6f. Airfield Pavement Replacement presentation
Item No. 6f_ supp Meeting Date: March 12, 2019 2019 Airfield Pavement Replacement Projects 1 2016-2020 Airfield Pavement Replacement Program Completed Milestones 2016 Airfield Pavement Projects Substantial Completion Oct. 2016 2017 Airfield Pavement Project Substantial Completion Nov. 2017 2018 Taxiway Improvement Projects Substantial Completion Nov. 2018 2019 Airfield Pavement Replacement Projects Commission Authorization for Design Oct. 2018 AAAC Presentation Dec. 2018 2020 Airfield Pavement Replacement Projects Commission Authorization for Design Nov. 2018 AAAC Presentation Dec. 2018 2016-2020 Airfield Pavement Replacement Program 2 2016-2020 Airfield Pavement Replacement Program Today's Commission Action 2019 Airfield Pavement Replacement Projects Commission Authorization for Bid, Execution, and Construction 12 Month Look Ahead 2019 Airfield Pavement Replacement Projects Construction Notice to Proceed Jul. 2019 Substantial Completion Oct. 2019 2020 Airfield Pavement Replacement Projects Commission Authorization for Bid, Execution, Construction Nov. 2019 2021-2014 Airfield Pavement Replacement Program Commission Authorization for 2021 Projects Design Sep. 2019 ** Includes Quarterly AAAC Presentation Updates 2016-2020 Airfield Pavement Replacement Program continued 3 2019 Airfield Pavement Replacement Projects Scope of Work 1. Electrical Hand-hole Upgrades Service Road Near Fuel Farm Taxiway A 2. Individual Concrete Panel Replacement South Satellite Taxilane North Satellite Taxilane 3. Asphalt Pavement Replacement Hardstand 7 Fire-lane South Satellite Apron Concourse D Apron Cargo 4 Maintenance Laydown Area 4. Surface Movement Guidance Control System (SMGCS) Replacement of failed electrical light circuit on Taxiway A Scope of Work 4 2019 Airfield Pavement Replacement Projects 1. Electrical Handhole Upgrades 5 2019 Airfield Pavement Replacement Projects Night work using Quick Setting High Early Strength Concrete 2. Individual Concrete Panel Replacement 6 2019 Airfield Pavement Replacement Projects 3. Asphalt Pavement Replacement 7 2019 Airfield Pavement Replacement Projects Replacement of failed electrical light circuit on Taxiway A 4. Surface Movement Guidance Control System (SMGCS) 8 2019 Airfield Pavement Replacement Projects Significantly less operational impacts as compared to 2018 Taxiway Project Most work areas are located outside of aircraft movement areas Taxiway work will be performed during off-peak hours We will continue to communicate closely the Airlines, Air Traffic Control and Airport Operations to provide up to date information and close coordination throughout construction Operational Impacts 9
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.