Asset Management Services Contract Information Exchange Roadmap

[Stamp] txs623
#clipboard
Roadmap to Establish a Facility Information Exchange that Supports the One Port Vision
Phase 0 (2018-2019)                          Phase 1 (2020-2021)                          Phase 2 (2022-2023)                          Phase 3 (2024-2025)                          Phase 4 (2026-2027)                          Phase 5 (2028-2030)
Standards and Processes                    Prioritized Facility Migration                    Legacy Facility Migration                   Asset Management Integration                    Life Cycle Optimization                Strategic Asset Life Cycle Management



Facility Information Benefits Reduce cost of ongoing and future capital          Improved collaboration and coordination of Port     Reduce operational expenses through improved     Reduce operational and capital expenses through   Ability to fully track asset costs from planning, design Leverage emerging technologies to radically reduce
construction projects                          department activities                          labor productivity                             imporved life cycle asset management.            and installation through renewal/replacement.       cost of planning, construction, operations and
maintenance of all Port facilities.
Improved Project Management of ongoing Capital   Improved planning capabilities for long-term growth  Improved accuracy of asset condition and inventory  Improve service qualilty with enchanced           Utilize Lean Management practices to optimize work
Projects requiring BIM                                                                                                               collaboration/communication with airline, tenants and processes leveraging real-time, accurate facility     Port-Wide strategic asset life cycle management
passengers                                  information.                                  utilizing ISO-55000/Total Cost of Ownership best
practices.
Improved disaster and emergnecy response        Develop integrated port-wide (aviation, marine and
capabilitie with enhanced                       real estate) asset and financial management system.
collaboration/communication with external agencies


People/Organization
Communication/Collaboration   Collaborating within each department             Collaborating between departments               Real-time Alignment of Departments within each     Collaboration between divisions                  Real-time Alignment of all Divisions within the Port   Alignment of Port with Regional Agencies
Division
Many individual facility information systems         Sharing individual facility information systems
Unified facility information systems
Staffing Needs   BIM Steering Committee                       BIM Manager                                BIM Designers                               Information Managers                         Information Analyst & Developers                Information Innovation Manager
Port Information Manager
Departments   Create "Centers of Expertise"                   Strategic Initiatives                            Finance & Budget                             Port Information Department                    Port-Wide                                   Regional Collaboration
Aviation F&I                                 AvM & F&I                                  Environment & Sustainability
Marine Maintenance                           Marine Maintenance                           Security & Preparedness
CDD                              Planning
ICT
Survey
Legal
Training Education   Process and Standards                        Facility Information Tools                       Facility Information Management, Tools and        Asset Life Cycle Processes & Knowledge Sharing   Knowledge Sharing between Divisions - Learning    Knowledge Sharing with other regional and
Technology                                                                            Organization                                 international agencies

Culture   Task Excellence                              Task Optimization                            System & Process Optimization                  Organizational Excellence                      Organizational Optimization                     Organizational International Best of Class Port
Process/Life Cycle Management
Standards   BIM Standards & Processes                    DfM Processes                               Asset Total Cost of Ownership (TCO)             Asset Life Cycle Management (ALCM)            One Port Asset Management System             ISO-55000 ALCM Processes
Design for Maintainability (DfM)
Design for Sustainability   BIM Contract Language                        Asset Management Data Standards              Design for Sustainability                                                                  Lean PM/CM
Policies/Contracts
Work Processes                                             Collaboration Tools and Processes
Metrics/KPIsInformation
Data Acqusition Priority Aviation                              Secondary Aviation                           All Aviation                                  Maintain Aviation                             Maintain Aviation                             Maintain All Asset Data
Spatial Data
Asset Data                                           Priority Maritime                              Secondary Maritime                           All Maritime                                 Maintain Maritime
System Data
Priority Economic Development                  Secondary Economic Development               All Economic Development
Data Integration Isolated, Separate Systems                     BIM Server                                  BIM,GIS and Other Spatial Data                 Spatial and CMMS Integration                   Port-Wide CMSS System Integration              Regional Integration
Data Accessibility Workstation                                 Server-Based                                Mobile Access                               Integrated Mobile Access to CMMS               Integrated Mobile Access to Port-Wide CMMS      Regional Sharing
Limited Mobile Applications
Technology
BIM and BIM Uses   BIM Project Management                       BIM Authoring                               Predictive Maintenance                        Automated Construction Testing/Trials            Automated Construction Optimization             AI-Based CMMS/iWMS
GIS
CMMS                                 BIM Analytics - Energy Analysis, Lighting and others CMMS Full Integration                                                 AI-Based CMMS Testing/Trials             AI-Based Management and Design of Port Facilities
iWMS
Preventive Maintenance                                             BIM-GIS Integration                           IWMS Full Integration                                                                    Generative Design to Optimize Port Facilities
Predictive Maintenance                                                                                                                                                                              Testing/Trials
Automated Construction                                             Enhanced Preventive Maintenance               AR/VR Apps for Maintenance
IoT/Building Automation Systems
AI-Based Decision Making                                             IoT Pilot Implementation/BAS                   AR Apps for Passenger Services
Generative Design
Augmented Reality/Virtual Reality                                             CMMS/iWMS Testing/Trials
AR/VR Testing/Trials

Limitations of Translatable Documents

PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.