53800022000            500                500400
68EXISTING CONDITIONS88      88      88      2 YEAR TIMEFRAME        Total 5 YEAR TIMEFRAME          10 year:  322000 10 YEAR TIMEFRAME
Total                         322000    370000    438000    538000370000    438000    538000            400                 400300
added450                           48000    68000    100000
added                downie site +                                  300              300200
added              400            48000    68000    10000048000    68000    100000
Employment                  421      402      364      475                                   5 year: 1                                           200              200
2 west wall                                                               100
350                                                                                   100
Public                           175       175       175       285                            Provided Spaces     2 year: bank  west wall         690       641       603 PARKING SUPPLY AND DEMAND COMPARISON                              824             100                   0
Provided Spaces     Existing    2 Years Provided Spaces        300                   buildings +
Required Spaces     5 Years    10+ Years                                          PARKING BALANCE
site + 1 west  690 building + 641        603690470       824641        603        824               0                    0    EXISTING     2 YEARS      5 YEARS     10+ YEARS
Leased                        75       45       45       45                                                             529      563      619
Required Spaces        250                  net shed site 470      529      563      619                 EXISTING     2 YEARS    EXISTING     2 YEARS     5 YEARS    10+ YEARS
Industrial           2 YEARS Required Spaces    200000     218000   parking required full b/o            5 YEARS   286000
wall building  470   371000
ship supply 529       563   10 YEARS  619                                                          5 YEARS     10+ YEARS
Reserved                      19       19       19       19                                               (raised) + 469.5    600.75      667 1000   857.8     slips = 337                    POTENTIAL SUPPLY        DEMAND (STANDARD BUILDOUT)
EXISTING                        -49 SPACES                     200 -38 SPACES                        +221 SPACES
Office                 parking required full b/o        77000     97000   parking required full b/o                parking requirement calculator            97000  469.5   97000  600.75      469.5   667100     600.75    857.8          900
109    slips =  667  143 337  185.5   857.8    slips = 337  POTENTIAL SUPPLY       POTENTIAL SUPPLY       DEMAND (STANDARD BUILDOUT)
total check (1)                         1 690 SPACES  1         1         1   641 SPACES                      150 603 SPACES       site     southwest    824 SPACES                                                    GARAGE        DEMAND (MAXIMUM BUILDOUT)DEMAND (STANDARD BUILDOUT)
Retail                  parking requirement calculator             28000      33000   parking requirement calculator             33000      38000          100       109       143 800   185.5                                     DEMAND (MAXIMUM BUILDOUT)
100       100       109                                                  DEMAND (MAXIMUM BUILDOUT)
corner 14377     185.5 97       97 700     97
Lodging                                   50       77   10000 97       77       97       97
buildings + 9756        9766        66        97
600     76                               Seattle Land Use Code Requirements
Industrial  1 space for every 2000SF
Workforce Development        Existing    2 Years    5 Years 17000 10+ Years                                       PARKING BALANCE
22000 0   22000 56   22000 66      66560      76 66 0   PARKING BALANCE          660 500    76                                 PROVIDED PARKING SPACES
parking   PARKING BALANCE                 4                                 Office  1 space for every 1000SF
PROVIDED PARKING SPACESPROVIDED PARKING SPACES
Industrial Existing     2 Years   Total    Existing     5 Years   200000  10+ Years      2 Years   218000   5 Years   286000     322000 10+ Years    371000     370000     438000    EXISTING    538000    2 YEARS      5 YEARS     10+ YEARS           400                                            Retail - 1 space for every 500SF
0       0
Industrial                        200000     218000     286000     371000                         garage  6800 1000      8840        880        884                                 500
WD  1 space for every 250SF
Industrial              Office      200000     218000added     286000    77000     371000    97000      97000      9700048000      68000 EMPLOYMENT      68 1000                 1000900                   300                                        500
100000 PUBLIC  88  LEASED 8868RESERVED   8888      88      88         500              450 Lodging  4 spaces for 16 rooms
Office                          77000     97000     97000     97000             900                 900                  200
Office                          77000     97000     97000     97000                                                   800
Retail                           28000      33000      33000      38000                                                                           450                  450400
Retail                           28000      33000      33000 - Location defines parking usage, except in the case of leased and reserved spaces                                 38000Employment       800               421 800700     402       364 100    475
