3b supp
Item No.: 3b_Supp Date of Meeting: November 22, 2016 Airport Terminal to Light Rail Transit Walkway Commission Meeting November 22, 2016 1 Current Initiatives Immediate walkway improvements Airport Signage and Wayfinding Program Airport-wide signage and wayfinding study Development of Airport signage master plan Light Rail Walkway Options Study Evaluation of options, complete Q4 2017 Objective: Improve Quality of Service between Airport Light Rail Station and Terminal 2 Existing Walkway Inside Main Garage Connects to Airport Station and International Blvd pedestrian bridge No moving walkways due to floor height Passengers can use Airport wheelchair service Adverse Weather Impacts 3 Garage Walkway Improvements Phased Approach Phase 1 ~$1.8M (wind screens, painted ceiling, column wraps, cart service) Phase 2 ~$1.7M (floor treatment, gas radiant heat, fire protection) Immediate Improvements 4 Garage Walkway Improvements Improved passenger experience 5 Elevated Walkway Improvements Section Elevation Improved Weather Protection 6 Authorization Request Request Commission authorization for the Chief Executive Officer to: (1) prepare design and construction bid documents (2) advertise and execute major works construction contracts (3) purchase goods and services (4) utilize Port crews Total estimated cost of $3,500,000 7
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.