6i Presentation Industrial Wastewater Glycol Management

Item No. _6i_supp_ 
Meeting Date: January 22, 2019 
Industrial Wastewater System Glycol
Management Improvements Project Budget
Increase 
Industrial Wastewater System
Improvements Project 



1

Industrial Wastewater System Improvements
Project Location - South end of airport between the Snow Shed and IWS Lagoons 





Project location 
2

Industrial Wastewater System Lagoon locations and
capacities 



Lagoon storage capacities 
3

Limitations of Translatable Documents

PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.