PORT OF SEATTLE 
MEMORANDUM 
COMMISSION AGENDA               Item No.      7b 
STAFF BRIEFING 
Date of Meeting      May 6, 2014 
DATE:    April 22, 2014 
TO:     Tay Yoshitani, Chief Executive Officer 
FROM:    Ralph Graves, Managing Director, Capital Development Division 
Wayne Grotheer, Director, Aviation Project Management Group 
SUBJECT:  Project Delivery Briefing for Sea-Tac International Airport International
Arrivals Facility (IAF) program (C800583) 
SYNOPSIS 
The Port Commission was most recently briefed on April 22 about the Airport's
continuing growth in international air traffic and the need to replace the current 40-year
old FIS facility. The existing facility has surpassed its design life and needs to be
renewed to meet the Port's ambitious Century Agenda goals toremain competitive with
other West Coast airports.
Port staff is currently moving forward with development of a capital program utilizing
the alternative contracting method known as progressive design-build project delivery to
replace the existing FIS facility with a new International Arrivals Facility located
landside of Concourse A. The purpose of this presentation is to review project delivery
options considered, describe the progressive design-build delivery process in detail and
explain how progressive design-build will contribute to the overall success of the IAF
Program. 
ATTACHMENTS TO THIS BRIEFING 
Computer slide presentation. 
PREVIOUS COMMISSION ACTIONS OR BRIEFINGS 
April 22, 2014  Capital Program Briefing 
March 11, 2014  IAF Master Planning authorization. 
February 25, 2014  IAF Program Briefing 
November 19, 2013  International Arrivals Facility Construction Management,
testing and inspection; surveying and locating and safety service agreements. 
July 23, 2013  International Arrivals Facility Project & Program Support; and
Price Factor Design Build Methodology authorization. 
July 9, 2013  Sea-Tac Airport International Arrivals Facility Briefing. 
July 9, 2013  Alternative Public Works Contracting Briefing. 
April 9, 2013  Sea-Tac Airport International Arrivals Facility Briefing. 

Template revised May 30, 2013.

COMMISSION AGENDA 
Tay Yoshitani, Chief Executive Officer 
April 22, 2014 
Page 2 of 2 
June 26, 2012  Briefing on Airport Terminal Development Challenges at Seattle-
Tacoma International Airport. 
June 14, 2011  International Air Service Growth and Future Facility briefing. 
February 2, 2010  Briefing on South Satellite Passenger Growth and Facility
Considerations, Delta's Proposed Airline Lounge and Other Possible Future
Aviation Projects.

Limitations of Translatable Documents

PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.