6a supp
ITEM NO: 6a supp______ DATE OF MEETING: February 28, 2012 Possession and Use Agreement Between WSDOT , the Port and TTI for the partial taking of T-46 for Phase 3 of the S. Holgate to King Street Viaduct Replacement Project S. Holgate to S. King Street Project Previous U-Tube Concept S. Holgate to S. King Street Project Current Bridge Concept Port __ of Seattle Proposed T-46 Property Transactions for Stage 3 of the S. Holgate Street to S. King Street Viaduct Replacement Project MmmCHhH-SI-d ' ////// / 7////////////////// ////////'/ ///, may...a.nr..ma aw-3.3:" Construction Timeline 2012 2013 2014 2015 2016 2017 South end roadway S. Atlantic St. overcrossing Tunnel portals - utility relocation Tunnel portals - cut-and- cover sections, buildings Tunnel boring Interior roadway and systems On/off- ramp construction Tunnel open to drivers Central waterfront viaduct demolition Surface street improvements S. Holgate Street to S. King Street Project SR 99 Tunnel Project
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.