7a supp
Item No. 7a_supp Meeting Date September 26, 2017 C800612 Baggage Optimization 2017 Quarter 3 Briefing 1 Purpose Replaces six individual baggage screening systems with a centralized system that optimizes the operation and functionality of the checked baggage system Scoped to accommodate 60 Million Annual Passengers (MAP) 2 Schedule Phase 1 Notice to Proceed issued on May 26, 2017 and construction is underway Phase 2 Service Directive being issued to develop Bid Document design Overall project construction expected to be complete in 2025 Quarter 2 3 Schedule Three phases of construction 4 Financials Total Project Budget $445,050,000 Total TSA Contribution $93,220,422 Total Commission Authorization to Date $136,312,200 Amount Spent to Date (as of 8/15/17) $22,727,874 TSA Reimbursement to Date (as of 8/15/17) $5,834,580 Project on budget as currently scoped 5 Phase 1 Progress Demolition in Central Terminal (CT) area Preparation for CT building extension Utility relocations in CT area Shoring for elevator pits Demolition of existing tenant space Upcoming work: demolition of CT ramp between basement & ramp levels and BHS submittals 6 Demolition in the Central Terminal area 7 Footprint of Central Terminal building extension 8 Shoring for future elevator pits 9 Contract Requirements Program Requirement / Goal To Date Small Business Enterprise (SBE) 15% of contract value Initial reporting period has not yet occurred Small Contractors & Suppliers (SCS) 5% of SBE Initial reporting period has not yet occurred Apprenticeship 15% of total hours 11% Progress as of 7/25/17 10
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.