6f Presentation Parking Garage Elevator Modernization
Item No. __6f_supp Meeting Date: January 22, 2019 Parking Garage Elevator Modernization Commission Meeting January 22, 2019 1 Parking Garage Elevator Modernization PG C PG B PG D PG A PG E Project Overview 1/15/2019 2 Parking Garage Elevator Modernization Phase 1: Elevator Vestibules and Lobbies Design Complete: Q1 2019 Construction Complete: Q1 2020 Phase 1 Scope Weatherize the PGB and PGC Elevator Towers Refresh lobbies on all floors (PGB through PGE) Elevator Vestibules and Lobbies Summary 3 Parking Garage Elevator Modernization Phase 2: Elevator Mechanical and Electrical Systems Renew all 27 Elevator Cabs in parking garage (PGA - PGE) Comprehensive renovation on all five elevators at PGB Comprehensive renovation on all five elevators at PGC Replace electrical drive systems on all five elevators at PGD Replace four of the five electrical drive systems at PGE Project Overview 4 Parking Garage Elevator Modernization Begin Design Q2 2019 Design Complete Q2 2020 Commission Approval (Construction) Q2 2020 Bid Construction Contract Q3 2020 Construction Complete Q3 2023 Phase 2 Project Schedule
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.