9a South Satellite presentation
Item No. 9a supp Meeting Date: June 12, 2018 South Satellite Infrastructure Upgrades Commission Meeting June 12, 2018 1 South Satellite Single Aircraft at South Satellite in the early 1970's 2 Design Concepts for Full Renovation Full Renovation: $850M - $1.6B 3 Potential Interim Improvements Areas being evaluated for potential investment in the near term. 4 Next Steps Evaluate scope items Package scope Cost benefit analysis Return for Authorization Staff will return for authorization of interim projects once all possible scope items have been evaluated. 5 Integration of Proposed Project to Larger Renovations $850M - $1.6B* Original 50 Year Building $12/22 M Original HVAC Project Scope: Full Renovation of HVAC Only South Satellite 2018 2022 2028 $52 M $ Price TBD $1.2B - $2.2B** Proposed Expanded Project Scope: 50 Year Building HVAC Interim Renovations: Lights & Ceiling Preserves work completed by Fire sprinkler system proposed project Full Renovation of Signage South Satellite (Project Start) Carpet Full abatement *conceptual estimates assuming completion in 2028 ** additional escalation needs to be applied based on actual schedule Proposed project will accomplish immediate needs that should be addressed, pending interim renovations. 6 South Satellite Design vs Use of 47 year old HVAC System 7 HVAC Underperformance Affecting Passenger Experience Design Temp: Design Temp: Outdoor Temp: Outdoor Temp: 68-72 30 85 68-72 Actual Temp: Actual Temp: 60 80 Immediate need - Heating, Ventilation and Air Conditioning is no longer working as designed 8 HVAC Underperformance Limiting Non-Aero Opportunities Project would deliver increased HVAC capacity for Airport Dining & Retail 9 What the Project Accomplishes Improved Passenger Experience Project Supported by Airlines Reliability new equipment Increased HVAC Capacity (including ADR) Reduce energy consumption (lighting and HVAC system) Asbestos removal Constructability Improves Passenger Experience 10 Equipment New, replacement equipment includes: HVAC air handler Light fixtures Cooling and heating coils and Electrical infrastructure for heating water piping lights and signage Controls and variable frequency Fire sprinkler system drives Signage Terminal distribution boxes Ceiling Diffusers Carpet Motor control center Updates several pieces of outdated equipment 11 Improved Passenger Experience at the South Satellite Old vs. New Updated Ceiling Next Steps Commission Action - 6/26/18 for added scope approval Commission Action - 10/9/18 for budget increase and construction authorization Commission Briefing - Q4 2018 for update on other interim projects for the South Satellite Six Month Look Ahead 13
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.