Retail                Lodging      28000     Provided Spaces           33000      33000      38000                                                                                                                    400
Employment 690 - Categories are counted exclusively (i.e., Fishermen's spaces that are also employment are only counted as Fishermen's)                                     10000Employment                                                   400             350
Public641      603 421 700  824 402 implementation  364421175 700600    475402      364  0    475
Lodging                                                10000                                   175      175      285
depending on need                                                                                               350
Lodging             Workforce Development            17000     1000022000     22000 - Reserved parking spaces will be relocated to ensure no net loss of spaces                                           350               300
Required Spaces         Public      470    22000Public529      563  600  619        175 600500                     EXISTING     2 YEARS     5 YEARS    10+ YEARS
175      175      175
Workforce Development           17000                - Employment category includes required marina slip parking                 Leased                       75      28517545      17545      28545
300
Workforce Development  Total      17000    parking required full b/o             22000    322000    22000                                                                                     300              250
3700002200022000    43800022000    53800022000                         500400
469.5    600.75EXISITNG PARKINGLeased     667  500 857.8     5 to 10 year implementation option dependentslips = 75337      45       45    POTENTIAL SUPPLY45            DEMAND (STANDARD BUILDOUT)
Total            30 FINAL REPORT        Total 5 YEAR TIMEFRAME    Fishermen's Terminal Planning Services, April 2016               10 year:  322000 10 YEAR TIMEFRAMELeased                           75        45        45
370000    438000    538000Reserved                     19 400    4519      19 - Standard buildout assumes simple, low, entirely industrial west wall buildings19         250              250200
added    322000    370000    438000    53800048000    68000    100000          400
ADDED PARKING SUPPLYReserved                         on parking demand.300
parking requirement calculator Reserved    100       109       143 19    185.5 19        1919        1919        19 - Maximum buildout assumes 55' west wall buildings with additional mixed use capacityDEMAND (MAXIMUM BUILDOUT)19
downie site +                                                             300                                      200                 200
added            added             48000    68000    10000048000    68000    100000total check (1)    300             1 200     1       1 - Assume 4 story parking garage with 300 spaces1                         150
REMOVED PARKING SUPPLY
5 year: 1                    total check (1)  77       total check (1)97        97 1 200    97 1         11 200                                                                            2 west wall                                                                  100       11         1         1            150                  150100
Provided Spaces     2 year: bank  west wall        690      641      60356 PARKING SUPPLY AND DEMAND COMPARISON                           82466       66  100   76           1000                                                    100
buildings +                                                                                                            100                   50
Provided Spaces     Existing    2 Years Provided Spaces          Required Spaces     5 Years  690 10+ Years          690      641      603      824    PARKING BALANCE
0                 0   EXISTING     2 YEARS     5 YEARSPROVIDED PARKING SPACES10+ YEARS                 50
site + 1 west  building + 641        603        824
net shed site 470       529       5630       6190         0         4                                                       50                   0
Industrial                Required Spaces    200000     218000   Required Spaces    286000 470   371000 529        563470        529        563        619                   EXISTING     2 YEARS     EXISTING5 YEARS     10+ YEARS2 YEARS      5 YEARS     10+ YEARS
0   EXISTING     2 YEARS     5 YEARS    10+ YEARS
parking required full b/o           wall building  ship supply   (raised) + 469.5     600.75619       66768 1000   857.888     slips =88 337     88                POTENTIAL SUPPLY     500  DEMAND (STANDARD BUILDOUT) 0
-38 SPACES                          +221 SPACES
Office                 parking required full b/o        77000     97000   parking required full b/o                parking requirement calculator            97000  469.5   97000        469.5     600.75       667 900   857.8      slips = 337                                                                 EXISTING     2 YEARS    EXISTING5 YEARS     2 YEARS10+ YEARS    5 YEARS     10+ YEARS
603 SPACES       site600.75       667100  824 SPACES   857.8109      slips =143 337   185.5                POTENTIAL SUPPLY
southwest
POTENTIAL SUPPLY         DEMAND (STANDARD BUILDOUT)
800                               GARAGE       DEMAND (MAXIMUM BUILDOUT)DEMAND (STANDARD BUILDOUT)450                                           EMPLOYMENT  PUBLIC  LEASED  RESERVED
Retail                  parking requirement calculator             28000      33000   parking requirement calculator             33000 100   38000
Employment     109  corner 143100    185.5109      143                                               400                                     EMPLOYMENT  PUBLIC  LEASED  RESERVED
