Baggage Optimization Project Phase 1 and Phase 2 Update Presentation
Item No. 9c_supp Meeting Date: February 26, 2019 Baggage Optimization Fourth Quarter Briefing and Project Update AGENDA Project Overview 2018 Quarter 4 Update Budget Schedule Challenges Accomplishments Progress Sustainability Baggage Optimization Project 2 PROJECT OVERVIEW Replaces six individual baggage screening systems with a centralized system that optimizes the operation and functionality of the checked baggage system Key elements: 60 Million Annual Passengers (MAP) Reliability Redundancy Security Complete Overhaul of Outbound System 3 2018 Q4 Update Schedule Contractor Fell Behind on Submittals and Fabrication Phase 1: Contractor Maintaining Two Work Shifts (Mon. through Sat.) Conveyor Installation is ongoing (Critical Path) Phase 2: 100% Design Documents completed Permit set has been submitted to Building Department Developing Phase 2 Bid Documents & estimate Phase 1 Schedule Concerns 4 FINANCIAL PROGRESS REPORT Authorization Summary Capital Expense Total $450 Current Budget $444.90 M $0.15 M $445.05 M Millions $400 Current Authorization $136.16 M $0.15 M $136.31 M $350 Amount Remaining to be $308.74 M $0 M $308.74 M Authorized $300 $250 $200 Total Project (Capital + Expense) $150 Budget Spent to Forecast at Variance Date Completion $100 Soft Cost $64.99 M $23.20 M $64.99 M $0 M $50 Construction $359.43 M $41.41 M $359.43 M $0 M $- Management $20.63 M $0 M $20.63 M $0 M Management Reserve Remaining Construction Remaining Reserve Construction Spent Soft Cost Remaining $445.05 M $64.62 M $445.05 M $0 M Soft Cost Spent Financial Breakdown 5 FUNDING CONTRIBUTION (Port Contribution to Date $33.7M) Port $351M (TSA Contribution to 79% Date $30.9M) TSA $94M 21% Total Project Budget $445,050,000 Total TSA Contribution $94,043,296 Total Port Contribution $351,006,704 Amount Spent to Date $64,621,035 TSA Reimbursement to Date $30,899,397 TSA OTA/LOI Reimbursement 6 SCHEDULE Contractor Delay Extends Overall Completion Date 7 SMALL BUSINESS/APPRENTICESHIP UTILIZATION SCS/SBE APPRENTICESHIP Overall SBE Const (15%) (15%) Women (10%) SCS Const Minority (5.0%) (15%) 0.0% 50.0% 100.0% 150.0% 200.0% 0.0% 50.0% 100.0% 150.0% 200.0% Goal Actual Goal Actual Tracking Close to or Exceeding Goals status as of January 2019 8 CHALLENGES Phase 1 Construction Schedule Baggage Handling/Steel Market Conditions for Phase 2 Bid Operational Impacts Through Construction IAF Coordination - Must be operational prior to Phase 2 SSAT construction Project Coordination Have coordinated with 60+ projects so far Overcoming Challenges 9 COST INCREASES SINCE 2013 ESTIMATE 15% Increase (Adjusted for Inflation) in Domestic Baggage Projects (Estimate from Baggage Designer) Material Cost of Structural Steel and Metals Increased 25% in 2018, as a Reaction to the Tariffs Construction Market Escalation Averaged 5% per year since 2013 (Approximately 25% Over 5 Year Period) Cost / Market Conditions 10 ACCOMPLISHMENTS All conveyor equipment delivered and stored at warehouse. Phase 2 permit set has been submitted to Building Department. Structural steel on Central Terminal bump out has been completed. Purchased and received baggage handling network equipment. Conveyor Factory Acceptance Retest conducted and successful. Continued construction on conveyors, utilities and infrastructure. Baggage Optimization Construction Progress 11 SUSTAINABILITY Energy Conservation Water Conservation Optimized system is projected to result No opportunity in up to 30% energy savings Working Environment Improved ergonomics Waste Reduction Contractual requirement to recycle demolished material when possible Opportunity in Energy Conservation 12 T106 Warehouse Space 13 New Conveyor Sections 14 Structural steel on Central Terminal Bump Out 15 Factory Acceptance Testing Facility Detroit, MI 16
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.