8c. Bell Harbor International Conference Center Modernization Presentation
Item No.: 8c_Attach Pier 66 / Bell Harbor International ConferenceMeeting Date: June 11, 2019 Center Modernization PIER 66 / BELL HARBOR INTERNATIONAL CONFERENCE CENTER MODERNIZATON CURRENT MEETING INDUSTRY TRENDS Delegate evolution: Content evolution: Facility evolution: Value driven Focused, shorter durations Customizable Participatory not passive Variety Flexible configurations Networking focused Increased focus on education Technology: virtual + physical space Engagement & interactivity Connectedto place Content choice Destination experience 2 DESIGN GOALS Maximize impact of waterfront location Connect all levels of the facility and improve accessibility Increase flexibility / revenue potential Increase ability to host concurrent events Create transparency, optimize daylight, and maximize waterfront views Upgrade technology, electrical power, wayfinding, finishes and lighting Incorporate sustainable features 3 EXISTING CONDITIONS View of the existing Waterlink Gallery Pre-function outside Harbor Room and Bay Auditorium Pre-function outside Harbor Room and Bay Auditorium 4 PRE-FUNCTION ENHANCED WATER VIEWS AND ENTRY TO HARBOR 5 MODERNIZATION LAYOUT Welcoming entry experience Enlarged and flexible Pre-function spaces Enhanced transparency throughout Operable partitions at Harbor & Marina Conference Rooms Enlarged Marina Conference Room Communicating Ramp and Stair 6 COMMUNICATING STAIRS 7 COMMUNICATING RAMP 8 SUSTAINABILITY High efficiency lighting fixtures and controls Low flow plumbing fixtures Enhanced daylighting and views Creating a healthy environment for conference guests and staff (durable, long lasting, non-toxic materials) Eliminate red list materials from interior materials & finishes Sustainable non-toxic furniture Construction waste management & air quality control 9 SIGNAGE AND WAYFINDING EXTERIOR 10 RISK MITIGATION To help reduce construction related risks, we are doing the following: Prepared quality bid documents and encourage bidder participation Thorough pre-bid walkthrough and 360 degree images to enhance understanding of work areas prior to bid 3rd Floor Conference Center closed during construction (mid-Nov to mid-May) Allocated higher construction contingency (15%) Providing bid alternate Co-locate Construction Management team inside conference center spaces 11 BUDGET AND SCHEDULE BUDGET TOTAL $11.56M Also includes FFE and Kitchen Upgrades SCHEDULE Advertise:June 2019 Construction Start:November 2019 Restart Operations:May 2020 12 TEAM PORT OF SEATTLE DESIGN TEAM Dave McFadden, Executive Sponsor ARCHITECT: LMN Melinda Miller, Director, Real Estate Asset Management Rafael Vinoly, Design Partner/Principal in Charge Fred Chou, Capital Program Leader Osama, Quotah, Project Manager Masako Wada, Project Interior Designer CONFERENCE CENTER OPERATOR (COLUMBIA HOSPITALITY) Mette Greenshields,Project Architect Brian Flaherty, Managing Director David Backs, Interior Designer Linda Jones, General Manager John Woloszyn, Specifications STRUCTURAL: KPFF MECHANICAL/ELECTRICAL: MAZZETTI LIGHTING: HLB ACCOUSTICAL/AUDIO VISUAL: ARUP SIGNAGE: STUDIO MATTHEWS CODE/LIFE SAFETY: PIELOW CONSULTING COST ESTIMATING: JMB CONSULTING GROUP 13 APPENDIX 14 EXISTING CONDITIONS View of the existing Marina Conference Room View of the existing Harbor Room w/ Inlet and the Pre-function beyond 15 EXISTING FLOOR PLAN 16 MODERNIZATION FLOOR PLAN 17 ENTRY LOBBY AND CONCIERGE EXPANDED LOBBY AND CONCIERGE 18 PRE-FUNCTION EXPANDED PRE-FUNCTION AND VIEWS INTO SOUND 19 HARBOR ENHANCED BALLROOM 20 ART PLAN 21 MARINA pee el. 71N at / \ i' \ / \ ' \ ' \ J 7 No 3 \ I r- \ | _ { \ \ ' wl \N oz [ill vf NA BZ AN Vd i A NS NORTH ELEVATION EAST ELEVATION FY ANC OPERABLE PARTITION CLOSED - TWO ROOMS OPERABLE PARTITION OPEN - LARGE ROOM 22 SOUND \ 7 \ (38) x) (k) Jk WESTELEVATION EAST ELEVATION NS = ] __ = 1 ] il bi Tn GLAZED PARTITION WITH VIEWS TO THE PRE-FUNCTION 23 BAY AUDITORIUM EXPANDED ; / + 2 new rows of seating + Additional accessible seating at front and back OFFICE 118 3% BAYAUDITORIUM , 0 > / [0 TF qn cy yo don 0 H ol = = FI 24 SIGNAGE AND WAYFINDING EXTERIOR 25 SIGNAGE AND WAYFINDING INTERIOR 26
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.