77      97      42197
185.5                               DEMAND (MAXIMUM BUILDOUT)
700    40297       364     DEMAND (MAXIMUM BUILDOUT)               475                                                       EMPLOYMENT  PUBLIC  LEASED  RESERVED
Lodging                                                                                                                                     350
77   10000
Public97 buildings + 977756       979766       9766       97
175 600    76                           Seattle Land Use Code Requirements
175      175      285
Industrial  1 space for every 2000SF
Workforce Development           17000     22000     22000     22000         56       66       66       76                                   PROVIDED PARKING SPACES300
56    Leased66 parking 660      760       750
500
454       45      45            Office  1 space for every 1000SF
PROVIDED PARKING SPACESPROVIDED PARKING SPACES250
Total                         322000    370000    438000 0  538000                                                                          Retail - 1 space for every 500SF
Reserved0  garage 6800       8840
400
88019      884                         500
19      19      19            WD  1 space for every 250SF  200
added                            48000    68000 68  100000 88      8868      8888      88 300    88         500              500450 Lodging  4 spaces for 16 rooms    10 year:
total check (1)                         1 200       1         1         1                                150 10 year:
450               450400 10 year:           downie site +
Employment                  421      402      364 100   475                        400              100downie site +
Provided Spaces          Employment 690      EmploymentPublic641      603 421     824402      364421
400               350downie site +  5 year: 1   2 west wall
175      475402175      364175  0   475285
350         5 year: 1  502 west wall
Required Spaces                   470      Public529      563      619        175      175      175      EXISTING285      2 YEARS350   5 YEARS  5 year: 110+ YEARS3002 year: bank2 west wall   west wall   buildings +
Public               Leased       175       175       17575       28545        45        45           3002 year: bank  west wall 300250site + 1 west2 year: bank           0
buildings +   building +west wall  net shed sitebuildings +EXISTING     2 YEARS      5 YEARS     10+ YEARS
parking required full b/o     Leased    469.5     600.75EXISITNG PARKINGLeasedReserved    667 75    857.8 45   5 to 10 year implementation option dependentslips = 457519337       454519        4519        45
- Standard buildout assumes simple, low, entirely industrial west wall buildingsPOTENTIAL SUPPLY19                     DEMAND (STANDARD BUILDOUT)
250site + 1 west   building + 250200site + 1 west   building +  net shed site
parking requirement calculator Reserved    100      ADDED PARKING SUPPLYReserved                    on parking demand.
109      143 19   185.5 19      1919      1919      19      19                          net shed sitewall building ship supply
- Maximum buildout assumes 55' west wall buildings with additional mixed use capacity                                  (raised) +
total check (1)                         1         1         1    DEMAND (MAXIMUM BUILDOUT)1            200                  200150wall building  ship supply          EMPLOYMENT  PUBLIC  LEASED  RESERVED
(raised) +
REMOVED PARKING SUPPLY                                              - Assume 4 story parking garage with 300 spaces wall building  ship supply   (raised) +      site
total check (1) 77       total check (1)97        97 1      97 1         11         11         1         1                                150                    southwest
150           site  100
southwest    site    southwest
56      66      66      76                                                                           corner
100               10050
PROVIDED PARKING SPACES      corner         corner
0       0       0       4                                          50              500               buildings +
0buildings +EXISTING      2 YEARS buildings +5 YEARS     10+ YEARS
68      88      88      88                        500                0                               parking
450                  10 year:EXISTING     2 YEARS  parkingEXISTING5 YEARS    2 YEARS10+ YEARSparking5 YEARS    10+ YEARS
EMPLOYMENT  PUBLICgarageLEASED  RESERVED
400                 downie site +             garage             garage
Employment                  421      402      364      475                                                EMPLOYMENT  PUBLIC  LEASEDEMPLOYMENTRESERVED PUBLIC  LEASED  RESERVED
350         5 year: 1   2 west wall
Public                           175       175       175       285
3002 year: bank   west wall   buildings +
Leased                        75       45       45       45                           250site + 1 west  building +  net shed site
Reserved                      19       19       19       19                           200wall building10 year:   ship supply  (raised) +
total check (1)                         1         1         1         1               10 year:            150
downie site +10 year:      site     southwest
100
downie site +  5 year: 1  downie site +2 west wall
corner
5 year: 1                      50
2 year: bank2 west wall   west wall5 year: 1   2 west wallbuildings +
0                 buildings +
2 year: bank  west wall  site + 1 west2 year: bankbuildings +   building +west wall  net shed sitebuildings +EXISTING     2 YEARS  parking5 YEARS     10+ YEARS
site + 1 west  building +  net shed sitesite + 1 westwall building  ship supplybuilding +  net shed site(raised) +
EMPLOYMENT  PUBLICgarage                                       wall building                              LEASED  RESERVED
