7c supp

PORT OF SEATTLE COMMISSION 
SEPTEMBER 10, 2013

AGENDA 
Overview of Waterfront Seattle and associated
interests 
Quick Seawall Update 
Waterfront Seattle 
Schedule 
Street Design 
Budget/Funding 

2

ELLIOTT BAY -     Elliott Bay Seawall Project
[Phase 2]


Elliott Bay Seawall Project
[Phase 1: 2013-2016]

L."f'i'*t<\.[        *                                       Seattle Multimodal Terminal
{'1      9 .vg'n                                 at Colman Dock Project
.
T.' }   ~-"."';':n~.. '
-L
urvlm,          [2015-2020]
7
Pi :\ Waterfront Seattle        Y
La    '4'4'    [Core Projects: 2016+]
5.,                                           g 47:; .,
a" .'[Potential Early Projects
.
1
'
' "W    " 2013'2015'
Ca           "2"" .
,:               , -
WATERFRONT SEATTLE c0RE PROJECT AREA
'

,                                   4
, I-    "far! 4 Im n 3:.    '17 -.I . '               '1
.1          '      ,
'29
11;:                                      '- _ELLIOTT BAYSEAWALL PROJECT PHASE1                                                                                                                                       g, 1 .
a
"-'>5l.;,~m_.3              I
r.                                                                        I I ELLIOTT BAY SEAWALL PROJECT PHASE 2

I I SR 99 TUNNEL PROJECT
- SEATTLE MULTIMODAL TERMINAL AT
COLMAN oocx PROJECT
- PARTNER PROJECTS
Project construction dates are tentative and
subject to change
Sources: City of Seattle GIS, Google maps.
SDOT 2010 Bike Map. ROMA 2002 Urban Design Assessment

' "d'fifp'I'hEE

A
43AM?" 9- -r.=-.'.'.-..
.sc  2.

Getting Ready for Seawall Construction 
Early work completed (April  Sept) 
27 temporary utility poles installed along Alaskan Way 
4,500 linear feet of conduit installed 
Widened Alaskan Way roadway (where temporary road will be located) 
SCL electrical installation 
Design completion and construction 
schedule refinement 
Continued permit coordination 
Continued planning with waterfront 
stakeholders 
Negotiate MACC and subcontracting 
4

2010  2011   2012  2013  2014  2015  2016  2017  2018  2019

WATERFRONT       CONCEPT D SIGN
SEATTLE

E  VIRONM  NTAL RE  IEW. PE  MITTINGAND DESIGN

CONSTR CTIONB GINS


ELLIOTT BAY    ENVIR NMENT L REVIE   PERMITTING AND DESIGN
.
SEAWALL PROJECT

P ASE ONE CONSTR CTION
PHASET o
CONSTR CTION


SR 99 TUNNEL
CONSTRHCTION
VIADUCT DEMOLITION


2010  2011  2012  2013  2014  2015  2016  2017  2018  2019

- = PLANNING & DESIGN - =CONSTRUCTION

Core Projects




E>me    nImmm<         25302                                  Exm
>U_woz    mvazm    mmZmn>            Cz_oz
m._..
w         OOrCZw;                                ma.
m._..         m....         m...'    m4.    CZ_

            

Limitations of Translatable Documents

PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.