Item #-6a_Attach DEPARTMENT OF Date: March 27, 2012 ECOLOGY Port ofSeattle Terminal 91 Site State of Washington Hazardous Waste and Toxics Reduction Program January 2012 Agreed Order for the Cleanup Comments Accepted Action January 20 - March 5, 2012 Submit Comments and Technical Questions to: The purpose of this fact sheet is to inform you about the Galen Tritt - Site Manager planned cleanup of a former tank farm and other areas at the Department of Ecology Port of Seattle's Terminal 91 Site. This Site is located at 1440 10'h Street Suite 102 2001 West Gareld Street, Seattle, WA. Bellingham, WA 98225 Phone: (360) 715-5232 Fax: (360) 715-5225 The Department of Ecology (Ecology) and the Port of Seattle E-mail: galen.tritt@ecy.wa.gov (Port) will enter into an Agreed Order to clean up the Site. Under the Agreed Order, the Port will complete the Cleanup Document Review Locations Action Plan tasks, including installation of remedial systems Seattle Public Library - Central and compliance monitoring. The Port will also address 1000 Fourth Avenue Seattle, WA 98104 contamination in the Upland Area of the Terminal 91 (206) 386-4636 Facility. Seattle Public Library Magnolia Publlc Comment Invlted Branch 2801 34''1 Avenue w You are invited to review and comment on the: Seattle, WA 98199 (206) 386-4225 o Agreed Order 0 Modied Dangerous Waste Management (Dangerous Port of Seattle Pier 69 Waste) Permit 2711 Alaskan Way Seattle, WA 98121 Send your comments to Ecology for consideration. (206) 787-3414 Comments will be accepted January 20 through March 5, 2012. Department of Ecology Northwest Regional Office 3190 160'h Ave SE To receive more information, please contact Galen Tritt at Bellevue, WA 98008 galen.tritt@ecy.wa.gov or (3 60) 715-5232 and ask to be Call for an appointment: Sally Perkins added to the mailing list. If responding by email, please put Phone: (425) 649-7190 Port of Seattle Terminal 91mai1ing list in the subject line. Fax: (425) 649-4450 E-mail: sally.perkins@ecy.wa.gov Modlflcatlon of the Dangerous Waste Permlt Hours: Tuesday Thursday Enforcement of the US. Environmental Protection Agency's 8:00 am 12:00 pm 1:00 pm 4:30 pm (EPA) Hazardous Waste requirements is delegated to Ecology. Ecology's regulations require the Port, as land Ecology's Toxics Cleanup Website: owner, to maintain a Dangerous Waste permit for this Site https://fortress.wa.gov/ecy/gsp/ until corrective action is completed, even though the Sitepage.aspx?csid=2674 Burlington Environmental Inc. (BEI) permitted waste Cleanup ID #: 2674 treatment and storage facility ceased operations in 1995. Facility ID#: 24768 Publication Number. 12-09-163 1 Hazardous Waste and Toxics Reduction Program This Dangerous Waste permit species that 0 A Restrictive Covenant will be placed on the Port (as permittee) will perform the the property. The restrictive covenant corrective actions referenced in the Agreed will limit exposures to hazardous Order. The modication is necessary to substances by regulating land uses on the update the permit that took effect in 2010. property and providing notice to future The new Agreed Order will be incorporated users as to the presence of hazardous into the permit, and the permit will terminate substances. the 2010 Agreed Order since those conditions have been fullled or will be replaced by the Updated Publlc Partlclpatlon Plan new Agreed Order. ' An updated version of the Public Participation Plan is now available for public Agreed Order review and comment. The Public The Agreed Order requires the Port to Participation Plan is designed to promote implement the Cleanup Action Plan for the meaningful community involvement during Tank Farm Affected Area. The Port also is the cleanup process. The plan outlines and required to address contamination in the describes the tools and approaches that Upland Area of the Terminal 91 Facility. Ecology will use to inform the public