wall building  ship supply   (raised) +   ship supplysite
southwest(raised) +
site     southwest      site     southwestcorner
corner            buildings +corner
buildings +            buildings +parking
10 year:                parking              parkinggarage
downie site +              garage              garage
5 year: 1   2 west wall
2 year: bank  west wall   buildings +
site + 1 west  building +  net shed site
wall building  ship supply   (raised) +
site     southwest
corner
buildings +
parking
garage

Existing     2 Years     5 Years    10+ Years                                                PARKING BALANCE
Industrial                        200000     218000     286000     371000                                 1000
Office                          77000     97000     97000     97000                                900
800
Retail                           28000      33000      33000      38000
700
Lodging                    Existing    2 Years    5 Years    10+ Years                                         PARKING BALANCE
10000                         600
Workforce DevelopmentIndustrial                    20000017000     21800022000     28600022000     37100022000                             5001000
TotalOffice                        32200077000    37000097000    43800097000
900
53800097000                         400
300800
addedRetail                        28000    4800033000    6800033000   10000038000
200700
Lodging                                                10000
100600
Provided SpacesWorkforce Development            17000690     22000641     22000603     22000824                            5000
400
Required SpacesTotal                        322000470     370000529     438000563     538000619      Existing   2 Years   5 Years   10+ Years      EXISTING     2 YEARS     5 YEARS PARKING BALANCE10+ YEARS
300
added                            48000    68000Industrial   100000      200000   218000   286000   371000                  1000
parking required full b/o              469.5     600.75       667      857.8      slips = 337
Office                          77000     97000     97000     97000 200 POTENTIAL SUPPLY             DEMAND (STANDARD BUILDOUT)
900
parking requirement calculator          100       109      Retail143      185.5        28000    33000    33000    38000 100 DEMAND (MAXIMUM BUILDOUT) 800
700
Provided Spaces                   69077       64197      Lodging60397       82497                          10000  0
600
Required Spaces                                                                                 EXISTING     2 YEARS     5 YEARS    10+ YEARS
PARKING SITE GAIN AND LOSS470     529    Workforce Development563     619     17000   22000  PARKING SPACES: POTENTIAL ALLOCATION22000   22000                500
56      66     Total66      76      322000   370000   438000   538000       PROVIDED PARKING SPACES400
parking required full b/o              469.5                                                                                    300
0     600.750     added6670     857.84     slips = 337 48000   68000   100000   POTENTIAL SUPPLY       DEMAND (STANDARD BUILDOUT)
200
parking requirement calculator          10068EXISTING CONDITIONS10988        14388      185.588       2 YEAR TIMEFRAME            500   DEMAND (MAXIMUM BUILDOUT) 100
Provided Spaces                   690      641      603      824450                             0
77      97      97      97
Required Spaces                   470      529      563      619                                  EXISTING     2 YEARS     5 YEARS    10+ YEARS
PARKING SITE GAIN AND LOSS                        PARKING SPACES: POTENTIAL ALLOCATION                  400
Employment                  42156     40266    parking required full b/o36466     47576      469.5   600.75    667   857.8   slips = 337 PROVIDED PARKING SPACES       POTENTIAL SUPPLY     DEMAND (STANDARD BUILDOUT)
0       0     parking requirement calculator0       4       100    109    143   185.5350                   DEMAND (MAXIMUM BUILDOUT)
Public                           175       175       175       285
77      97      97      97300
68 EXISTING CONDITIONS    88      88      88      2 YEAR TIMEFRAME          500
Leased                        75       45       45       45         56     66     66     76 250 450                  PARKING SUPPLY ALLOCATION                         Supply
PROVIDED PARKING SPACES         PARKING DEMAND CALCULATIONS
Provided Spaces                  690      641      603      824
Reserved                      19       19       19       19         0     0     0     4
-49 SPACES                      200
Employment                  421                              68    88    88    88 400               600
total check (1)                         1 690 SPACES 4021        3641        4751   641 SPACES                      150                                                                     Demand - Standard Buildout
350
500                                         Required Spaces             470    529    563    619
Public                           175       175      Employment175       285         496     447     409     520 100 300
Demand Calculation (Program Square Footage - Standard Buildout)
Leased                        75       45     Public45       45        175    175    175    285                   400
50 250                                                             Existing  2 Years  5 Years  10+ Years
Leased                                                                                                                      Industrial              200000   218000   286000   371000
Reserved                      19       19       19  Existing          0
19  2 Years    5 Years 0    10+ Years                                      PARKING BALANCE
0       0                         300
