Motion 2018-11
MOTION 2018-11: A MOTION OF THE PORT OF SEATTLE COMMISSION to extend the deadline for completion of the Seattle- Tacoma International Airport gender-inclusive restroom plan identified in Motion 2018-08 to January 22, 2019. ADOPTED SEPTEMBER 25, 2018 TEXT OF THE MOTION The Port Commission hereby extends deadline from September 30, 2018, to January 22, 2019, for the completion of a plan that ensures all existing and future single-occupant restrooms at Seattle-Tacoma International Airport (Sea-Tac), beyond meeting the requirements set by the Washington State Building Code (WSBC), are designated for use by any person, regardless of sex or gender identity, and that appropriate signage is used to indicate this fact. STATEMENT IN SUPPORT OF THE MOTION On May 22, 2018, the port commission adopted Motion 2018-08, which directed port staff to develop a Sea-Tac gender-inclusive restroom plan. The plan was due to commission by September 30, 2018. The Aviation Project Management Group is currently reviewing restroom designs as part of the Sea-Tac restroom renovation project and analyzing feasibility of those designs at Sea-Tac. The analysis is expected to be complete by December 31, 2018. This analysis is a critical component of the plan and will assist the working group in providing the best recommendation for design of gender-inclusive restrooms at Sea-Tac. ADDITIONAL INFORMATION ATTACHED Motion 2018-08 directing port staff to develop a Sea-Tac gender-inclusive restroom plan. Motion 2018-11 Extension of Gender-Inclusive Restroom Plan Deadline Page 1 of 1
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.