about site activities, and it identies opportunities In this Agreed Order, the Port will complete for the community to become involved in the work that was proposed in the 2010 this process. Agreed Order. That work includes construction of a permanent barrier to prevent Slte Background migration of contamination to Elliott Bay. The former tank farm at this Site was The Port agrees to complete the following: operated by Philip Services Corp. as a permitted dangerous waste treatment and o Pre-design work as dened in the Data storage facility, and by other Port tenants as a Gaps Investigation Work Plan. fuel storage and distribution tank farm. 0 The Engineering Design, to be completed in three stages: The chemicals of concern for subsurface soil 1. Design Basis Memorandum and groundwater at the site include: 2. Draft Engineering Design Report Diesel-range petroleum hydrocarbons. 3. Final Engineering Design Report Gasoline-range petroleum hydrocarbons. 0 Installation of remedial actions described in the Cleanup Action Plan. Heavy-oilrange petroleum hydrocarbons. Metals. 0 Operation and maintenance of installed remediation systems. Polychlorinated biphenyls. Semivolatile organic compounds, 0 Compliance monitoring after construction is completed. including polycyclic aromatic hydrocarbons. 0 Investigation and cleanup of Discrete 0 Volatile organic compounds. Units in the Upland, which are not included in the Tank Farm Affected Area Cleanup Action Plan. i! Publication Number: 12-09-163 Q.) Please reuse and recycle Hazardous Waste and Toxics Reduction Program The property is located in an industrial area connection with King County's need to in the Interbay neighborhood of Seattle. It construct an underground combined sewage was operated by various oil companies from overow storage vault ("CSO Project") on 1926 until 1941 when the US. Navy took the Port's parcel (shown on the figure as the possession. The Port acquired the facility in West Yard). The land exchange will not the 1970s, and the tank farm was operated by affect the cleanup plans but would change Philip Services Corp. and its predecessors the boundary of the land subject to the from that time until 1995. The tank farm was Agreed Order. also operated by various marine fuel marketing companies until 2003. The tank For more Informatlon about the cso farmwas demolished by the Port in 2005. Project: wwwkingcounty.gov/environment/wtd/ Construction/Seattle/SMagnoliaCSOStorage. Port's Aspx _,, Potentlal Land II Pon 4. Exchange ofSeattle The Port may exchange a parcel of uncontaminated land at T91 with a parcel of land currently owned by the City of Seattle in 7 . 1 1mm: mummz ' 41 Squawk": l . _ 7 A we" - Nae: FwarussnounlshiF-m WMWMIMMT" Lumenmmm >N Port of Seattle Terminal 91 Faclllty mMMw lg: 2001 w. Gardd 9e sane, WA 93119 SM" mmdumanmm Publication Number: 12-09-163 n :3 Please reuse and recycle "4' fig I DEPARTMENT OF PRESORTED rm EarL: ,. FIRST CLASS MAIL EC0L0 CIY US POSTAGE PAID State of Washington WA STATE DEPT OF PRINTING 98501 3190160'" Ave SE Bellevue, WA 98008 PI | a ease recyce . Port of Seattle Terminal 91 Site What can you do? Seattle, WA Ecology See-ks Public Comments on the Agreed Order for the Read about the cleanup in this Cleanup ActIon handout. To get more detailed information, Public Comment Period: January 20 March 5, 2012 reVIGW the Upp9rt|ng _d00[1ment8 ' at the locations listed In this "mumm- Cleanup ID #: 2674 Facmty ID #3 24768 Write down your comments and questions. Send them to the Department of Ecology at the address provided in this document. Ifyou need this document in a format for the visually impaired, call We appreciate your comments Nancy Lui at (425) 649-7117. Persons with hearing loss can call and concerns. Thank you. 711 for Washington Relay Sen/ice. Persons with a speech disability can call (877) 833-6341.
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.