-49 SPACES                      200  0
PARKING BALANCE  PARKING BALANCE    Office        77000  97000  97000  97000
Existing     2 Years  Reserved
Industrial                      Existing     5 Years            19
200000 10+ Years    2 Years    5 Years 19    10+ Years19    19    EXISTING    2 YEARS    5 YEARS    10+ YEARS            Retail          28000  33000  33000  38000
total check (1)                         1 690 SPACES  1      total check (1)1         1   641 SPACES     218000     286000     371000                        200        1000
1       1       1       1 150                                                             Lodging                              10000
Industrial              Industrial       Office      200000     218000     286000     200000    77000     37100021800097000     286000    97000     37100097000                                 1000
100     EMPLOYMENT    1000    PUBLIC  LEASED  RESERVED    900                    Workforce Development      17000  22000  22000  22000
100
Office               Office    Retail       77000     97000     97000    77000    28000     970009700033000     97000    33000     97000                                                            Demand Calculation (Parking Spaces By Program - Standard Buildout)
38000 50       900              900  800
Existing    2 Years    5 Years    10+ Years
0          800                            Industrial                100    109    143    186
Retail                Retail    Lodging      28000      33000    Existing   33000    28000    2 Years   33000    5 Years   33000 - Location defines parking usage, except in the case of leased and reserved spaces                                    10+ Years38000             800                  700            PARKING BALANCE
38000            10000  0                  EXISTING   2 YEARS   5 YEARS  PARKING BALANCE            10+ YEARS
Office                          77       97       97       97
- Categories are counted exclusively (i.e., Fishermen's spaces that are also employment are only counted as Fishermen's)
Existing     2 Years     Existing     5 Years    10+ Years2 Years     5 Years    10+ Years       EXISTING 700            PARKING BALANCE            700
2 YEARS      5 YEARS 600  10+ YEARS               Retail              56    66    66    76
Lodging             Lodging     Workforce Development              Industrial                    200000    17000     10000218000                                            EMPLOYMENT PUBLIC RESERVED
Industrial                                  22000      286000     22000 - Reserved parking spaces will be relocated to ensure no net loss of spaces                              3710001000022000                                  6001000500                       Lodging              0    0    0    4
600
Workforce DevelopmentIndustrial           Workforce Development              Office     200000    218000    286000    200000    17000   77000    3710002180002200097000    286000    22000   97000 - Employment category includes required marina slip parking                    371000                                                  Workforce Development       68   88   88   88
17000    22000    22000    22000        Parking garage in this scenario shown above, 4-stories and                 2200097000       EMPLOYMENT1000
1000
Total                         322000    370000    438000    538000            500     PUBLIC  LEASED  RESERVED500900400
Office               Total   Office    Retail 5 YEAR TIMEFRAME
Total                         322000   77000    37000097000 10 year:                                                               900
438000    322000   97000   77000   28000 10 YEAR TIMEFRAME
53800037000097000
9700033000   438000   97000 approximately 300 spaces.
33000   5380009700038000          900              800
400               400300
Demand - Maximum Buildout
added                            48000    68000 - Location defines parking usage, except in the case of leased and reserved spaces                          100000           800              800
Retail                Retail       28000      33000 downie site +   33000    28000      3800033000      33000      38000            300                  300700200                       Required Spaces          638    769    836   1,026
added            added   Lodging           48000    68000    10000048000    68000 - Categories are counted exclusively (i.e., Fishermen's spaces that are also employment are only counted as Fishermen's)                                       10000010 year:10000          700              700
200600100                       Demand Calculation (Program Square Footage - Maximum Buildout)
Lodging             Lodging                                                              200
Workforce Development 5 year: 1  2 west wall 17000    1000022000     22000 - Reserved parking spaces will be relocated to ensure no net loss of spaces                         downie site +10000
PARKING SUPPLY AND DEMAND COMPARISON                    22000        600           600
100500
Existing    2 Years    5 Years    10+ Years
Provided Spaces         Workforce Development          2 year: bank  west wall        17000   690      22000641      603 5 year: 1   PARKING SUPPLY AND DEMAND COMPARISON                         - Employment category includes required marina slip parking                   824           100                 0                    Industrial          200,000  238,500  299,000  439,000
Workforce Development                       buildings +               22000    2 west wall22000                           500                  Office          77,000  95,000  113,000  129,000
Provided Spaces     Existing    2 Years Provided Spaces         Total 5 Years 17000 10+ Years 22000     22000     22000
Required Spaces 690      641     322000   603  690     370000
470      824641    438000           PARKING BALANCE         400
529 2 year: bank 603  563 west wall  538000          500
buildings +824619                   0                         0     EXISTING       2 YEARS       5 YEARS      10+ YEARS
5 YEAR TIMEFRAME                         10 YEAR TIMEFRAME                                                                                       Retail               28,000   29,000   38,000   88,400
Total                Total  site + 1 west    322000 building +  370000 net shed site      10 year:  438000     322000    538000370000    438000    538000            400                 400
site + 1 west  building +                                                          300                               Lodging                                      10,000
Industrial                Required Spaces    200000     218000   Required Spaces           added                                                                                                     EXISTING     2 YEARS      5 YEARS     10+ YEARS
parking required full b/o         286000
wall building  470   371000 529       563   470       48000619529       68000   563 1000  net shed site      100000619                   EXISTING     2 YEARS      5 YEARS     10+ YEARS
469.5    600.75      667     857.8     slips = 337                                      Workforce Development     17,000  40,000  40,000  40,000
added         ship supply  downie site +      (raised) +       48000 wall building 68000  ship supply 100000(raised) +          300              300200 POTENTIAL SUPPLY       DEMAND (STANDARD BUILDOUT)
Office                  added    77000     97000   parking required full b/o            -38 SPACES          48000     469.5    68000 +221 SPACES
97000    97000             600.75100000     667 900  857.8    slips = 337            GARAGE    200 POTENTIAL SUPPLY       DEMAND (STANDARD BUILDOUT)Demand Calculation (Parking Spaces By Program - Maximum Buildout)                                                                                                                                  parking required full b/o  parking requirement calculator             603 SPACES 469.5  5 year: 1    site600.75 2 west wall 667     857.8    slips = site 337  southwest          200 POTENTIAL SUPPLY     100 DEMAND (STANDARD BUILDOUT)
southwest 100 824 SPACES 109      143     185.5                               DEMAND (MAXIMUM BUILDOUT)              Existing  2 Years  5 Years  10+ Years
Retail                           28000      33000   parking requirement calculator                     Provided Spaces   33000      38000          100  690       109641       143  603 800  PARKING SUPPLY AND DEMAND COMPARISON                                 185.5corner824             100                  1000 DEMAND (MAXIMUM BUILDOUT)   Industrial             100    119    150    220
parking requirement calculator     2 year: bank  100  west wall 109 buildings +      corner 143      185.5
Provided Spaces                   69077       64197       603  97
Existing     2 Years     5 Years    10+ Years                                  700     82497     PARKING BALANCE      DEMAND (MAXIMUM BUILDOUT)                       Office              77    95    113    129
Lodging               Provided Spaces        Required Spaces     site + 1 west  69077  building +     10000 64197       603                                                        0
net shed site 97470       824529               buildings +               0                        EXISTING     2 YEARS      5 YEARS     10+ YEARS
77      97                                                           Retail           56   58   76   177
Required Spaces            buildings + 47056
97
52966
563  97 66      61997
600
563    parking 619  76                           Seattle Land Use Code RequirementsChart comparing changes in the
EXISTING     2 YEARS     EXISTING5 YEARS     10+ YEARS2 YEARS   Lodging 5 YEARS     10+ YEARS0    0    0    4
Industrial  1 space for every 2000SF         Workforce Development            68     160     160     160
Workforce Development             Industrial             Required Spaces   200000    17000    218000    22000  parking required full b/o       286000
wall building       22000 470   371000                                 1000                                            supply and demand of parkingPROVIDED PARKING SPACES
-38 SPACES 56  ship supply      22000 52966       469.5   5636656      600.75619                   (raised) + 0        76660        667   66 0 500   garage   857.8   764       slips = 337                       POTENTIAL SUPPLY         DEMAND (STANDARD BUILDOUT)
+221 SPACES                                                    Office  1 space for every 1000SFPROVIDED PARKING SPACES
Total   Office                 parking required full b/o         322000   77000    370000   97000   parking required full b/o                parking requirement calculator              438000   97000  469.5   97000   parking
600.75     469.5    600.75      667 900                        PROVIDED PARKING SPACES         spaces for two different buildoutPOTENTIAL SUPPLY        DEMAND (STANDARD BUILDOUT)
603 SPACES  0  538000   site  0        66710000  824 SPACES   857.8
southwest 68       1098840      slips =  143  88 0 400 337  185.5   857.84      slips = 337   POTENTIAL SUPPLY GARAGE      Retail - 1 space for every 500SF
500  scenarios   DEMAND (MAXIMUM BUILDOUT)DEMAND (STANDARD BUILDOUT)
garage                                                             WD  1 space for every 250SF       -Standard buildout assumes low, entirely industrial west wall buildings
Retail                  parking requirement calculator             28000      33000   parking requirement calculator             33000 100   38000109       143100       109       143 800    88
300   185.5                           500   DEMAND (MAXIMUM BUILDOUT)
added                            48000    68000 68  100000 88      886877     185.5  888897      88 97 700   88 97         500  DEMAND (MAXIMUM BUILDOUT)
corner                                                          450 Lodging  4 spaces for 16 rooms       -Maximum buildout assumes 55' west wall buildings w/ mixed use capacity
Lodging                                           77   10000 97       977756       979766       97 200
66      97         450              450                  -Parking requirements based on SMC 23.54.015
Seattle Land Use Code Requirements
buildings +                       600                                       400                       -All scenarios add 169 spaces required for 337 boat slips
Workforce Development           17000     22000   Employment 22000     22000       421      402               76
100                                      Industrial  1 space for every 2000SF
Employment    56      66     421 66560     4027666
364 66     475
500                                 400        PROVIDED PARKING SPACES
Provided Spaces          Employment 690      Public   641      603 421     824402  parking 364  175      475  175 0      364  175 0 0    475 76 4          400                350  Office  1 space for every 1000SF
285                  PROVIDED PARKING SPACESPROVIDED PARKING SPACES
Total                         322000    370000Public    438000 0  538000 0      17500         40         0 400                                    350  Retail - 1 space for every 500SF
Required Spaces                   470      529      563      619                                  EXISTING         350                300
Public               Leased       175       175   garage1757568      2851754588      175  45 88      285884      2 YEARS     5 YEARS     10+ YEARS500
WD  1 space for every 250SF
300    45                            300500
added                            48000Leased    68000 68  100000        68
parking required full b/o     Leased    469.5     600.75                     88        88        8888        88        88           300500                 250450  Lodging  4 spaces for 16 rooms
EXISITNG PARKINGReserved     667 75    857.8 45    5 to 10 year implementation option dependent                        slips = 457519337        454519         4519
- Standard buildout assumes simple, low, entirely industrial west wall buildings                                                    200 POTENTIAL SUPPLY4519                      DEMAND (STANDARD BUILDOUT)
250450               250200450
on parking demand.                                                                               400
parking requirement calculator Reserved    100      ADDED PARKING SUPPLY           Reserved109Employment 143 19    185.5 19        1942119        1940219        36419 - Maximum buildout assumes 55' west wall buildings with additional mixed use capacity                                    100    19
total check (1)                         1         1         1    DEMAND (MAXIMUM BUILDOUT)4751            200400                 200150400
Provided Spaces          Employment 690     REMOVED PARKING SUPPLY
total check (1)EmploymentPublic641       603 421     824402       3644211751       4754021751       364 - Assume 4 story parking garage with 300 spaces                 350
0    475
total check (1) 77        97        97 1      97 1         1         1        1751        2851                                150350
Required Spaces                   470      Public529      563      619        175      175      175      EXISTING     2 YEARS150350               285               5 YEARS    10+ YEARS100300
Public      56       Leased66        66 175     76 175       17575       28545        45        45           100300                100300
25050
parking required full b/o     Leased    469.5     600.75EXISITNG PARKINGLeased      667      857.8      slips = 75337       45        45    POTENTIAL SUPPLY45PROVIDED PARKING SPACES                                                                           75        45   5 to 10 year implementation option dependent45        45                                  DEMAND (STANDARD BUILDOUT)50                Fishermen's Terminal Planning Services, April 2016 FINAL REPORT 31
0      Reserved0       0       4         19      19      19 - Standard buildout assumes simple, low, entirely industrial west wall buildings19         25050              2502000
on parking demand.
parking requirement calculator Reserved    100      ADDED PARKING SUPPLYReserved109       143 19    185.5 19        1919        1919        19 - Maximum buildout assumes 55' west wall buildings with additional mixed use capacity
68      total check (1)88      88      88         1       1       5001   DEMAND (MAXIMUM BUILDOUT)19                         0
- Assume 4 story parking garage with 300 spaces1
2000                200150   EXISTING     2 YEARS     5 YEARS    10+ YEARS
REMOVED PARKING SUPPLY                                                                                                 EXISTING      2 YEARS      5 YEARS     10+ YEARS
total check (1) 77       total check (1)97        97 1      97 1         11         11         4501         1            150   EXISTING      2 YEARS150    5 YEARS     10+ YEARS
100     EMPLOYMENT  PUBLIC  LEASED  RESERVED
56      66      66      76                        400                100              100
EMPLOYMENT  PUBLIC50  LEASEDEMPLOYMENTRESERVED PUBLIC  LEASED  RESERVED
Employment                  421      402      364      475                                 PROVIDED PARKING SPACES
0       0       0       4                        350                50              500
Public                           175       175       175       285
300500                   0                 0   EXISTING     2 YEARS     5 YEARS    10+ YEARS
Leased                        7568      4588      4588      4588                          250                      EXISTING     2 YEARS    EXISTING5 YEARS    2 YEARS10+ YEARS   5 YEARS    10+ YEARS
450                                           EMPLOYMENT  PUBLIC  LEASED  RESERVED
Reserved                      19       19       19       19                           20040010 year:                    EMPLOYMENT  PUBLIC  LEASEDEMPLOYMENTRESERVED PUBLIC  LEASED  RESERVED
total check (1)Employment                     4211       4021       3641       4751
10 year:           150350
downie site +10 year:                                                                                                  Public                           175       175       175       285                             100
downie site +  5 year: 1  300downie site +
Leased                        75       45       45       45                           2 west wall
5 year: 1                      25050
2 year: bank2 west wall   west wall5 year: 1   2 west wall
Reserved                      19       19       19       19                           buildings +
2 year: bank  west wall  2 year: bank          2000
site + 1 westbuildings +   building +west wall   buildings +10 year:
total check (1)                         1         1         1         1                                 net shed siteEXISTING      2 YEARS      5 YEARS     10+ YEARS
site + 1 west  building +  net shed sitesite + 1 westwall building10 year:   building +  150
net shed sitedownie site +10 year:                 ship supply
100(raised) + EMPLOYMENT   PUBLIC   LEASED   RESERVED
wall building  ship supply  wall buildingdownie site +(raised) +   ship supply5 year: 1  downie site +
site     southwest(raised) +2 west wall
5 year: 1                      50
site     southwest2 year: bank2 west wall   west wall5 year: 1site     southwest2 west wallbuildings +
2 year: bank  west wall  site + 1 west2 year: bankbuildings +   building +west wall
0corner
corner            buildings +net shed site
buildings +corner
EXISTING      2 YEARS      5 YEARS     10+ YEARS
site + 1 west  building +  site + 1 west
buildings +net shed sitewall building  ship supplybuilding +  buildings +net shed site
wall building  ship supply   parking(raised) + EMPLOYMENT  PUBLIC  LEASED  RESERVED
wall building  ship supply
10 year:                parking(raised) +     site     southwestparking(raised) +
site                   site     southwestgarage
downie site +              southwestgarage              garagecorner
5 year: 1   2 west wall                 corner              buildings +corner
2 year: bank  west wall                                           buildings +
buildings +               buildings +              parking
site + 1 west  building +  net shed site10 year:                 parking               parkinggarage
wall building  ship supply  downie site +               garage               garage
(raised) +
5 year: 1site
southwest2 west wall
2 year: bank  west wall   buildings +corner
site + 1 west  building +
buildings +net shed site
wall building  ship supply
parking(raised) +
site     southwestgarage
corner
buildings +
parking
garage

5 NEXT STEPS
The following are next steps identified for each of the four Planning Concepts.
1 ANCHOR THE INTERBAY INDUSTRIAL CLUSTER: WORK AREA      EXPANSIONS & IMPROVEMENTS     Public Interpretive Space
Conduct a cost-benefit analysis of options for devoting indoor
space to exhibits, and consider any co-benefits for on-site
Move forward with Phase 1 development projects, and draw on                multipurpose spaces. Continue to look for ways to incorporate
specialized expertise in robust, industrial building types. Work to            creative, educational, and playful public installations, such as
refine programs, and conduct outreach to potential tenants.                including them into existing or future event spaces.
Vet options for a more comprehensive land use policy (including
for example, compatibility policy statements) at Fishermen's
Terminal that will support long term industrial health in the Interbay
Manufacturing and Industrial Center.                        3 EXPAND THE ROLE OF WORKFORCE DEVELOPMENT
Continue to explore the potential for a Maritime Hostel: Refine
the market, and target clientele; drill down on potential economic              Continue to partner with the City of Seattle to support Economic
model and phasing; and consider the hotel/identified need in                Development initiatives at FT.
relation to                                                      Reach out to potential partners and stakeholders to develop a
1) Live-aboards already allowed at FT,                          refined approach for FT workforce engagement.
2) Residential listings (AirBnB) already in the vicinity of FT.
2 ENHANCE PUBLIC EXPERIENCE     4 MANAGE PARKING RESOURCES
Develop a Fishermen's Terminal Public Experience Plan: Pursue                   Probe additional strategies, such as one 4-four story garage
partnerships with other organizations; further conduct initial                  versus multiple 2-story garages serving different zones.
outreach, such as interviews with key elder fishers and long term
tenants; scope proces; and retain specialist consultant to lead                 Document existing on-site parking utilization. This will allow the
effort.                                                           Port to better understand current resources, proejct demand, and
better prepare for land use intensification.


32 FINAL REPORT  Fishermen's Terminal Planning Services, April 2016

of Seattle '

Limitations of Translatable Documents

PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.